Wed May 26 20:42:31 2021, Ragan, Thanassis, Runs, Run 0138, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
|
Wed May 26 20:34:50 2021, Ragan, Thanassis, Detectors, Detector filling, 2021
|
Jan is filling the detector after run0137. |
Wed May 26 20:26:15 2021, Ragan, Thanassis, Runs, Run 0137, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
|
Wed May 26 19:25:54 2021, Ragan, Thanassis, Runs, Run 0136, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
|
Wed May 26 19:08:17 2021, Ragan, Thanassis, General, Cooler down, 2021
|
We stopped data taking as the electron cooler is down. |
Wed May 26 18:37:34 2021, Ragan, Thanassis, General, Optimization target bump/overlapp, 2021
|
| bump position | X ray bdt ON | Si rate ON |
---------------------------------------------
| -11.5 | 120 | 4-5 |
|
Wed May 26 18:36:08 2021, Ragan, Thanassis, Runs, Run 0135, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
|
Wed May 26 15:30:03 2021, Ragan, Thanassis, General, Changing the beam energy , 2021
|
The ESR team is changing the beam energy to 6 MeV/u. |
Wed May 26 14:48:10 2021, Ragan, Thanassis, Runs, Run 0134, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm
|
Wed May 26 14:28:23 2021, Jan, Analysis, Xrays from 118Te & 124Xe, 2021
|
Attached is a plot of the uncalibrated energy spectra taken with the 90 degree xray detector for 118Te (red) and 124Xe (blue).
Shown is the region covering the K-alpha and K-REC peaks.
|
Wed May 26 13:49:36 2021, Rene, Tino, Runs, Run 0133, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 12:49:52 2021, Rene, Tino, Runs, Run 0132, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 11:47:48 2021, Rene, Tino, Runs, Run 0131, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 10:34:18 2021, Rene, Tino, Runs, Run 0130, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 09:28:12 2021, Rene, Tino, Runs, Run 0129, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 07:20:14 2021, Rene, Tino, Runs, Run 0128, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 07:08:07 2021, Laszlo, Calibration, quick and dirty calibration coefficients for the Si channels, 2021
|
The coefficients are produced only quick and dirty, S_x=1 was fixed to 1.
E = E_x = E_y = S_x*A_x = S_y*A_y
|
Wed May 26 06:27:18 2021, Michele, Beatriz, Runs, Run 0127, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 05:20:29 2021, Michele, Cobus, Runs, Run 0126, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|
Wed May 26 04:21:16 2021, Michele, Cobus, Runs, Run 0125, 2021
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
|