1
|
Fri Jun 28 10:08:25 2019 |
Jan | General | Drawing and 3D-models of the x-ray chamber | Attached is the 2d-drawing and a 3d-model
of the current ESR interaction chamber.
Additonally, the drawing of the extension |
|
2
|
Mon Feb 24 09:30:48 2020 |
Jan | Status Update | Installed window ports | Updated list of as of Oct 2023 before the
beam time in 2024.
|
|
3
|
Mon Jul 20 09:04:17 2020 |
Jan Glorius | General | 90 degree detector extension | Attached is the drawing of the flange extension
for the 90 degree ports at the target (so-called
"Detektorhut").
|
|
4
|
Mon Oct 9 15:46:59 2023 |
Jan Glorius | General | fotos of chamber interior | New detector pockets (top/bottom) and a channeltron
have been installed in the ESR target chamber.
|
|
5
|
Tue Oct 10 21:25:28 2023 |
Jan Glorius | General | documentation of installations oct 2023 | A summary of installations in the target line
done in october 2023 is given below and in
the attachement.
|
|