HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 5 of 12  Not logged in ELOG logo
ID Date Authordown Category Subject Text Attachments
  12   Thu May 6 16:45:42 2021 Ragan, Rui-JiuDAQData taking with NTCAPNTCAP is on and data taking has started.
On time: 16:39
 1.jpg2.jpg 
  13   Thu May 6 17:02:49 2021 Ragan, Rui-JiuDAQScaler signals and parameters of NTCAPAt the moment, we record 7 signals in scaler
channels and one Schottky signal (245 MHz
resonance cavity) in the NTCAP with the attached
 p1.JPGp2.JPGp4.png 
  15   Thu May 6 18:21:42 2021 Ragan, Rui-JiuDAQNTCAP started againNTCAP was stopped at 17:34 for the optimisation
purpose.
NTCAP started again at 18:20 with the change
 IMG_20210506_182118.jpgIMG_20210506_182017.jpg 
  23   Fri May 7 01:47:36 2021 Ragan, Rui-JiuDAQChange reference level to -30dBm Reference Level: -30 dBm.

Start taking data.
  
  79   Sat May 8 19:51:46 2021 Ragan, Rui-JiuDAQChange reference level to -50dBmStart a new run. The data of new run is in
:
SC_2021-05-08_19-51-35
  
  120   Mon May 10 00:00:49 2021 Ragan, Rui-JiuDAQChange reference level to -70dBmStart a new run. The data of new run is in
:
SC_2021-05-09_23-56-42
  
  159   Wed Jun 30 20:14:44 2021 Ragan, HelenaGeneralDrop in SIS intensityThere is a drop in SIS intensity and the operators
are informed.
  
  160   Wed Jun 30 20:21:47 2021 Ragan, HelenaGeneralSIS intensity is backSIS intensity is back   
  161   Wed Jun 30 20:58:06 2021 Ragan, HelenaGeneralFew minutes of disruptionThere was a disruption from the SIS side for
a few minutes.
  
  45   Fri May 7 12:37:35 2021 Ragan, Andrew, Yuri, AlexGeneralBack with beam We are back with the beam in the ESR since
12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
  
  37   Fri May 7 08:55:33 2021 Ragan, Andrew, YuriGeneralTrigger changedTrigger for both the spectrum analyzers is
changed from 50% to 1% by Yuri.
For this, the ESR pattern was stopped at
 photo_2021-05-07_08-58-58.jpg 
  38   Fri May 7 09:36:32 2021 Ragan, Andrew, YuriGeneralBeam stop at 0928, adjust scopeIt was requested from the SIS to stop the
beam at 09:28 
Yuri is adjusting the scope in order to avoid
  
  44   Fri May 7 11:40:20 2021 Ragan, Andrew, YuriGeneralScraper is fixed - optimisation stageScraper is fixed, we start again. Scraper
open to let everything through
  
  35   Fri May 7 07:52:12 2021 Ragan, AndrewGeneralTo change trigger positionXiangcheng suggested to change the trigger
position in order to start the file with
the injection. Nothing is changed at the
  
  95   Sun May 9 05:54:11 2021 RaganAnalysisoffset btw png and tiq files from server?This is due to the 50% trigger setting in
the spectrum analyzers ))
  
  62   Sat May 8 00:38:55 2021 Philipp, MartaGeneralScreenshot   Screenshot_2021-05-08_at_00.32.16.png 
  63   Sat May 8 01:06:19 2021 Philipp, MartaGeneralScreenshotThe signal of the transformer on the lower
right panel is not really beam related. It
is mostly noise. Changes are not so expected
 Screenshot_2021-05-08_at_00.58.16.png 
  200   Fri Jul 2 06:51:45 2021 Pavlos, KanikaDAQNTCAP statusThe latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000431
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002106
  
  203   Fri Jul 2 08:54:12 2021 Pavlos, AlexandreDAQNTCAP statusThe latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000459
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002242
  
  204   Fri Jul 2 10:47:56 2021 Pavlos, AlexandreDAQNTCAP statusThe latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000485
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002370
  
ELOG V3.1.5-fc6679b