  206   Fri Jul 2 12:18:35 2021 Pavlos, AlexandreAcceleratore-coolingSergey Litvinov will now try to setup the
e-cooler to cool the beam in the ESR. 
The data taking has been stopped (except
  
  208   Fri Jul 2 12:59:21 2021 Pavlos, AlexandreDAQNTCAP statusThe latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000515
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002516
  
  210   Fri Jul 2 13:37:00 2021 Pavlos, AlexandreDAQChange of the measurement time from 10s to 20sLast files with the measurement time of 10s
for the two resonators are:
  
  212   Fri Jul 2 14:18:04 2021 Pavlos, AlexandreRunsChange of the measurment to 72BrBoth resonators will now be retuned to look
for the isomeric state in 72Br.
  
  213   Fri Jul 2 15:03:37 2021 Pavlos, AlexandreDAQNTCAP statusThe latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000543
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002655
  
  154   Wed Jun 30 14:48:54 2021 OliverGeneralData taking - and not...We just started data taking. But a few minutes
later the main experiment needed to do some
adjustements to the beam. This interrupts
  
  155   Wed Jun 30 14:52:28 2021 OliverGeneralRe-Started data taking...Main user is finished. We started data taking
again...
  
  177   Thu Jul 1 19:24:59 2021 Nic Andrew ShahabRunsStart of data taking again410 MHz resolution and power optimised

  
  92   Sun May 9 04:15:50 2021 Michele, Jacobus, ShahabRunsBeam issues for short duration
ESR warning (colour red in the panel)
  
  75   Sat May 8 15:18:23 2021 Michael, Wolfram, YuriGeneralBeam Settings changingBeam settings are being changed back to 78Kr
beam at 467 Mev/u. 
  
  81   Sat May 8 21:10:24 2021 Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, ShahabRunsstarted data taking with high resolutionafter optimizing the scrapers we have reached
the highest possible resolution in the isochronous
mode.
 E143-245MHz-2021.05.08.20.17.39.000.tiq.pngE143-410MHz-2021.05.08.21.18.51.447.tiq.png 
  84   Sat May 8 22:06:36 2021 Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, ShahabRunsstopped data taking with the high resolutionlast file names with this setting:

245: 2021.05.08.20.42.03.743.tiq
  
  61   Fri May 7 23:08:44 2021 Michael, KanikaAcceleratorBeam issues for short durationThe beam was lost for a few minutes from 23:01
to 23:06. It is back now.
  
  102   Sun May 9 08:00:03 2021 Liliana, AndrewGeneralStatus So far, we keep the setting as it is and wait
for experts to come in. 
Few spills are missing from time to time.
 Screenshot_2021-05-09_08-01-17.png 
  25   Fri May 7 02:01:08 2021 Liliana, Akash, Wolfram, Helmut, ShahabAcceleratorBeam issues for short durationRFQ fall-out (HKR working on it...)

Beam stop time: 01.58am
  
  26   Fri May 7 03:33:11 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralstatusAt the moment we see a second peak to the
left of each intense line. 
The distance between the main peak and the
  
  28   Fri May 7 03:46:58 2021 Liliana, Akash, Wolfram, Helmut, ShahabGeneralScraper settingsScraper settings have been played around with
to try and remove satellite lines...
 IMG_20210507_034213_resized_20210507_034848181.jpg 
  32   Fri May 7 04:39:00 2021 Liliana, Akash, Wolfram, Helmut, ShahabRunsData taking startsFile start being recorded at 4:38 am 
Sync with the server is working. 
  
  104   Sun May 9 13:15:38 2021 Liliana AndrewRunsStopped data taking during modifications for the beam energyBeam energy to be increase to move Mn into
the ring. 
First step we set the energy to 445 MeV.
 Screenshot_2021-05-09_13-25-26.png 
  215   Fri Jul 2 17:27:56 2021 LilianaDAQNTCAP statusThe latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000577
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002818
  