HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+, Page 9 of 12  Not logged in ELOG logo
Entry  Sun Apr 3 00:41:45 2022, Ken Ueberholz , , Xuv-Detektor Signale  20220403_004944.jpg
The Xuv-detector cabel channels seem to be 
wrongly labeled in the Messhütte (see 
picture) and are propably also wrongly 
Entry  Sat Apr 2 23:16:55 2022, Carsten, , Cu mirror and CsI moved in and out of the ring 
Ken tested the Cu-mirror and CsI disk Detector. They move without a problem and don't scrape the ion beam.
Entry  Sat Apr 2 22:43:36 2022, Carsten, , Ring set-up for 229/89+, scraped and bunched, Iel=500mA at injection and 100mA during measurment 
The ring SIS/ESR were set up for 229/89+. Pölease note that this not only 1e- Th but ponteially also the isobars of Ac (0e-1)/Pa(2e-, strongest) and U(3e-).
SIS eenrgy plus 3.5 MeV/u w.r.t. to the 238U92+ settings. We nearly don't see any of the primary beam in the ring
Cooling energy is 208998 KeV (read from the ESR multimeter).
Entry  Sat Apr 2 18:28:47 2022, Markus/Bernd, Accelerator, SIS setting complete for fragments in ESR: 2022-04-02_18-09-10_SIS18_FAST_E142_20220325_110213.C1.txt  
# Version: 1.2 # Comment: ParamModi Export at 2022-04-02T18:09:36.402593+02:00[Europe/Berlin] # Context: SIS18_FAST_E142_20220325_110213.C1 # Columns: PARAMETERNAME,VALUE,UNIT,BEAMPROCESSPURPOSE

LOGICAL.GTK7MU5/HKICK,0.0,rad,TRANSFER_INJECTION LOGICAL.GTK7MU5/HKICK_THEO,0.0018,rad,TRANSFER_INJECTION LOGICAL.GTK7BC1L/HKICK,0.0,rad,TRANSFER_INJECTION
Entry  Sat Apr 2 18:19:47 2022, Yuri, Accelerator, Scraping trim.3539D818-8003-4093-866E-2C4F619E614F.MOV
 
Entry  Sat Apr 2 18:17:31 2022, Yuri, Accelerator, Photo-Identification 9FFA52AA-1F75-470E-AD1B-E1A612A3F7D6.jpeg
Just a photo of the ID
Entry  Sat Apr 2 17:47:16 2022, Ken Ueberholz , , Telefon, Gästehaus 
My guesthouse phone number: 06159-71-2957
Entry  Sat Apr 2 16:10:22 2022, Markus, Bernd, Accelerator, SIS setting complete, U90+ mit Be target: 2022-04-02_16-04-00_SIS18_FAST_E142_20220325_110213.C1.txt  
# Version: 1.2
# Comment: ParamModi Export at 2022-04-02T16:04:10.778077+02:00[Europe/Berlin]
# Context: SIS18_FAST_E142_20220325_110213.C1
Entry  Sat Apr 2 15:54:32 2022, Carsten, Accelerator, ESR setup with primary beam and 1cm Be plate + Schottky data on NTCAP 
MArkus and Bernd have setup the ESR with the thick stripper foil and put the ion beam (238U92+) on the central orbit.

SIS Energy is 536 MeV/u
Entry  Sat Apr 2 10:22:21 2022, Rui-Jiu Chen, Ragan, General, Beam is in the ESR 
Primary beam is in the ESR now. Markus and the team are tuning the ESR.
Entry  Sat Apr 2 05:08:00 2022, Kristian, General, Morning shift 
I see no updates in the log. Is the morning shift taking place?

For now I will stay at home and be on call. I can be at GSI in 20 min. Please let me know the status.
Entry  Sat Apr 2 01:27:25 2022, Jan Glorius, Runs, test runs 02.04.2022 setting_e142.1648855568
Beam settings:
primary beam 
copper stripper
Entry  Sat Apr 2 01:02:39 2022, Carsten, , Test measurements with two DAQs 
We do two measurements:

One measurement using the 
Entry  Fri Apr 1 23:47:45 2022, Carsten, Detectors, PMT thresholds / PMT north does not allow voltage abow ~ -1kV 
Checked thresholds of PMT with beam and without beam.

The [B]PMT "south"[/B] which is now at the gas-jet target has burst-like pulses with a train of many short pulses of duration of about 1us. The signals
Entry  Fri Apr 1 23:12:37 2022, Patrick, Detectors, Scraper positions "only primary beam" 

Scraper positions where there is only primary beam for detector tests. Use only one outer and one inner scraper at the same time.
[B]Move detectors out before new beam![/B]
Entry  Wed Mar 23 11:20:55 2022, Simon, Detectors, PMT operating voltages 
During the testing of the PMTs the following operating voltages were applied:

PMT Cu: -1300V
    Reply  Fri Apr 1 22:01:14 2022, Konstantin, Detectors, PMT operating voltages 
> During the testing of the PMTs the following operating voltages were applied:

> PMT Cu: -1300V
Entry  Fri Apr 1 18:30:38 2022, Carsten, Detectors, Positions / Voltages threshlds for particle detectors 
[B]DC beam 238U92+ (205kV, e-beam)[/B]
We used the detector NA_SZ to determine the central primary-beam (238U92+) position by observing the Schottky-signal while moving the detector inside.
Entry  Fri Apr 1 18:19:58 2022, Kristian, Calibration, HV divider 
We checked the strange behavior of the HV dividers again. The Ohmlabs and the PTB divider are in good agreement at 120 kV and 150 kV. There, both dividers
deviated by 0.35% from the value on the HKR multimeter. Ohmlabs divider yields higher voltage.
Entry  Fri Apr 1 16:46:33 2022, Carsten, Detectors, All pressuzied air drives are tested now and are working properly 
All pressuzied air drives are tested now and are working properly
Entry  Fri Apr 1 15:52:23 2022, Rodolfo, Detectors, UV PMT South PMT_Sued_Target.jpg
The "Solar Blind PMT" labeled as "PMT South" has been installed by Simon and Max in the gas target chamber on a CaF Viewport. The PMT is pointing directly
to the center chamber.
ELOG V3.1.5-fc6679b