HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Laser Cooling Experiment 2021, Page 1 of 5  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authorup Category Subject
  17   Wed May 12 09:59:08 2021 BenediktGeneralRigol DSG821 signal generator settings
Attachment 1: CF7701F6-86BE-406C-8FAD-F3161463181C.jpeg
CF7701F6-86BE-406C-8FAD-F3161463181C.jpeg
  40   Thu May 13 20:18:10 2021 BenediktGeneralNew f_rev
The ions were changed to a different speed today at 2 PM. The new revolution frequency is now 1.291278 MHz.
  41   Thu May 13 21:00:48 2021 BenediktGeneralNew reprate of the UV laser
The lasersystem now operates at a reparte of 9.038946 MHz. This is 7 times f_rev (see previous post).

In the future, the laser-bunch-timing can be adjusted.
  56   Fri May 14 11:01:33 2021 BenediktCalibrationLaser Beam adjusted
The laser beam was adjusted in his position to overlap better with the ions.

Ion beam is destroyed at scraper position 1VO 6 mm and 2VO 4 mm; the laser beam looses half its power at 1VO 6mm and 2VO 4 mm.

EDIT: In the Schottky spectrum, we saw a stronger "cut" from the laser beam with slightly different settings in the TEM system. Later today, we could maybe finetune the ion-laser overlap while observing this "cut".
  57   Fri May 14 16:37:01 2021 BenediktGeneralStatus update
Right now, we have to adjust the ion beam a bit to overlap better with the laser beam.
We keep the laser wavelength at resonance with the ions and try to optimize the fluorescence signal on the XUV detector while moving the ion beam.
  67   Sat May 15 11:06:31 2021 BenediktGeneralNew Zoom link for the moment
https://tu-darmstadt.zoom.us/j/4948400422?pwd=SEJaUzBuYXM0TTd6UWxoZTFlWEZxUT09

Meeting ID: 494 840 0422
Passcode:  215586
  68   Sat May 15 11:26:44 2021 BenediktGeneralTEM parameters
We changed the horizontal position of the laser beam a bit, so that we maximized the fluorescence signal on the XUV detector (coasting beam, scanning laser (0.03 Hz)).

Old parameters: OffsetM Ax 0.00; Bx 0.00; Ay -0.08; By -0.40
New parameters: OffsetM Ax 0.00; Bx 0.35; Ay -0.08; By -0.40
  69   Sat May 15 12:11:54 2021 BenediktGeneralLaser-bunch-timing
Optimizing the laser bunch timing.
h = 7 (9.0389145 MHz)
Reprate is already set to same frequency.


Results: For h=7:
4 ns delay results in a maximum fluorescence rate in the XUV detector
25 ns delay shows the highest intensity in the Schottky spectrum while the laser operates at 1028.940 nm.
  80   Sun May 16 11:29:22 2021 BenediktGeneralAutomated laser scans working
The automated laser scans are working now.
We can now scan with the following functions: triangle, sawtooth, cosinus/sinus, arctan, min (linear scan, than stands still)

We are now testing these scan functions with coasting beams; ecooler 10 mA.
  1   Mon May 10 07:58:13 2021 DanyalGeneralTelephone numbers and Zoom link
Telephone numbers:

ESR laser lab: +49 (0)6159 71 - 2882
ESR measurement hut: +49 (0)6159 71 - 2880
HKR (main control room): +49 (0)6159 71 - 2317 or 2245

here is the zoom information:

https://tu-darmstadt.zoom.us/j/2183997317?pwd=WGc2TEkxYlEyNFhMWm02bFhqRnRVUT09

Meeting-ID: 218 399 7317
Passwort: 481607
  2   Tue May 11 15:49:30 2021 DanyalGeneralsetting up ESR
The operators are still busy extracting the beam from the SIS18 towards the ESR and injecting it into the ESR. 
  5   Tue May 11 18:29:35 2021 DanyalGeneralfirst ions in the ESR
Attachment 1: first_ions_are_injected.jpg
first_ions_are_injected.jpg
  6   Tue May 11 20:14:43 2021 DanyalGeneralbad ESR vacuum
I just heard that the ESR vacuum is quite bad. 
There was a small vacuum problem a while ago, it was sealed, but apparently the pressure is not as low as usual.

Markus Steck said that the beam lifetime is only 15 - 20 seconds !!! 

This will seriously complicate some of our test experiments :( 
  8   Wed May 12 02:34:29 2021 DanyalGeneralinstabilities in ion frequency
The ion beam moves around, pretty arbitrary. See picture. 
ESR crew believes that it is not due to fluctuations in the HV of the E-Cooler. 
Attachment 1: fluctuations.jpg
fluctuations.jpg
  20   Wed May 12 13:11:58 2021 DanyalAcceleratorshort break between 13:30 and 15:30
There will be a short break (2 hours) this afternoon. Between 13:30 and 15:30. 
The so-calles "super lense" in the UNILAC needs to be cleaned (rinsed). 
After that operation should continue as usual. 
  21   Wed May 12 15:36:04 2021 DanyalAcceleratorgeneral power failure in ESR! (everything is off)
The power in the ESR is off. 
(also on the gas-target area on top of ESR)
Electrical engineers are trying to find and fix the problem. 
  25   Wed May 12 22:35:33 2021 DanyalGeneralfrev and fb
Schottky frequency (189th harmonic) = 244.033662 MHz

revolution frequency  frev = 1.2911834 MHz

bunching frequency h=2  --> fb = 2.582367 MHz
bunching frequency h=10  --> fb = 12.911834 MHz
  30   Thu May 13 00:58:53 2021 DanyalDAQunbunched ion beam
Attachment 1: not_bunched_-_signal.jpg
not_bunched_-_signal.jpg
Attachment 2: not_bunched_-_Schottky.jpg
not_bunched_-_Schottky.jpg
  31   Thu May 13 01:01:27 2021 DanyalDAQbunched ion beam
Attachment 1: bunched_-_signal.jpg
bunched_-_signal.jpg
Attachment 2: bunched_-_Schottky.jpg
bunched_-_Schottky.jpg
Attachment 3: zoom_bunched_-_Schottky.jpg
zoom_bunched_-_Schottky.jpg
  32   Thu May 13 01:05:45 2021 DanyalDAQmore stability by bunching
Because the C3+ part of the ion beam is properly bunched, it is no longer so sensitive to the drifts caused by the e-cooler. 
In the O4+ part of the ion beam these drifts can still be seen. 
ELOG V3.1.5-fc6679b