Thu May 6 21:45:30 2021, Helmut, Detectors, beam position on TE5 grids
|
The two grids do not work very well, one x position is opposite to the other.
But at least a guidance for the future, this was good injection of 78Kr with a thick Be target. |
Thu May 6 16:45:42 2021, Ragan, Rui-Jiu, DAQ, Data taking with NTCAP
|
NTCAP is on and data taking has started.
On time: 16:39
|
Thu May 6 17:02:49 2021, Ragan, Rui-Jiu, DAQ, Scaler signals and parameters of NTCAP
|
At the moment, we record 7 signals in scaler channels and one Schottky signal (245 MHz resonance cavity) in the NTCAP with the attached information. |
Thu May 6 18:21:42 2021, Ragan, Rui-Jiu, DAQ, NTCAP started again
|
NTCAP was stopped at 17:34 for the optimisation purpose.
NTCAP started again at 18:20 with the change in Reference Level (dBm): 0
|
Thu May 6 23:06:18 2021, Rui-Jiu Chen, DAQ, Change reference level to -50dBm
|
Beam is secondary beam now. The intensity is lower. Change reference level to -50dBm.
Carrier frequency:245MHz
IQ rate(S/s): 20M.
|
Fri May 7 01:44:24 2021, Rui-Jiu Chen, DAQ, Change reference level to -40dBm
|
Reference Level: -40 dBm.
Start taking data.
|
Fri May 7 01:47:36 2021, Ragan, Rui-Jiu, DAQ, Change reference level to -30dBm
|
Reference Level: -30 dBm.
Start taking data.
|
Fri May 7 01:49:03 2021, Rui-Jiu Chen, DAQ, Comparison of I_Raw/Q_Raw between different reference level
|
This is a comparison of I_Raw/Q_Raw between different reference level. The range of NTCAP ADC is only 2^15 bit. So signals (I_Raw and Q_Raw) should
not be outside ADC range. It is clear that there is not point outside the ADC range when using reference level -30dBm. |
Sat May 8 03:05:42 2021, Rui-Jiu Chen, DAQ, Change reference level to -60dBm
|
Start a new run. The data of new run is in :
SC_2021-05-07_17-33-29
IQ_2021-05-07_17-33-29 |
Sat May 8 03:08:57 2021, Rui-Jiu Chen, DAQ, Change reference level to -50dBm
|
Start a new run. The data of new run is in :
SC_2021-05-07_17-39-16
IQ_2021-05-07_17-39-16 |
Sat May 8 18:35:25 2021, Rui-Jiu Chen, DAQ, Change reference level to -10dBm
|
The beam in ESR is 78Kr36+@476 MeV/u.
Start a new run:
SC_2021-05-08_18-25-52
|
Sat May 8 19:51:46 2021, Ragan, Rui-Jiu, DAQ, Change reference level to -50dBm
|
Start a new run. The data of new run is in :
SC_2021-05-08_19-51-35
IQ_2021-05-08_19-51-35 |
Sun May 9 23:59:26 2021, Rui-Jiu Chen, DAQ, Start a new run.
|
Start a new run. The data of new run is in :
reference level = -50dBm.
SC_2021-05-09_23-43-37
|
Mon May 10 00:00:49 2021, Ragan, Rui-Jiu, DAQ, Change reference level to -70dBm
|
Start a new run. The data of new run is in :
SC_2021-05-09_23-56-42
IQ_2021-05-09_23-56-42 |
Mon May 10 00:08:26 2021, Rui-Jiu Chen, DAQ, Change reference level to -60dBm
|
Start a new run. The data of new run is in :
SC_2021-05-10_00-08-08
IQ_2021-05-10_00-08-08 |
Mon Jun 28 18:32:49 2021, Ruijiu, Shahab, DAQ, trigger signal connected to NTCAP and analyzers
|
|
Tue Jun 29 20:40:55 2021, Rui-Jiu Chen, DAQ, start NTCAP
|
Carrier Frequency:245MHz.
IQ rate 20MSamples/s
Reference level:-90 dBm
|
Thu Jul 1 15:25:42 2021, Rui-Jiu Chen, DAQ, template of NTCAP shift
|
Please check following two parameters every two hours into make sure the NTCAP is running well:
1. The latest recorded tdms files:
p:\E143\sc\**\**
|
Thu Jul 1 18:01:52 2021, Andrew Nic Shahab, DAQ, Change triggers to 10%
|
Change the triggers to 10%. Last files with 50/50:
410MhZ 2021-.07.01.17.56.12.936
245MhZ 2021.07.01.18.02.16.938 |
Thu Jul 1 19:34:11 2021, Shahab, DAQ, increase factor 4 in power for 410
|
increase factor 4 in power for 410
|