ID |
Date |
Author |
Category |
Subject |
206
|
Fri Jul 2 12:18:35 2021 |
Pavlos, Alexandre | Accelerator | e-cooling |
Sergey Litvinov will now try to setup the e-cooler to cool the beam in the ESR.
The data taking has been stopped (except the NTCAP). |
208
|
Fri Jul 2 12:59:21 2021 |
Pavlos, Alexandre | DAQ | NTCAP status |
The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000515
p:\E143\iq\IQ_2021-06-30_23-27-34\0002516
2. The rest space on the drive "p:\" : 25,0TByte |
210
|
Fri Jul 2 13:37:00 2021 |
Pavlos, Alexandre | DAQ | Change of the measurement time from 10s to 20s |
Last files with the measurement time of 10s for the two resonators are:
245MHz-2021.07.02.13.36.00.674.tiq
410MHz-2021.07.02.13.35.34.758.tiq |
212
|
Fri Jul 2 14:18:04 2021 |
Pavlos, Alexandre | Runs | Change of the measurment to 72Br |
Both resonators will now be retuned to look for the isomeric state in 72Br.
Last files for 70Se are:
245MHz-2021.07.02.14.17.14.507.tiq
410MHz-2021.07.02.14.16.48.528.tiq |
213
|
Fri Jul 2 15:03:37 2021 |
Pavlos, Alexandre | DAQ | NTCAP status |
The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000543
p:\E143\iq\IQ_2021-06-30_23-27-34\0002655
2. The rest space on the drive "p:\" : 24,5TByte |
154
|
Wed Jun 30 14:48:54 2021 |
Oliver | General | Data taking - and not... |
We just started data taking. But a few minutes later the main experiment needed to do some adjustements to the beam. This interrupts us for a couple of minutes... |
155
|
Wed Jun 30 14:52:28 2021 |
Oliver | General | Re-Started data taking... |
Main user is finished. We started data taking again... |
177
|
Thu Jul 1 19:24:59 2021 |
Nic Andrew Shahab | Runs | Start of data taking again |
410 MHz resolution and power optimised
Last files before the restart were
245Mhz-2021.07.01.18.48.31.725.tiq
410MHz-2021.07.01.18.48.07.516.tiq |
92
|
Sun May 9 04:15:50 2021 |
Michele, Jacobus, Shahab | Runs | Beam issues for short duration |
ESR warning (colour red in the panel)
Operator intervention required.
Runs affected by this issue:
-from E143-245MHz-2021.05.09.02.49.48.521 (03:50)
-to E143-245MHz-2021.05.09.02.54.54.239 (03:54) .
|
75
|
Sat May 8 15:18:23 2021 |
Michael, Wolfram, Yuri | General | Beam Settings changing |
Beam settings are being changed back to 78Kr beam at 467 Mev/u. |
81
|
Sat May 8 21:10:24 2021 |
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | started data taking with high resolution |
after optimizing the scrapers we have reached the highest possible resolution in the isochronous mode.
starting data taking with this new settings.
last files before this settings were:
245: 2021.05.08.14.14.55.114.tiq
410: 2021.05.08.15.15.10.101.tiq |
Attachment 1: E143-245MHz-2021.05.08.20.17.39.000.tiq.png
|
|
Attachment 2: E143-410MHz-2021.05.08.21.18.51.447.tiq.png
|
|
84
|
Sat May 8 22:06:36 2021 |
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | stopped data taking with the high resolution |
last file names with this setting:
245: 2021.05.08.20.42.03.743.tiq
410: 2021.05.08.21.42.17.969.tiq |
61
|
Fri May 7 23:08:44 2021 |
Michael, Kanika | Accelerator | Beam issues for short duration |
The beam was lost for a few minutes from 23:01 to 23:06. It is back now. |
102
|
Sun May 9 08:00:03 2021 |
Liliana, Andrew | General | Status |
So far, we keep the setting as it is and wait for experts to come in.
Few spills are missing from time to time. One of the peaks stays usually in the spectrum when this happens.
Analysis of the last hours is being performed by the remote shift, in case it is useful. Some plots in telegram. |
Attachment 1: Screenshot_2021-05-09_08-01-17.png
|
|
25
|
Fri May 7 02:01:08 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | Accelerator | Beam issues for short duration |
RFQ fall-out (HKR working on it...)
Beam stop time: 01.58am
Beam resumption: 02.02am |
26
|
Fri May 7 03:33:11 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | General | status |
At the moment we see a second peak to the left of each intense line.
The distance between the main peak and the shadow is roughly the same for each peak.
This hints to a sharp fall in the isochronicity curve.
Helmut now tries to remove these shadows by using different scrappers. |
28
|
Fri May 7 03:46:58 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | General | Scraper settings |
Scraper settings have been played around with to try and remove satellite lines...
Helmut has now set scraper id GE01DS_H at -45mm (in position)
Image of injection structure attached... 72Ge is the isotope in focus on the RSA |
Attachment 1: IMG_20210507_034213_resized_20210507_034848181.jpg
|
|
32
|
Fri May 7 04:39:00 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | Runs | Data taking starts |
File start being recorded at 4:38 am
Sync with the server is working.
Be aware that the timestamp of the files is 1h behind with respect to real time |
104
|
Sun May 9 13:15:38 2021 |
Liliana Andrew | Runs | Stopped data taking during modifications for the beam energy |
Beam energy to be increase to move Mn into the ring.
First step we set the energy to 445 MeV.
The effect of the change can be seen on the plot: Right is how it was before and left after the change. |
Attachment 1: Screenshot_2021-05-09_13-25-26.png
|
|
215
|
Fri Jul 2 17:27:56 2021 |
Liliana | DAQ | NTCAP status |
The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000577
p:\E143\iq\IQ_2021-06-30_23-27-34\0002818
2. The rest space on the drive "p:\" : 23,8TByte |