HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+, Page 12 of 12  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Thu Oct 14 10:21:46 2021, Rodolfo, Detectors, Dismounting Cu-Mirror AusbauCuSpiegel_2021.jpg
We have dismounted the parabolic Cu-Mirror at ESR on 13.10.2021 
Entry  Wed Sep 8 21:44:55 2021, Rodolfo, General, Preparation 
[TABLE border="1"]
[B]Status[/B]|[B]Arbeitspaket[/B]|[COLOR=chocolate][B]Kommentare[/B][/COLOR]
|-
Entry  Fri Aug 6 10:40:54 2021, Rodolfo, DAQ, mbs in atplaser 
The "MBS program" (data acquisition) is now located within atplaser@r4l-41, in the folder "th21":

Entry  Fri Aug 6 10:23:00 2021, Rodolfo, DAQ, atplaser on r4l-41 
The user [B]atplaser[/B] is now existing on the [B]R4L-XY[/B] nodes for the ESR group.

R4 = [B]R[/B]IO[B]4[/B] Computer
Entry  Mon Aug 2 10:54:44 2021, Rodolfo, Laser, Quanta Ray - Water leak in the power supply QRAY_WaterPump.jpg
After fixing the broken water connector in the laser head a new water leak appeared in the Quanta-Ray power supply. 

We found the leak in the water pump flow line (arrow up). We took the water connectors appart, rebuilt the teflon seeling and put the water connectors
Entry  Wed Jul 28 13:31:22 2021, Rodolfo, General, Air filters Flowbox_Filters.png
Filters (Hepa-) inside the flow boxes have been replaced.
Entry  Mon Jul 26 17:58:52 2021, Rodolfo, Laser, Water Filters QRAY_DeionizingFilter.jpg
The water filters (deioninzing and particle) have been replaced. 
Entry  Mon Jul 26 17:15:47 2021, Rodolfo, Laser, Quanta Ray - Water leak QRAY_AnschlussGeplatzt.jpg
On Thursday afternoon (22.07.2021) a water connector has broken and water has been spilled in the laser head. 
ELOG V3.1.5-fc6679b