Wed Aug 21 15:53:36 2019, Shahab, Status Update, Blade installed
|
[B]Installation of the blades[/B]
The ferritic blade was installed successfully. VNA Tests were successful afterwards. Data was taken for offline assessment. |
Tue Nov 5 16:40:12 2019, Shahab, Status Update, Partly torn drive belt on resonator Motor
|
After an inspection, the drive belt of the 3rd motor of the 410MHz Schottky resonator was found to be partly torn. A new belt will be ordered and inserted
into the cavity asap. |
Mon Nov 11 13:51:19 2019, Shahab, General, Fuse inside ESR
|
A fuse has been apparently blown last week inside ESR due to a clean power supply device. This fuse was unfortunately responsible for the Schottky Rack
inside ESR as well. GSI colleagues from electricity workshop fixed the fuse which was inside the ESR, on the right side of the high voltage cave. For information
the picture of the socket is attached. |
Mon Nov 11 14:14:37 2019, Shahab, General, Resonator drive belt exchanged
|
The drive belt for the 400 MHz Schottky resonator has been replaced by a new one. Tests have been performed, all works fine now. Fine electronics (LNA)
also turned on ready for beam time. |
Mon Nov 11 14:41:30 2019, Shahab, General, Documentation of the problems found in Schototky 410 MHz Motor
|
Hallo Herr Weber,
ich habe jetzt den Antrieb erfolgreich repariert. Nach weitere Untersuchung haben wir festgestellt was das Problem war, was die problematische Funktion |