Entry  Fri Jun 28 10:08:25 2019, Jan, General, Drawing and 3D-models of the x-ray chamber Photonen_Kammer.pngESR_Targetkammer_ESR-QV060.010.000_C5P_000_-.stpESR_target_chamber_top_view.pngx-ray_extension.pdf
Attached is the 2d-drawing and a 3d-model of the current ESR interaction chamber.
Additonally, the drawing of the extension installed at several ports is attached.

Here is a quick overview:

Beam crosses from right to left here. Top is inside the ring, bottom is outside.
Entry  Mon Feb 24 09:30:48 2020, Jan, Status Update, Installed window ports 
Updated list of as of Oct 2023 before the beam time in 2024.

angle/pos.
port
current intallation
inside
35° CF100 + extension Be-window, 100 micrometer, dia=+35mm
60° CF63 detector pocket, 25 micrometer steel window (B. Jurado)
90° CF100 gate valve for channel plate
120° CF63 steel-window, 25 micrometer, dia=?
150° CF100 + extension Be-window, 100 micrometer, dia=+35mm
outside
60° CF35 Channeltron (D. Winters)
90° CF100 + extension Be-window, 100 micrometer, dia=+35mm
120° CF35 Quarzglass/fused-silica window, dia=38mm
145° CF100 + extension Be-window, 100 micrometer, dia=+35mm
1st downstream CF100 pneumatic drive + detector pocket 25 micron steel window
2nd downstream CF100 blind
bottom
1st downstream CF100 detector pocket 25 micron steel window
2nd downstream CF100 blind
1st upstream CF100 blind
top
1st downstream CF100 detector pocket 25 micron steel window
1st upstream CF100 blind





Updated list of as of 2021 before the beam time in 2022.

angle/pos.
port
current intallation
inside
35° CF100 + extension Be-window, 100 micrometer, dia=+35mm
60° CF63 detector pocket, 25 micrometer steel window (B. Jurado)
90° CF100 gate valve for channel plate
120° CF63 steel-window, 25 micrometer, dia=?
150° CF100 + extension Be-window, 100 micrometer, dia=+35mm
outside
60° CF35 CaF2 window, dia=?
90° CF100 + extension Be-window, 100 micrometer, dia=+35mm
120° CF35 Quarzglass/fused-silica window, dia=38mm
145° CF100 + extension Be-window, 100 micrometer, dia=+35mm
1st downstream CF100 blind (23/24: pocket of B.Jurado)
2nd downstream CF100 blind (23/24: pocket of B.Jurado)
bottom
1st downstream CF100 blind (23/24: pocket of B.Jurado)
2nd downstream CF100 blind (23/24: pocket of B.Jurado)
1st upstream CF100 blind
top
1st downstream CF100 blind (23/24: pocket of B.Jurado)
1st upstream CF100 blind





A list of currently installed window flanges at the target chamber, as of the last venting in late 2019.

angle
port
current intallation
inside
35° CF100 + extension Be-window, 100 micrometer, dia=+35mm
60° CF63 steel-window, 25 micrometer, dia=?
90° CF100 gate valve for channel plate
120° CF63 steel-window, 25 micrometer, dia=?
150° CF100 + extension Be-window, 100 micrometer, dia=+35mm
outside
60° CF35 unknown glass window, dia=?
90° CF100 + extension Be-window, 100 micrometer, dia=+35mm
120° CF35 Quarzglass/fused-silica window, dia=38mm
145° CF100 + extension Be-window, 100 micrometer, dia=+35mm
Entry  Mon Jul 20 09:04:17 2020, Jan Glorius, General, 90 degree detector extension Detektorhut_185.pdf
Attached is the drawing of the flange extension for the 90 degree ports at the target (so-called "Detektorhut").

The depth of the currently installed extensions is 95 mm, which is option "Teil 3 L = 95 mm" in the drawing.
Entry  Mon Oct 9 15:46:59 2023, Jan Glorius, General, fotos of chamber interior top_bottom_pockets.jpgchanneltron.jpgtop_pocket.jpgdownstream-view.jpg
New detector pockets (top/bottom) and a channeltron have been installed in the ESR target chamber. 
Fotos of the interior are attached, viewpoint is from the outside flange (zero degree detector position).
Entry  Tue Oct 10 21:25:28 2023, Jan Glorius, General, documentation of installations oct 2023 ESR_Targetumbauten_Okt_2023.png
A summary of installations in the target line done in october 2023 is given below and in the attachement.
The work was done mainly by Jan Glorius, Davide Racano and Nikita Kotovskiy.

mirror chamber:
- exchanged "south window" [now MgF2]
- exchanged "middle window" [now CaF2]
- installed two NEG pumps, one inside and one outside the ring [before: blind flanges]

interaction chamber:
- installed two detector pockets with stainless steel windows [25 micron], one on top and one on bottom of chamber [before: blind flanges]
- installed pneumatic drive in "zero degree position" [before: blind flange], mounted is a detector pocket with a stainless steel window [25 micron]
- installed channeltron in 60° outside flange CF40 [before: CaF2 window on CF63 adapter]
- opened & closed blind flange on bottom of chamber to check potential collisions of top pocket and moving side pocket

In the attached overview all flanges opened during installation work are labeled.