ID |
Date |
Author |
Category |
Subject |
Year |
181
|
Sun Mar 22 11:28:02 2020 |
Esther, Ragan | Runs | run entry - run080 | |
open file : run080
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 10:55 , first file: run080_0001.lmd
run stop at 11:36: , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 11:30 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 33 Hz
Xray_145: 26 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.06 uA
SIS particles before: ~3.0e9
ESR current at injection: 10 uA
ESR particles after decel.:
Target ON density: 1.8e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
176
|
Sun Mar 22 09:52:09 2020 |
Esther, Ragan | Runs | run entry - run079 | |
open file : run079
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 09:55 , first file: run079_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 09:55 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 5 Hz
Xray_90: 52 Hz
Xray_145: 19 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.08 uA
SIS particles before: ~2.2e9
ESR current at injection: 6 uA
ESR particles after decel.:
Target ON density: 2.5e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
177
|
Sun Mar 22 10:05:37 2020 |
Esther, Ragan | General | run entry - run079 | |
The intensity of beam from SIS is less due to some issues with UNILAc. |
178
|
Sun Mar 22 10:22:27 2020 |
Esther, Ragan | Runs | run entry - run079 | |
open file : run079
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 09:55 , first file: run079_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 10:25 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 59 Hz
Xray_145: 28 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.07 uA
SIS particles before: ~3.0e9
ESR current at injection: 7 uA
ESR particles after decel.:
Target ON density: 2.4e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
179
|
Sun Mar 22 10:28:27 2020 |
Esther, Ragan | General | run entry - run079 | |
The problem at UNILAC seems to have solved itself. Intensity is returning to normal. |
174
|
Sun Mar 22 08:52:45 2020 |
Esther | Runs | run entry - run078 | |
open file : run078
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 08:55 , first file: run078_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 08:55 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 7 Hz
Xray_90: 46 Hz
Xray_145: 23 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.09 uA
SIS particles before: ~2.1e9
ESR current at injection: 8 uA
ESR particles after decel.:
Target ON density: 2.6e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
175
|
Sun Mar 22 09:21:55 2020 |
Esther | Runs | run entry - run078 | |
open file : run078
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 08:55 , first file: run078_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 09:23 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 58 Hz
Xray_145: 15 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.04 uA
SIS particles before: ~2.2e9
ESR current at injection: 8 uA
ESR particles after decel.:
Target ON density: 2.5e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
172
|
Sun Mar 22 07:53:30 2020 |
Dima, Esther | Runs | run entry - run077 | |
open file : run077
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 07:54 , first file: run077_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 07:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 38 Hz
Xray_145: 17 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.07 uA
SIS particles before: ~2.5e9
ESR current at injection: 10 uA
ESR particles after decel.:
Target ON density: 2.8e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
173
|
Sun Mar 22 08:22:57 2020 |
Esther | Runs | run entry - run077 | |
open file : run077
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 07:54 , first file: run077_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 08:25 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 46 Hz
Xray_145: 24 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.08 uA
SIS particles before: ~3.8e9
ESR current at injection: 11 uA
ESR particles after decel.:
Target ON density: 1.6e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
170
|
Sun Mar 22 06:54:42 2020 |
Dima, Pierre | Runs | run entry - run076 | |
open file : run076
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 06:54 , first file: run076_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 06:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 8 Hz
Xray_90: 48 Hz
Xray_145: 16 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.05 uA
SIS particles before: ~2.5e9
ESR current at injection: 10 uA
ESR particles after decel.:
Target ON density: 3.2e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
171
|
Sun Mar 22 07:23:44 2020 |
Dima, Esther | Runs | run entry - run076 | |
open file : run076
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 06:54 , first file: run076_0001.lmd
run stop at : , last file: run075_0xxx.lmd
_______________________________________________________________________________
time: 07:26 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 56 Hz
Xray_145: 21 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.05 uA
SIS particles before: ~2.6e9
ESR current at injection: 10 uA
ESR particles after decel.:
Target ON density: 2.9e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle
copy and repeat the above (below the line) every 30 minutes |
168
|
Sun Mar 22 05:54:34 2020 |
Dima, Pierre | Runs | run entry - run075 | |
open file : run075
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 05:54 , first file: run075_0001.lmd
run stop at : , last file: run074_0xxx.lmd
_______________________________________________________________________________
time: 05:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 3 Hz
Xray_90: 46 Hz
Xray_145: 18 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.07 uA
SIS particles before: ~1.9e9
ESR current at injection: 22 uA
ESR particles after decel.:
Target ON density: 3.3e13
copy and repeat the above (below the line) every 30 minutes |
169
|
Sun Mar 22 06:23:43 2020 |
Dima, Pierre | Runs | run entry - run075 | |
open file : run075
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 05:54 , first file: run075_0001.lmd
run stop at : , last file: run074_0xxx.lmd
_______________________________________________________________________________
time: 06:24 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 58 Hz
Xray_145: 25 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.07 uA
SIS particles before: ~1.9e9
ESR current at injection: 22 uA
ESR particles after decel.:
Target ON density: 3.4e13
run 075 has been stopped because two brave warriors went to ESR for filling the LN in our detectors in the name of Physics!
copy and repeat the above (below the line) every 30 minutes |
166
|
Sun Mar 22 04:57:44 2020 |
Dima, Pierre | Runs | run entry - run074 | |
open file : run074
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 04:57 , first file: run074_0001.lmd
run stop at : , last file: run073_0xxx.lmd
_______________________________________________________________________________
time: 04:57 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 64 Hz
Xray_145: 28 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.08 uA
SIS particles before: ~1.7e9
ESR current at injection: 22 uA
ESR particles after decel.:
Target ON density: 3.8e13
copy and repeat the above (below the line) every 30 minutes |
167
|
Sun Mar 22 05:26:47 2020 |
Dima, Pierre | Runs | run entry - run074 | |
open file : run074
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 04:57 , first file: run074_0001.lmd
run stop at : , last file: run073_0xxx.lmd
_______________________________________________________________________________
time: 05:25 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 70 Hz
Xray_145: 17 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.09 uA
SIS particles before: ~1.9e9
ESR current at injection: 22 uA
ESR particles after decel.:
Target ON density: 3.7e13
copy and repeat the above (below the line) every 30 minutes |
164
|
Sun Mar 22 03:54:24 2020 |
Dima, Pierre | Runs | run entry - run073 | |
open file : run073
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 03:54 , first file: run073_0001.lmd
run stop at : , last file: run072_0xxx.lmd
_______________________________________________________________________________
time: 03:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 0 Hz
Xray_90: 53 Hz
Xray_145: 19 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.09 uA
SIS particles before: ~1.8e9
ESR current at injection: 21 uA
ESR particles after decel.:
Target ON density: 3.6e13
copy and repeat the above (below the line) every 30 minutes |
165
|
Sun Mar 22 04:31:45 2020 |
Dima, Pierre | Runs | run entry - run073 | |
open file : run073
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 03:54 , first file: run073_0001.lmd
run stop at : , last file: run072_0xxx.lmd
_______________________________________________________________________________
time: 04:24 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 4 Hz
Xray_90: 54 Hz
Xray_145: 20 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.06 uA
SIS particles before: ~1.7e9
ESR current at injection: 21 uA
ESR particles after decel.:
Target ON density: 3.8e13
copy and repeat the above (below the line) every 30 minutes |
162
|
Sun Mar 22 02:55:35 2020 |
Dima, Pierre | Runs | run entry - run072 | |
open file : run072
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 02:54 , first file: run072_0001.lmd
run stop at : , last file: run071_0xxx.lmd
_______________________________________________________________________________
time: 02:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 46 Hz
Xray_145: 25 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.16 uA
SIS particles before: ~1.75e9
ESR current at injection: 20 uA
ESR particles after decel.:
Target ON density: 4e13
copy and repeat the above (below the line) every 30 minutes |
163
|
Sun Mar 22 03:24:39 2020 |
Dima, Pierre | Runs | run entry - run072 | |
open file : run072
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 02:54 , first file: run072_0001.lmd
run stop at : , last file: run071_0xxx.lmd
_______________________________________________________________________________
time: 03:24 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 48 Hz
Xray_145: 25 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.09 uA
SIS particles before: ~1.8e9
ESR current at injection: 21 uA
ESR particles after decel.:
Target ON density: 3.6e13
copy and repeat the above (below the line) every 30 minutes |
160
|
Sun Mar 22 01:54:49 2020 |
Dima, Pierre | Runs | run entry - run071 | |
open file : run071
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 01:54 , first file: run071_0001.lmd
run stop at : , last file: run070_0xxx.lmd
_______________________________________________________________________________
time: 01:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 57 Hz
Xray_145: 22 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.08 uA
SIS particles before: ~1.8e9
ESR current at injection: 21 uA
ESR particles after decel.:
Target ON density: 5.4e13
copy and repeat the above (below the line) every 30 minutes |