Thu Jul 1 16:47:15 2021, Andrew Nic, Runs, Frequency shift
|
The freqency suddenly shifted at time 16:11:47 and remained shifted until now
The ESR status in the monitor stayed blue. No obvious sign that a magnet was down. The operators are checking
|
Thu Jul 1 21:15:01 2021, Andrew Nic, DAQ, NTCAP Status
|
The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000299
p:\E143\iq\IQ_2021-06-30_23-27-34\0001462
|
Sat May 8 21:42:26 2021, All, Runs, Stop72Ge
|
|
Sat May 8 21:42:51 2021, All, Accelerator, Set up for 52Mn
|
Details will follow
E(Mn) = 368.41 MeV/u |
Sat May 8 07:14:00 2021, Akash, Nic, Jelena, Zsolt, General, Morning shift entry
|
Things look ok. No settings have been changed...
Analysis attempts are going on... |
Sat May 8 07:34:08 2021, Akash, Nic, Jelena, Zsolt, General, Zoom has its own mind
|
Zoom kicked us all out... we managed to get back in...screen sharing is back on. |
Sat May 8 08:12:02 2021, Akash, Nic, Jelena, Zsolt, General, SIS, ESR time structure changes
|
The structure of SIS extraction seems to have changed a little...also for ESR injection.
In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component. |
Sat May 8 08:16:08 2021, Akash, Nic, Jelena, Zsolt, Analysis, Night shift analysis 16x
|
(Jelena has analysed these data files)
E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5) (2021.05.08.09.01.11.png)
|
Sat May 8 08:44:32 2021, Akash, Nic, Jelena, Zsolt, Accelerator, No Beam!
|
08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!
10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went |
Sat May 8 10:51:41 2021, Akash, Nic, Jelena, Zsolt, Calibration, ESR settings seem different
|
Settings don't look the same...so we are not yet writing files unless sure. |
Fri May 7 06:53:56 2021, Akash, Liliana, Analysis, Some plots 6x
|
Some plots of statistics up to now |
|