ID |
Date |
Author |
Category |
Subject |
216
|
Fri Jul 2 17:31:04 2021 |
Liliana | General | status |
at 17:20 intensity was suddenly reduced.
Operators checked. Intensity was a bit low and fluctuating for a while (8e8 to 1e9)
Intensity (1.5e9) was recovered at 18:16 |
217
|
Fri Jul 2 19:06:18 2021 |
Liliana | DAQ | NTCAP status |
The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000600
p:\E143\iq\IQ_2021-06-30_23-27-34\0002931
2. The rest space on the drive "p:\" : 23,4 TByte |
219
|
Fri Jul 2 20:01:16 2021 |
Liliana | Runs | Some plots from the Br setting |
|
Attachment 1: 410MHz-2021.07.02.17.58.30.204.tiq.png
|
|
Attachment 2: 410MHz-2021.07.02.19.34.51.034.tiq.png
|
|
Attachment 3: 410MHz-2021.07.02.19.17.29.696.tiq.png
|
|
Attachment 4: 410MHz-2021.07.02.19.12.36.926.tiq.png
|
|
Attachment 5: 410MHz-2021.07.02.19.06.21.919.tiq.png
|
|
Attachment 6: 410MHz-2021.07.02.18.20.30.054.tiq.png
|
|
221
|
Fri Jul 2 21:07:31 2021 |
Liliana | DAQ | NTCAP status |
The latest recorded tdms files:
p:\E143\sc\SC_2021-06-30_23-27-45\0000627
p:\E143\iq\IQ_2021-06-30_23-27-34\0003062
2. The rest space on the drive "p:\" : 22,9 TByte |
141
|
Tue Jun 29 21:12:15 2021 |
Kanika, Shahab | Runs | Moving the resonance frequency of the 245 MHz resonator |
moving in the plungers:
before: 400
after: 200 |
Attachment 1: e143_resonance_change_2.PNG
|
|
142
|
Tue Jun 29 21:15:01 2021 |
Kanika, Shahab | Runs | lost beam problem Unilac |
cooling water in UNILAC is out |
50
|
Fri May 7 17:02:51 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | new sextupole setting 2 |
There is new sextupole settings, but the scrapers remain like last night (Helmut setting last night.) |
51
|
Fri May 7 17:12:14 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | Energy change -6 MeV/u |
changed the energy down to 435 MeV/u |
52
|
Fri May 7 17:12:52 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | trigger time back to 50% |
changed trigger time back to 50%
last file with 1% trigger:
245 MHZ 2021.05.07.16.07.03.493
410 MHz 2021.05.07.17.07.21.104
p.s. remember the 245 Analyzer has a 1 hour offset in time stamp because of daylight saving time in win10 setting |
53
|
Fri May 7 17:35:22 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | Energy change +6 MeV/u |
We will now go up in energy to 447 MeV (+6 MeV) from the original energy
last file name with previous energy:
245: 2021.05.07.16.33.47.178
410: 2021.07.05.17.34.04.780 |
54
|
Fri May 7 18:08:35 2021 |
Kanika, Sergey, Yuri, Wolfram, Michael, Shahab | Runs | going back to the original energy |
going back to the original energy 441 MeV/u
last filenames with the previous energy:
245: 2021.05.07.17.07.00.543
410: 2021.05.07.18.07.18.037 |
55
|
Fri May 7 18:43:13 2021 |
Kanika, Michael, Shahab | Runs | cave M experiment needs more spills |
our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment. They loose every other spill due to high request rate from ESR.
For the next 2 hours, the operators have changed the spill pattern that as long as they are scanning , we get only every 1 minute, otherwise we get our 15 seconds as usual.
after two hours this situation should be tuned back to the original spill pattern. |
Attachment 1: rep.jpg
|
|
56
|
Fri May 7 19:56:10 2021 |
Kanika, Michael, Shahab | Runs | ZOOM session restart |
restart zoom session |
57
|
Fri May 7 20:28:32 2021 |
Kanika, Michael, Shahab | Analysis | Some pictures from the 410 detector |
some pics. |
Attachment 1: E143-410MHz-2021.05.07.20.21.32.783.tiq.png
|
|
Attachment 2: E143-410MHz-2021.05.07.20.21.44.827.tiq.png
|
|
Attachment 3: E143-410MHz-2021.05.07.20.21.56.869.tiq.png
|
|
Attachment 4: E143-410MHz-2021.05.07.20.22.08.911.tiq.png
|
|
Attachment 5: E143-410MHz-2021.05.07.20.22.20.952.tiq.png
|
|
Attachment 6: E143-410MHz-2021.05.07.20.22.32.993.tiq.png
|
|
Attachment 7: E143-410MHz-2021.05.07.20.22.45.037.tiq.png
|
|
Attachment 8: E143-410MHz-2021.05.07.20.22.59.920.tiq.png
|
|
Attachment 9: E143-410MHz-2021.05.07.20.23.17.103.tiq.png
|
|
58
|
Fri May 7 20:34:27 2021 |
Kanika, Michael, Shahab | Runs | back to 15 sec recording |
now we are going back to 15 sec operation. Cave M (bio) operation is over |
117
|
Sun May 9 23:28:25 2021 |
Kanika, Alex, Wolfram, Helmut, Shahab | Runs | return with the Ge setting of the last night |
starting filenames:
E143-410MHz-2021.05.09.23.28.24.018.tiq
E143-245MHz-2021.05.09.22.28.12.904.tiq |
129
|
Mon May 10 06:16:31 2021 |
Kanika, Alex, Shahab | Runs | Recording broad band spectra with 410 |
doing some broadband spectra recording with the 410 MHz detector, for the purpose of future confirmation of identification lines. |
131
|
Mon May 10 06:35:58 2021 |
Kanika, Alex, Shahab | Runs | going back to shot by shot recording with 410 detector |
going back to shot by shot recording with 410 detector |
123
|
Mon May 10 00:51:38 2021 |
Kanika, Alex, RuiJiu | General | No beam in SIS |
The beam was lost in SIS about 5 mins ago due to the failure of HF cavities. Operators are trying to solve the problem. |
124
|
Mon May 10 01:01:59 2021 |
Kanika, Alex, RuiJiu | General | Beam is back |
The issue has been resolved and the beam is back since 00:56. |