  nuclear two-photon decay, Page 3 of 11  Not logged in ELOG logo
Entry  Fri May 7 10:46:40 2021, Yuri, Accelerator, GE02DS3HG 
The scraper is blocked at -10 mm and -unfortunately- blocks the beam in the ESR. Uli Popp is taking care.
Entry  Fri May 7 11:40:20 2021, Ragan, Andrew, Yuri, General, Scraper is fixed - optimisation stage 
Scraper is fixed, we start again. Scraper open to let everything through
Entry  Fri May 7 12:37:35 2021, Ragan, Andrew, Yuri, Alex, General, Back with beam  
We are back with the beam in the ESR since 12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
E02DS3HG = - 35 mm
Entry  Fri May 7 14:06:02 2021, Yuri, Accelerator, SIS kicker failure 
 
Entry  Fri May 7 14:33:23 2021, Andrew Ragan Yuri , General, Beam is back 
 
Entry  Fri May 7 16:09:50 2021, Yuri, Accelerator, Stop, change of sextuple settings 
 
Entry  Fri May 7 16:17:21 2021, Sergey, Yuri, Wolfram, Shahab, Runs, new sextupole setting 
new sextupole setting, isomer not visible yet.
Entry  Fri May 7 17:02:51 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, new sextupole setting 2 
There is new sextupole settings, but the scrapers remain like last night (Helmut setting last night.)
Entry  Fri May 7 17:12:14 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, Energy change -6 MeV/u 
changed the energy down to 435 MeV/u
Entry  Fri May 7 17:12:52 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, trigger time back to 50% 
changed trigger time back to 50%

last file with 1% trigger: 
Entry  Fri May 7 17:35:22 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, Energy change +6 MeV/u 
We will now go up in energy to 447 MeV (+6 MeV) from the original energy

last file name with previous energy:
Entry  Fri May 7 18:08:35 2021, Kanika, Sergey, Yuri, Wolfram, Michael, Shahab, Runs, going back to the original energy 
going back to the original energy 441 MeV/u

last filenames with the previous energy:
Entry  Fri May 7 18:43:13 2021, Kanika, Michael, Shahab, Runs, cave M experiment needs more spills rep.jpg
our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment. They loose every other spill due to high request rate from
ESR.
Entry  Fri May 7 19:56:10 2021, Kanika, Michael, Shahab, Runs, ZOOM session restart 
restart zoom session
Entry  Fri May 7 20:28:32 2021, Kanika, Michael, Shahab, Analysis, Some pictures from the 410 detector 9x
some pics.
Entry  Fri May 7 20:34:27 2021, Kanika, Michael, Shahab, Runs, back to 15 sec recording 
now we are going back to 15 sec operation. Cave M (bio) operation is over
Entry  Fri May 7 22:00:36 2021, Chris, Accelerator, brief beam loss 
Brief interruption in beam, ~21:42-21:51.
Entry  Fri May 7 22:48:33 2021, Chris, General, still running... E143-245MHz-2021.05.07.21.46.10.889.tiq.pngZoom_screenshot.PNG
In anticipation of the imminent shift change, a snapshot of how things look.
Entry  Fri May 7 23:08:44 2021, Michael, Kanika, Accelerator, Beam issues for short duration 
The beam was lost for a few minutes from 23:01 to 23:06. It is back now.
Entry  Sat May 8 00:38:55 2021, Philipp, Marta, General, Screenshot Screenshot_2021-05-08_at_00.32.16.png
 