  18   Thu May 6 21:45:30 2021 HelmutDetectorsbeam position on TE5 gridsThe two grids do not work very well, one x
position is opposite to the other.
But at least a guidance for the future, this
 2021-05-06_21-32-36-171.png 
  12   Thu May 6 16:45:42 2021 Ragan, Rui-JiuDAQData taking with NTCAPNTCAP is on and data taking has started.
On time: 16:39
 1.jpg2.jpg 
  13   Thu May 6 17:02:49 2021 Ragan, Rui-JiuDAQScaler signals and parameters of NTCAPAt the moment, we record 7 signals in scaler
channels and one Schottky signal (245 MHz
resonance cavity) in the NTCAP with the attached
 p1.JPGp2.JPGp4.png 
  15   Thu May 6 18:21:42 2021 Ragan, Rui-JiuDAQNTCAP started againNTCAP was stopped at 17:34 for the optimisation
purpose.
NTCAP started again at 18:20 with the change
 IMG_20210506_182118.jpgIMG_20210506_182017.jpg 
  20   Thu May 6 23:06:18 2021 Rui-Jiu ChenDAQChange reference level to -50dBmBeam is secondary beam now. The intensity
is lower. Change reference level to -50dBm.
Carrier frequency:245MHz
  
  22   Fri May 7 01:44:24 2021 Rui-Jiu ChenDAQChange reference level to -40dBmReference Level: -40 dBm.

Start taking data.
  
  23   Fri May 7 01:47:36 2021 Ragan, Rui-JiuDAQChange reference level to -30dBm Reference Level: -30 dBm.

Start taking data.
  
  24   Fri May 7 01:49:03 2021 Rui-Jiu ChenDAQComparison of I_Raw/Q_Raw between different reference level This is a comparison of I_Raw/Q_Raw between
different reference level. The range of NTCAP
ADC is only 2^15 bit. So signals (I_Raw and
 20210501_NTCAPPreparation.png 
  66   Sat May 8 03:05:42 2021 Rui-Jiu ChenDAQChange reference level to -60dBmStart a new run. The data of new run is in
:
SC_2021-05-07_17-33-29
  
  67   Sat May 8 03:08:57 2021 Rui-Jiu ChenDAQChange reference level to -50dBmStart a new run. The data of new run is in
:
SC_2021-05-07_17-39-16
  
  78   Sat May 8 18:35:25 2021 Rui-Jiu ChenDAQChange reference level to -10dBmThe beam in ESR is 78Kr36+@476 MeV/u.
Start a new run:
SC_2021-05-08_18-25-52
  
  79   Sat May 8 19:51:46 2021 Ragan, Rui-JiuDAQChange reference level to -50dBmStart a new run. The data of new run is in
:
SC_2021-05-08_19-51-35
  
  119   Sun May 9 23:59:26 2021 Rui-Jiu ChenDAQStart a new run.Start a new run. The data of new run is in
:
reference level = -50dBm.
  
  120   Mon May 10 00:00:49 2021 Ragan, Rui-JiuDAQChange reference level to -70dBmStart a new run. The data of new run is in
:
SC_2021-05-09_23-56-42
  
  121   Mon May 10 00:08:26 2021 Rui-Jiu ChenDAQChange reference level to -60dBm Start a new run. The data of new run is in
:
SC_2021-05-10_00-08-08
  
  136   Mon Jun 28 18:32:49 2021 Ruijiu, ShahabDAQtrigger signal connected to NTCAP and analyzers   tri.jpg 
  139   Tue Jun 29 20:40:55 2021 Rui-Jiu ChenDAQstart NTCAPCarrier Frequency:245MHz.
IQ rate 20MSamples/s
Reference level:-90 dBm
  
  168   Thu Jul 1 15:25:42 2021 Rui-Jiu ChenDAQtemplate of NTCAP shiftPlease check following two parameters every
two hours into make sure the NTCAP is running
well: 
  
  172   Thu Jul 1 18:01:52 2021 Andrew Nic ShahabDAQChange triggers to 10%Change the triggers to 10%. Last files with
50/50:
410MhZ 2021-.07.01.17.56.12.936
  
  178   Thu Jul 1 19:34:11 2021 ShahabDAQincrease factor 4 in power for 410 increase factor 4 in power for 410 

 410MHz-2021.07.01.19.23.49.099.tiq.png410MHz-2021.07.01.18.48.07.516.tiq.png 