HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+, Page 12 of 12  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authorup Category Subject Text Attachments
  102   Tue Apr 5 20:58:53 2022 WilfriedLaserTrigger for LaserElectronic for the timing of the laser puls
optimized. The problem with the broad photodiode
histograms is solved.
 TriggerForLaser_05-04-2022.PNGTriggerLaser_Cabling.jpg 
  148   Fri Apr 8 02:14:05 2022 WilfriedLaserLaser timings adjusted Since we use the middle window as a reference
for the laser pulse timing, the fact that
the window is 2.25 m behind the target has
  
  164   Fri Apr 8 14:43:50 2022 WilfriedDAQlaser timing - Q-switch startbelow are my notes concerning laser timing
/ Q-switch start
 IMG_20220408_143753_resized_20220408_023840170.jpg 
  168   Fri Apr 8 15:45:24 2022 YL Spectrum manipulation 5See attached  IMG_3027.JPG 
  68   Sat Apr 2 18:17:31 2022 YuriAcceleratorPhoto-IdentificationJust a photo of the ID  9FFA52AA-1F75-470E-AD1B-E1A612A3F7D6.jpeg 
  69   Sat Apr 2 18:19:47 2022 YuriAcceleratorScraping   trim.3539D818-8003-4093-866E-2C4F619E614F.MOV 
  167   Fri Apr 8 15:42:20 2022 YuriAcceleratorSlits in the TE lineAt around 15:00, The slits in the TE line
were changed to :
TE4DS5HL -12 mm -> -20 mm
  
  131   Thu Apr 7 08:14:03 2022 Yuri & DanyalGeneral229Th89+ line in Schottky GLOBAL calculations for the "content" of the
Th line in the Schottky spectrum
(380 MeV/u exit energy, equilibrium charge
  
  74   Sun Apr 3 10:28:25 2022 Yuri (Helmut Weick)AcceleratorDistance cooler - detectorCalculation from Helmut Weick
Distance e-cooler to particle detectors chamber:
“This is half of ESR plus distance target
  
  75   Sun Apr 3 10:35:20 2022 Yuri (Sergey)AcceleratorDipole correctionThe ramp for moving the beam to the central
orbit
To be inserted into manipulation, GE01MU1
  
  166   Fri Apr 8 15:39:36 2022 allRunsfirst data after timing set upstarted taking data again

started at 15:40  
  
  121   Thu Apr 7 02:32:29 2022 all on shiftRunsFirst Scans 322-320nmLaser scanning from 322-320 steps 0.01nm/s
DAQ1: lxg1927:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
  
  162   Fri Apr 8 14:12:57 2022 morning shiftDAQtiming for h=1The timing for h=1 has been set up 

The time window is now twice as large as
 2022-04-08_timing_h1_final.png 
ELOG V3.1.5-fc6679b