HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  208Pb surrogate, Page 1 of 1  Not logged in ELOG logo
Entry  Fri Jun 17 11:50:06 2022, Jan, Calibration, Xray Calib sources 
We use the following list of sources for calibration of the Xray detectors:

- 241Am_low [40.5 kBq (3%), 01.10.2020 12:00 UTC] [URL=https://elog.gsi.de/esr/X-Ray+Lab/201006_131944/20-007_241AM_40kBq.pdf]SpecSheet[/URL]
Entry  Wed Feb 9 21:34:58 2022, Jan et al., General, ToDo @ GSI 
in the LAB:
- setup of DAQ in GSI network
- presetup of remote control (HV, DAQ, LN2, etc)
Entry  Wed Feb 9 21:23:23 2022, Jan, Collaboration, Proposal E146_proposal.pdfE146_Recomm_Let_Jurado.pdf
The proposal as submitted to G-PAC in 2020 as well as the Letter of Recommendation from G-PAC.
Entry  Wed May 4 11:02:53 2022, Jan Glorius, General, IP list in ESR network 
192.168.0.1 ESR Gateway (atpnuc004)

Entry  Mon May 13 14:48:30 2024, Jan, General, Backup of entry to www.lp2ib.in2p3.fr/elog/ 
The remote control of several devices is done via the private ESR network. The following list of devices is currently in use:

device interface comment
ELOG V3.1.5-fc6679b