Thu Mar 12 13:49:09 2020, Phe, test without bakeout, BPM SIS100 2010-17 (ceramic only), Received, On schedule, , 12.03.2020, DONE, Not Needed, 18.03.2020; 08:25, Setup 1, 19.03.2020; 11:00, Cond. Accep., 19.03.2020, M.Müller
|
|
Thu Mar 19 11:23:38 2020, Phe, test without bakeout, BPM SIS100 2010-15 (after cryo), , On schedule, , 19.03.2020, DONE, Not Needed, 19.03.2020; 15:00, Mobile 3, 25.03.2020, Cond. Accep., 26.03.2020, M.Müller
|
|
Wed Mar 25 14:22:40 2020, Phe, test without bakeout, Broken ceramic for BPM, , On schedule, , 25.03.2020, DONE, Not Needed, 26.03.2020, Setup 2, 27.03.2020, Cond. Accep., 28.03.2020, M.Müller
|
|
Mon Apr 6 15:33:45 2020, Phe, test with bakeout, Unbaked Ferrites from RI (bigger size), , On schedule, , 06.04.2020, DONE, Not Needed, , Setup 1, 22.04.2020, Cond. Accep., ,
|
|
Wed Apr 22 08:35:13 2020, Phe, test without bakeout, BPM 2010-15 - 2 weeks pump down in Hackhalle, , On schedule, , 21.04.2020, DONE, Not Needed, 21.04.2020; 17:00, Mobile 3, 24.04.2020, Accepted, 23.04.20, M.Müller
|
|
Wed Apr 22 10:14:43 2020, Cristina, test with bakeout, Ceramic Tube for Cryring (Sieber, KW13, Delayed, 22.04.2020, 24.04.2020, DONE, Not Needed, 27.04.2020, Setup 2, 06.05.2020, Refused, 8.05.2020, T.Sieber
|
|
Wed Apr 22 13:45:53 2020, Cristina, test without bakeout, p-linac dipoles, 20.04.2020, On schedule, , 20.04.2020, DONE, Accepted, 21.04.2020, HEBT Setup, 29.04.2020, Cond. Accep., 27.05.2020, Florian (Grossmontage)
|
|
Fri Apr 24 09:56:27 2020, Cristina, test with bakeout, Be windows-Spillman, KW18, On schedule, , 28.04.2020, DONE, Not Needed, 26.05.2020, Setup 2, MEASUREMENTS STOPPED, , 02.10.20, Collegue Spillman
|
|
Wed May 13 15:26:53 2020, Phe, test with bakeout, Big Baked Ferrites PLT 90/50/30 8C11 and Small baked Ferrites CMD5005, , On schedule, , 11.05.2020, DONE, Not Needed, 13.05.2020; 7:40 am, Setup 1, 25.05.2020, Cond. Accep., ---------, -----------
|
|
Tue May 19 09:20:24 2020, Cristina, test with bakeout, Ceramic parts Hillenbrand, 25.05.20, On schedule, , 25.05.2020, DONE, Accepted, 26.05.2020, Setup 1, 30.05.2020, Accepted, 09.06.2020, Hillenbrand
|
|
Tue May 19 12:03:40 2020, Phe, Problem, Turbo Pump from Thomas Seiber, , On schedule, , KW19, DONE, Not Needed, 19.05.2020, Customised, 20.05.2020, Refused, 27.05.2020, Student from T.Sieber
|
Die Pumpe hat den Fehlercode 088 und hat eine Störung des Axiallagersensors.(checked by Graziano) |
Wed May 27 10:34:37 2020, Phe, test without bakeout, BPM SIS100 X2010-16, , , , KW21, DONE, Not Needed, 20.05.2020, Customised, 22.05.2020, Cond. Accep., 26.08.20, M.Müller
|
|
Wed Jun 17 10:13:57 2020, Cristina, test with bakeout, IPM SIS18, End May, On schedule, , End May (the gewind had to be redone by Pfeiffer), DONE, Accepted, 17.06.2020 and restarted on the 22.06.2020 and restarted on 25.08.20, Customised, 31.08.20, Cond. Accep., 04.09.2020, Back to Tino G.
|
|
Wed Jun 17 12:58:02 2020, Cristina, test without bakeout, SIS100 Dipole 07-6-016-4, ----, , ------, 17.06.2020, DONE, Accepted, 17.06.2020, HEBT Setup, 19.06.2020, Cond. Accep., 22.06.2020, brought back to the TH
|
|
Fri Aug 28 11:51:30 2020, Phe, test without bakeout, SIS100 dipole 07-00009-020-01, , , , , DONE, Accepted, 26.08.20, HEBT Setup, 28.08.20, Refused, 1.09.20, in the TH
|
|
Fri Aug 28 11:52:43 2020, Phe, test without bakeout, BPM SIS100 2010-61, , , , 26.08.20, DONE, Accepted, 26.08.20, Mobile 3, 28.08.20, Cond. Accep., 09.09.20, S. Fiedler
|
|
Fri Sep 11 09:56:40 2020, Cristina, test without bakeout, BPM SIS100 X2010-63, , , , , DONE, Accepted, 31.08.2020, Mobile 3, 01.09.20, Accepted, 09.09.20, S. Fiedler
|
|
Fri Sep 11 09:59:20 2020, Cristina, test without bakeout, Bellows IPM SIS18, , , , 01.09.2020, DONE, Refused, 02.09.2020, HEBT Setup, 03.09.2020, Refused, 11.09.2020, Zentrale Dienst (back to Giacomini)
|
|
Fri Sep 11 10:07:46 2020, Cristina, test with bakeout, Nuts company TwinNut, , , , , DONE, Accepted, 01.09.2020, Mobile 2, 10.09.2020, Accepted, ------, --------
|
|
Fri Sep 11 10:13:59 2020, Cristina, test without bakeout, Cecom diagnostic chamber HEBT, , , , 01.09.2020, DONE, Accepted, 02.09.2020, Setup 1, 04.09.2020, Cond. Accep., 23.09.20, M.Müller
|
|
|