HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te, Page 6 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Yeardown Text Attachments
  386   Sat May 22 14:53:34 2021 Beatriz et al.GeneralDSSD Movement2021DSSSD moved to the most in position in order
to try to scrape the beam with the scraper.
  
  387   Sat May 22 16:28:10 2021 LaszloGeneralDSSSD movement2021The DSSSD is moved back to its measurement
position(-25mm).
  
  388   Sat May 22 16:29:07 2021 Laszlo et al.Generalcoolers are back2021we can measure again.

(please write a detailed description if needed)
  
  389   Sat May 22 17:01:33 2021 Pierre-Michel & EnisRunsRun 00722021open file : e127b_run0072.lmd

beam: 124Xe54+
  
  390   Sat May 22 17:13:48 2021 LaszloDetectorsSi position changed2021Si was moved from -25 mm to -19 mm before
run 0072.
  
  391   Sat May 22 17:15:26 2021 LaszloGeneralScraper position2021We found the beam axis with the scraper to
be -17.5 mm.
The Scraper position set to +12.5 mm, 30
  
  392   Sat May 22 18:05:22 2021 Pierre-Michel & EnisRunsRun 00732021open file : e127b_run0073.lmd

beam: 124Xe54+
  
  393   Sat May 22 19:05:13 2021 Pierre-Michel & EnisRunsRun 00742021Note: SIS lost HF, no beam since 19:21. Stopped
run early
  
  394   Sat May 22 19:32:28 2021 Pierre-Michel & EnisRunsRun 00752021open file : e127b_run0075.lmd

beam: 124Xe54+
  
  395   Sat May 22 20:46:19 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021The scraper was moved into 2.5mm in absolute
which corresponds to 20mm away from the beam
axis.
  
  396   Sat May 22 20:47:39 2021 Pierre-Michel & EnisRunsRun 00762021open file : e127b_run0076.lmd

beam: 124Xe54+
  
  397   Sat May 22 21:33:22 2021 LaszloDetectorsXray detectors are filled at 90 and 352021    
  398   Sat May 22 21:40:09 2021 Pierre-Michel & EnisRunsRun 00772021open file : e127b_run0077.lmd

beam: 124Xe54+
  
  399   Sat May 22 22:25:42 2021 Pierre-Michel & EnisRunsRun 00782021open file : e127b_run0078.lmd

beam: 124Xe54+
  
  400   Sat May 22 22:29:48 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021The scraper was moved into 7.5 mm in absolute
which corresponds to 25 mm away from the
beam axis.
  
  401   Sat May 22 23:28:08 2021 Philipp, BennyRunsRun 00792021open file : e127b_run0079.lmd

beam: 124Xe54+
  
  402   Sun May 23 00:35:33 2021 Philipp, BennyRunsRun 00802021open file : e127b_run0080.lmd

beam: 124Xe54+
  
  403   Sun May 23 01:36:04 2021 Philipp, BennyRunsRun 00812021open file : e127b_run0081.lmd

beam: 124Xe54+
  
  404   Sun May 23 02:16:47 2021 LaszloGeneralquick comparison between different scraping positions2021So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
 scraping_30.pngscraping_25.pngscraping_20.png 
  405   Sun May 23 02:36:07 2021 Philipp, BennyRunsRun 00822021open file : e127b_run0082.lmd

beam: 124Xe54+
  
ELOG V3.1.5-fc6679b