HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 5 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Category Subject Year Text Attachments
  499   Thu May 27 14:38:14 2021 Yuri, JanRunsRun 01552021
No. of stacks: 10 
length SC10: 2x 5.5s 
  
  498   Thu May 27 14:33:05 2021 Jan, Beatriz, AlexRunsRun 0154 - crap run2021No. of stacks: 10 
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  497   Thu May 27 13:48:18 2021 Helmut WeickAcceleratorFRS wrong status display for one day2021By checking the log files we realized that
from yesterday 26.05. 13:44 - today 13:05
the FRS degrader was shown as out.
 drivestat-log.JPG 
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
  
  495   Thu May 27 13:24:29 2021 Yuri, JanRunsRun 01532021All runs before (since 13:40 26/05/21) were
taken without the degrader in FRS!
  
  494   Thu May 27 12:41:25 2021 Yuri, JanRunsRun 01522021No. of stacks: 10 
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  493   Thu May 27 11:36:23 2021 Yuri, Beatriz, JanRunsRun 01512021Power supplies for correction coils were in
failure. 
No effect seen in schottky after reset and
  
  492   Thu May 27 10:21:41 2021 Yuri, BeatrizRunsRun 01502021No. of stacks: 10
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  491   Thu May 27 09:39:15 2021 Yuri, BeatrizRunsRun 01492021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  490   Thu May 27 08:26:15 2021 Yuri, BeatrizGeneralOptimisation beam position on target and scraper position2021Optimised overlap with the target by shifting
the beam from -11.5 to 12.8 mm. This lead
to an increase of the DSSSD rate of a factor
  
  489   Thu May 27 08:23:05 2021 Yuri, BeatrizRunsRun 01482021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  488   Thu May 27 05:48:12 2021 Pierre-Michel, EnisRunsRun 01472021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  487   Thu May 27 04:48:19 2021 Pierre-Michel, EnisRunsRun 01462021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  486   Thu May 27 03:47:18 2021 Pierre-Michel, EnisRunsRun 01452021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  485   Thu May 27 02:47:00 2021 Pierre-Michel, EnisRunsRun 01442021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  484   Thu May 27 01:46:48 2021 Pierre-Michel, EnisRunsRun 01432021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  483   Thu May 27 00:46:33 2021 Pierre-Michel, EnisRunsRun 01422021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  482   Wed May 26 23:46:49 2021 Pierre-Michel, EnisRunsRun 01412021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  481   Wed May 26 22:42:56 2021 Ragan, ThanassisRunsRun 01402021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
  480   Wed May 26 21:42:46 2021 Ragan, ThanassisRunsRun 01392021No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
  
ELOG V3.1.5-fc6679b