HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 9 of 29  Not logged in ELOG logo
ID Date Author Category Subject Year
  418   Mon May 24 13:14:59 2021 Sophia, MarioRunsRun 00932021
No. of stacks: 5
length SC10: 2x 5.5s

open file : e127b_run0093.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 13:14:44 24.05.2021
run stop: 14:10:55 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  417   Mon May 24 12:29:20 2021 Sophia, MarioRunsRun 00922021
20 stacks now

open file : e127b_run0092.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 12:28:57 24.05.2021
run stop: 13:13:56 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  416   Mon May 24 11:25:46 2021 Sophia, MarioRunsRun 00912021
open file : e127b_run0091.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 11:25:08 25.05.2021
run stop: 12:26:31 24.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  415   Mon May 24 11:12:38 2021 Sophia, MarioRunsRun 00902021
DAQ node 2 was not started!


open file : e127b_run0090.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 11:10:18 23.05.2021
run stop:
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 0 Hz
Xray_ON_bdt: 0 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 7.6e8
ESR current at injection: 1e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14
  414   Mon May 24 06:30:42 2021 RaganDAQNTCAP2021
NTCAP started for recording Schottky data

SC_2021-05-24_06-29-31
\IQ_2021-05-24_06-29-31

Reference level: -30 dBm
Carrier frequency: 245 M
IQ Rate: 20 MS/s

RF attenuation (dB): 40
IF attenuation (dB): 19.9288

masterpath:
o:\E143\iq


ESR settings:
We recorded 3-4 full cycles with 5 stacks.
Then we recorded in SC5 manipulation for 10 min and afterwards in SC3 manipulation for 10 min.
  413   Mon May 24 05:20:36 2021 Helmut, Yuri, Faraz, SergeyAcceleratorFRS setup2021
Logbook from start of FRS until 118Te injection
  412   Sun May 23 23:44:37 2021 JanRunsRun 0088 - background BaF/Xray2021
open file : e127b_run0088.lmd

no beam

purpose:
BG measurement for Xray and BaF

run start: 23:44:09 23.05.2021
run stop:
_______________________________________________________________________________

ON Rates
Si_OFF_bdt: Hz
Xray_ON_bdt: 60Hz
BaF_OR: 3000Hz
  411   Sun May 23 15:36:10 2021 Rui-Jiu Chen& AlexGeneralAll shifts until Monday morning (24th May) have been cancelled. 2021
All shifts until Monday morning (24th May) have been cancelled. 
Next update on further situation (in particular concerning the morning shift on Monday) will be given tonight .
  410   Sun May 23 07:40:48 2021 Michele, BeatrizRunsRun 00872021
open file : e127b_run0086.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 07:40:25 23.05.2021
run stop: 08:07:46 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 3.3e7
ESR current at injection: 1.0e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
  409   Sun May 23 06:33:46 2021 Philipp, BennyRunsRun 00862021
open file : e127b_run0086.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 06:33:41 23.05.2021
run stop: 07:39:40 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 800 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 2.8e7
ESR current at injection: 1.3e7
ESR particles after decel.: 2.2e6
Target ON density: 1.0e14
  408   Sun May 23 05:35:07 2021 Philipp, BennyRunsRun 00852021
open file : e127b_run0085.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 05:35:04 23.05.2021
run stop: 06:33:22 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 3.8e7
ESR current at injection: 1.3e7
ESR particles after decel.: 2.0e6
Target ON density: 1.0e14
  407   Sun May 23 04:36:15 2021 Philipp, BennyRunsRun 00842021
open file : e127b_run0084.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 04:36:12 23.05.2021
run stop: 05:34:45 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 10 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: bug in display
ESR current at injection: 1.2e7
ESR particles after decel.: 3.0e6
Target ON density: 1.0e14
  406   Sun May 23 03:34:44 2021 Philipp, BennyRunsRun 00832021
open file : e127b_run0083.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 03:34:50 23.05.2021
run stop: 04:35:42 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: bug in display
ESR current at injection: 1e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
  405   Sun May 23 02:36:07 2021 Philipp, BennyRunsRun 00822021
open file : e127b_run0082.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 02:36:02 23.05.2021
run stop: 03:34:08 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 600 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 4.5e7
ESR current at injection: 8e6
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
  404   Sun May 23 02:16:47 2021 LaszloGeneralquick comparison between different scraping positions2021
So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
- 20mm away from beam axis (lmd76-77)

below one can see the comparison of the scrapings for the DSSSD spectrum. Please mind the different amount of data collected
  403   Sun May 23 01:36:04 2021 Philipp, BennyRunsRun 00812021
open file : e127b_run0081.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 01:36:06 23.05.2021
run stop: 02:35:37 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 5.5e7
ESR current at injection: 1.2e7
ESR particles after decel.: 2.2e6
Target ON density: 1.0e14
  402   Sun May 23 00:35:33 2021 Philipp, BennyRunsRun 00802021
open file : e127b_run0080.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 00:35:16 23.05.2021
run stop: 01:35:21 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: xxxxx scaling problem, value negative, seem to be a visual problem only
ESR current at injection: 1.6e7
ESR particles after decel.: 2e6
Target ON density: 1.0e14
  401   Sat May 22 23:28:08 2021 Philipp, BennyRunsRun 00792021
open file : e127b_run0079.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 23:35:43 22.05.2021
run stop: 00:34:46 23.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 12 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1e8
ESR current at injection: 3.5e7
ESR particles after decel.: 3e6
Target ON density: 1.0e14
  400   Sat May 22 22:29:48 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021
The scraper was moved into 7.5 mm in absolute which corresponds to 25 mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 7.5 mm

Position 2
GE01DD1IG (SC9) 7.5 mm
  399   Sat May 22 22:25:42 2021 Pierre-Michel & EnisRunsRun 00782021
open file : e127b_run0078.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement with scraper

Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)

run start: 22:25:23 22-05-2021
run stop: 23:27:16 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 9e7
ESR current at injection: 2.2e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14

Info: Dipole MU2 did no longer work, reset during the run, tried to reset at 23:12 Uhr. Problem not solved at the end of the run. Problematic injection structure
ELOG V3.1.5-fc6679b