ID |
Date |
Author |
Category |
Subject |
Year |
Text |
 |
12
|
Fri Jun 7 15:57:41 2019 |
Jan | DAQ | DAQ with & without MDPP-16 | | The DAQ located in
../esrdaq_2018/r4l-58/
|
|
11
|
Fri Jun 7 14:39:36 2019 |
Jan | Detectors | Pt100 installation & readout | | The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires. |
 |
10
|
Fri Jun 7 14:28:09 2019 |
Jan | Runs | prerun003 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun003
~20min run
|
|
9
|
Fri Jun 7 13:52:32 2019 |
Jan | Runs | prerun002 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun002
~20min run
|
|
8
|
Fri Jun 7 10:18:23 2019 |
Jan | Runs | prerun001 - MixedAlpha | | save point: lxg1275:/datalocal1/e127/predata/prerun001-root
~2h run
|
|
7
|
Wed Jun 5 11:29:13 2019 |
Jan | Detectors | position/channel calib. | | This is the first position calibration done
with the detector installed in the holder.
The goal is to assign rough positions (top/bottom/left/right) |
|
6
|
Fri Apr 5 06:05:55 2019 |
Jan | DAQ | making changes to the DAQ | | If you need to add or change a module of the
VME crate you need to follow this proceedure:
|
|
5
|
Fri Apr 5 05:46:20 2019 |
Jan | DAQ | running DRASI for (p,g) | | We now have a drasi DAQ running for our (p,g)
experiments.
The RIO we have it installed right now is: |
|
4
|
Wed Feb 6 10:16:09 2019 |
Laszlo Varga | General | Study on scraping | | A publication on scraping systems suggested
by Siegbert.
In the study they have used cylindrical "high-quality" |
|
3
|
Wed Feb 6 10:04:23 2019 |
Laszlo Varga | Simulations | Background subtraction for 124Xe, 109In, 73As made by MOCADI | | General remarks to the MOCADI simulations:
scraper size vertically > (p,g) spot at the
scraping position --> (p,g) can be separated |
|
2
|
Thu Jan 17 08:45:43 2019 |
Jan | Detectors | Micron W1 DSSSD - technical information | | Attached are the spec sheets and design drawings
of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo |
6x |
1
|
Thu Sep 13 11:42:33 2018 |
Jan Glorius | Collaboration | Proposal | | Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017. |
 |