HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Laser Cooling Experiment 2021, Page 1 of 5  Not logged in ELOG logo
Entry  Tue May 31 07:29:11 2022, Ken, Detectors, XUV-Detektor 
Entry  Mon May 17 21:43:56 2021, Danyal, General, The test beamtime was a success. 
Entry  Mon May 17 08:05:42 2021, Team, General, End of beamtime 
Entry  Sun May 16 22:11:49 2021, Team, General, Laser Polarisation values 
Entry  Sun May 16 21:23:02 2021, Team, General, ESR OPEN -> preparation for Polarisation Tests 
Entry  Sun May 16 11:29:22 2021, Benedikt, General, Automated laser scans working 
Entry  Sun May 16 07:18:56 2021, Night Shift Sebastian/Max/Noah, General, Preparation for automated laser scans 
Entry  Sun May 16 07:03:07 2021, Team, General, Laser cooling with 166ps 
Entry  Sun May 16 06:13:46 2021, Team, General, Switch to 166ps  
Entry  Sun May 16 05:24:00 2021, Team, General, Laser cooling with 285ps 
Entry  Sun May 16 05:09:27 2021, Team, General, Switch to 285ps 
Entry  Sun May 16 05:09:04 2021, Team, General, Laser cooling with 482ps 
Entry  Sun May 16 02:28:21 2021, Team, General, #Beam ON! 
Entry  Sun May 16 02:22:19 2021, Sebastian, General, "Der Laser ist ok" 
Entry  Sun May 16 02:20:58 2021, Sebastian, General, "Der Laser ist (wieder) ok" 
Entry  Sun May 16 02:18:53 2021, Sebastian, General, UV Drop 
Entry  Sat May 15 12:11:54 2021, Benedikt, General, Laser-bunch-timing 
Entry  Sat May 15 11:26:44 2021, Benedikt, General, TEM parameters 
Entry  Sat May 15 11:06:31 2021, Benedikt, General, New Zoom link for the moment 
Entry  Sat May 15 09:57:24 2021, Dayshift, Runs, Currently on schedule  
ELOG V3.1.5-fc6679b