206
|
Fri Jul 2 12:18:35 2021 |
Pavlos, Alexandre | Accelerator | e-cooling | Sergey Litvinov will now try to setup the
e-cooler to cool the beam in the ESR.
The data taking has been stopped (except |
|
208
|
Fri Jul 2 12:59:21 2021 |
Pavlos, Alexandre | DAQ | NTCAP status | The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000515
p:\E143\iq\IQ_2021-06-30_23-27-34\0002516
|
|
210
|
Fri Jul 2 13:37:00 2021 |
Pavlos, Alexandre | DAQ | Change of the measurement time from 10s to 20s | Last files with the measurement time of 10s
for the two resonators are:
|
|
212
|
Fri Jul 2 14:18:04 2021 |
Pavlos, Alexandre | Runs | Change of the measurment to 72Br | Both resonators will now be retuned to look
for the isomeric state in 72Br.
|
|
213
|
Fri Jul 2 15:03:37 2021 |
Pavlos, Alexandre | DAQ | NTCAP status | The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000543
p:\E143\iq\IQ_2021-06-30_23-27-34\0002655
|
|
154
|
Wed Jun 30 14:48:54 2021 |
Oliver | General | Data taking - and not... | We just started data taking. But a few minutes
later the main experiment needed to do some
adjustements to the beam. This interrupts |
|
155
|
Wed Jun 30 14:52:28 2021 |
Oliver | General | Re-Started data taking... | Main user is finished. We started data taking
again... |
|
177
|
Thu Jul 1 19:24:59 2021 |
Nic Andrew Shahab | Runs | Start of data taking again | 410 MHz resolution and power optimised
|
|
92
|
Sun May 9 04:15:50 2021 |
Michele, Jacobus, Shahab | Runs | Beam issues for short duration |
ESR warning (colour red in the panel)
|
|
75
|
Sat May 8 15:18:23 2021 |
Michael, Wolfram, Yuri | General | Beam Settings changing | Beam settings are being changed back to 78Kr
beam at 467 Mev/u. |
|
81
|
Sat May 8 21:10:24 2021 |
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | started data taking with high resolution | after optimizing the scrapers we have reached
the highest possible resolution in the isochronous
mode.
|
|
84
|
Sat May 8 22:06:36 2021 |
Michael, Ruijiu, Helmut, Yuri, Wolfram, Sergey, Shahab | Runs | stopped data taking with the high resolution | last file names with this setting:
245: 2021.05.08.20.42.03.743.tiq
|
|
61
|
Fri May 7 23:08:44 2021 |
Michael, Kanika | Accelerator | Beam issues for short duration | The beam was lost for a few minutes from 23:01
to 23:06. It is back now. |
|
102
|
Sun May 9 08:00:03 2021 |
Liliana, Andrew | General | Status | So far, we keep the setting as it is and wait
for experts to come in.
Few spills are missing from time to time. |
|
25
|
Fri May 7 02:01:08 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | Accelerator | Beam issues for short duration | RFQ fall-out (HKR working on it...)
Beam stop time: 01.58am
|
|
26
|
Fri May 7 03:33:11 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | General | status | At the moment we see a second peak to the
left of each intense line.
The distance between the main peak and the |
|
28
|
Fri May 7 03:46:58 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | General | Scraper settings | Scraper settings have been played around with
to try and remove satellite lines...
|
|
32
|
Fri May 7 04:39:00 2021 |
Liliana, Akash, Wolfram, Helmut, Shahab | Runs | Data taking starts | File start being recorded at 4:38 am
Sync with the server is working.
|
|
104
|
Sun May 9 13:15:38 2021 |
Liliana Andrew | Runs | Stopped data taking during modifications for the beam energy | Beam energy to be increase to move Mn into
the ring.
First step we set the energy to 445 MeV. |
|
215
|
Fri Jul 2 17:27:56 2021 |
Liliana | DAQ | NTCAP status | The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000577