Entry  Fri May 7 04:26:54 2021, Shahab, Runs, 245 MHz resonator extra 20dB gain off 
made sure that the extra 20dB amplifier is off.
Entry  Sun May 9 20:39:17 2021, Shahab, Runs, Subtracting the background spectrum_subtraction.png
still in the search of 70-Se
Entry  Tue Jun 29 21:10:30 2021, Shahab, Runs, 72-Ge setting 
the new setting is roughly 400 khz lower in frequency.
Previous beam time Ge was on 243.100 now it is on 242.74

we decided to use the higher harmonic:

expecting it on 244.66 MHz
Entry  Wed Jun 30 01:38:20 2021, Shahab, Runs, beam is back from Linac but not in the ESR 
 
Entry  Wed Jun 30 02:12:46 2021, Shahab, Runs, still no beam in ESR: quadrupole magnets are down 
still no beam in ESR: quadrupole magnets are down
Entry  Wed Jun 30 13:04:40 2021, Shahab, Runs, 245 Amplifier on amplification_on245.png
turned on extra 20dB amplifier for the 245 Resonator around 12:32 
Entry  Wed Jun 30 15:21:44 2021, Shahab, Runs, data synch on WWW server 
Data is being shared on the WWW server.
Time difference between the analyzers is in order of seconds:

time stamp of the 245MHz data is leading those of 410MHz by 21.733 [s]
Entry  Wed Jun 30 19:59:39 2021, Shahab, Runs, Scraper positions 
current scraper positions suggested by Sergey:

GEEXDS2HA = -11mm
GE01DS-H (innen) = -58mm
Entry  Thu Jul 1 18:07:10 2021, Shahab, Runs, settings of the analyzers after changing the trigger position asd.jpgasd2.jpg
 
Entry  Thu Jul 1 18:49:59 2021, Shahab, Runs, possible isomer? possible_isomer.png
 
Entry  Thu Jul 1 18:56:49 2021, Shahab, Runs, Short interruption in recording  
DAQs and NTCAP
Entry  Thu Jul 1 19:34:11 2021, Shahab, DAQ, increase factor 4 in power for 410  410MHz-2021.07.01.19.23.49.099.tiq.png410MHz-2021.07.01.18.48.07.516.tiq.png
increase factor 4 in power for 410 



before:

410MHz-2021.07.01.18.48.07.516.tiq.png


after:

410MHz-2021.07.01.19.23.49.099.tiq.png
Entry  Thu Jul 1 21:35:15 2021, Shahab, DAQ, increase factor 4 in power for 410  
increase factor 4 in power for 410 



before:

410MHz-2021.07.01.18.48.07.516.tiq.png


after:

410MHz-2021.07.01.19.23.49.099.tiq.png
Entry  Thu Jul 1 21:35:32 2021, Shahab, Runs, some pics after 15dB amplification on 410 asd.png821.png
 
Entry  Fri Jul 2 13:44:50 2021, Sergey, et al, Accelerator, El cooler 
Up to now, attempts to cool the fat line between Se and Ar were conducted. We give up it now and remove cooling
Entry  Fri May 7 16:17:21 2021, Sergey, Yuri, Wolfram, Shahab, Runs, new sextupole setting 
new sextupole setting, isomer not visible yet.
Entry  Tue Jun 29 10:32:10 2021, Sergey, Helmut, Accelerator, cooler curves for tuning of isochronicity isoc_curves.JPGiso_curves_june_2021_1.xlsx
Variation of quadrupole E01QS03D to change gamma_t in isoc. mode
measured with 78Kr at 368.5 MeV/u on 28.06.2021 evening.
The shape of the three curves looks very similar they would only require a different beam velocity.
But I suppose we stay with the value close to the old one (gamma_t ~ 1.3956).
Entry  Mon Jun 28 18:32:49 2021, Ruijiu, Shahab, DAQ, trigger signal connected to NTCAP and analyzers tri.jpg
 
Entry  Thu May 6 23:06:18 2021, Rui-Jiu Chen, DAQ, Change reference level to -50dBm 
Beam is secondary beam now. The intensity is lower. Change reference level to -50dBm.
Carrier frequency:245MHz
IQ rate(S/s): 20M.
Reference Level: -50 dBm.

Start taking data.
SC_2021-05-06_23_02_46
IQ_2021-05-06_23_02_33
Entry  Fri May 7 01:44:24 2021, Rui-Jiu Chen, DAQ, Change reference level to -40dBm 
Reference Level: -40 dBm.

Start taking data.
SC_2021-05-07_00-06-57
IQ_2021-05-07_00-06-57