ID |
Date |
Author |
Category |
Subject |
31
|
Fri May 7 04:26:54 2021 |
Shahab | Runs | 245 MHz resonator extra 20dB gain off |
made sure that the extra 20dB amplifier is off. |
113
|
Sun May 9 20:39:17 2021 |
Shahab | Runs | Subtracting the background |
still in the search of 70-Se |
Attachment 1: spectrum_subtraction.png
|
|
140
|
Tue Jun 29 21:10:30 2021 |
Shahab | Runs | 72-Ge setting |
the new setting is roughly 400 khz lower in frequency.
Previous beam time Ge was on 243.100 now it is on 242.74
we decided to use the higher harmonic:
expecting it on 244.66 MHz |
145
|
Wed Jun 30 01:38:20 2021 |
Shahab | Runs | beam is back from Linac but not in the ESR |
|
146
|
Wed Jun 30 02:12:46 2021 |
Shahab | Runs | still no beam in ESR: quadrupole magnets are down |
still no beam in ESR: quadrupole magnets are down |
151
|
Wed Jun 30 13:04:40 2021 |
Shahab | Runs | 245 Amplifier on |
turned on extra 20dB amplifier for the 245 Resonator around 12:32 |
Attachment 1: amplification_on245.png
|
|
156
|
Wed Jun 30 15:21:44 2021 |
Shahab | Runs | data synch on WWW server |
Data is being shared on the WWW server.
Time difference between the analyzers is in order of seconds:
time stamp of the 245MHz data is leading those of 410MHz by 21.733 [s] |
158
|
Wed Jun 30 19:59:39 2021 |
Shahab | Runs | Scraper positions |
current scraper positions suggested by Sergey:
GEEXDS2HA = -11mm
GE01DS-H (innen) = -58mm |
173
|
Thu Jul 1 18:07:10 2021 |
Shahab | Runs | settings of the analyzers after changing the trigger position |
|
Attachment 1: asd.jpg
|
|
Attachment 2: asd2.jpg
|
|
174
|
Thu Jul 1 18:49:59 2021 |
Shahab | Runs | possible isomer? |
|
Attachment 1: possible_isomer.png
|
|
176
|
Thu Jul 1 18:56:49 2021 |
Shahab | Runs | Short interruption in recording |
DAQs and NTCAP |
178
|
Thu Jul 1 19:34:11 2021 |
Shahab | DAQ | increase factor 4 in power for 410 |
increase factor 4 in power for 410
before:
410MHz-2021.07.01.18.48.07.516.tiq.png
after:
410MHz-2021.07.01.19.23.49.099.tiq.png |
Attachment 1: 410MHz-2021.07.01.19.23.49.099.tiq.png
|
|
Attachment 2: 410MHz-2021.07.01.18.48.07.516.tiq.png
|
|
182
|
Thu Jul 1 21:35:15 2021 |
Shahab | DAQ | increase factor 4 in power for 410 |
increase factor 4 in power for 410
before:
410MHz-2021.07.01.18.48.07.516.tiq.png
after:
410MHz-2021.07.01.19.23.49.099.tiq.png |
183
|
Thu Jul 1 21:35:32 2021 |
Shahab | Runs | some pics after 15dB amplification on 410 |
|
Attachment 1: asd.png
|
|
Attachment 2: 821.png
|
|
211
|
Fri Jul 2 13:44:50 2021 |
Sergey, et al | Accelerator | El cooler |
Up to now, attempts to cool the fat line between Se and Ar were conducted. We give up it now and remove cooling |
49
|
Fri May 7 16:17:21 2021 |
Sergey, Yuri, Wolfram, Shahab | Runs | new sextupole setting |
new sextupole setting, isomer not visible yet. |
137
|
Tue Jun 29 10:32:10 2021 |
Sergey, Helmut | Accelerator | cooler curves for tuning of isochronicity |
Variation of quadrupole E01QS03D to change gamma_t in isoc. mode
measured with 78Kr at 368.5 MeV/u on 28.06.2021 evening.
The shape of the three curves looks very similar they would only require a different beam velocity.
But I suppose we stay with the value close to the old one (gamma_t ~ 1.3956). |
Attachment 1: isoc_curves.JPG
|
|
Attachment 2: iso_curves_june_2021_1.xlsx
|
136
|
Mon Jun 28 18:32:49 2021 |
Ruijiu, Shahab | DAQ | trigger signal connected to NTCAP and analyzers |
|
Attachment 1: tri.jpg
|
|
20
|
Thu May 6 23:06:18 2021 |
Rui-Jiu Chen | DAQ | Change reference level to -50dBm |
Beam is secondary beam now. The intensity is lower. Change reference level to -50dBm.
Carrier frequency:245MHz
IQ rate(S/s): 20M.
Reference Level: -50 dBm.
Start taking data.
SC_2021-05-06_23_02_46
IQ_2021-05-06_23_02_33 |
22
|
Fri May 7 01:44:24 2021 |
Rui-Jiu Chen | DAQ | Change reference level to -40dBm |
Reference Level: -40 dBm.
Start taking data.
SC_2021-05-07_00-06-57
IQ_2021-05-07_00-06-57 |