Entry  Wed Jan 20 11:48:54 2021, Cristina, test without bakeout, HEBT BPM cleaned @GSI, , , , 19.01.21, DONE, Accepted, 20.01.21, Mobile 3, 21.01.21, Refused, 24.02.21, M.Müller 
 
Entry  Fri Jan 29 11:50:13 2021, Cristina, General, Pillow seals SFRS, , , , 14.01.21, DONE, Accepted, 18.01.21, Customised, 26.02.21, Cond. Accep., 12.03.21, Cristos 
 
Entry  Fri Jan 29 11:52:53 2021, Cristina, pumping speed, NEG strips CRYRing, , , , End Dec 20, DONE, Accepted, 25.01.21, Fischer-Mommsen, 17.02.2021, Accepted, 02.03.21, Nikos 
 
Entry  Fri Jan 29 11:54:20 2021, Cristina, leak check, Gate Valve, , , , 14.01.21, DONE, Accepted, 28.01.21, Customised, 28.01.21, Refused, 29.01.21, A.Tauschwitz 
 
Entry  Fri Jan 29 11:55:45 2021, Cristina, General, Lower pressure of primary pumps, , , , Dec 20, DONE, Accepted, 18.01.21, Customised, 22.01.21, Accepted, -----, G.Savino 
 
Entry  Mon Feb 1 16:04:00 2021, Phe, test with bakeout, Antriebe SIS100, , On schedule, , 01.02.2021, DONE, , 02.02.2021, Setup 1, 10.02.2021, Accepted, 11.02.21, M.Müller 
 
Entry  Wed Feb 3 11:47:32 2021, Cristina, leak check, CARME vacuum chamber, Dec 2020, Delayed, , 02.02.2021, DONE, Accepted, 02.02.2021, Customised, 02.202.2021, Accepted, 03.02.2021, N.Petridis 
 
Entry  Wed Feb 3 11:50:09 2021, Cristina, test with bakeout, Detector Pockets for scintillators SIS18, , , , 02.02.2021, on-going, , 08.02.21, HEBT Setup, 11.03.21, Cond. Accep., 12.03.21, M.Müller 
 
Entry  Wed Feb 17 11:30:26 2021, Cristina, test without bakeout, CECOM diagnostic chamber, 1.02.21, , , 17.02.21, DONE, Accepted, 18.01.21, Customised, 19.02.21, Cond. Accep., ,  
 
Entry  Wed Feb 17 11:31:08 2021, Cristina, test without bakeout, SIS100 BPM, , , , 15.02.21, DONE, Accepted, 16.02.21, , 18.02.21, Accepted, 24.02.21, M.Müller 
 
Entry  Wed Feb 17 11:50:45 2021, Cristina, leak check, SIS100 HF Cavities, , , , 15.02.21, DONE, Accepted, 15.02.21, Customised, 16.02.21, Accepted, 17.02.21, In Weitestadt 
 
Entry  Fri Feb 19 08:39:57 2021, Cristina, , HEBT BPM cleaned @GSI-second measurement, , , , 10.02.21, DONE, Accepted, 10.02.21, Customised, 18.02.21, Accepted, 24.02.21, M.Müller 
 
Entry  Fri Feb 19 08:41:46 2021, Cristina, leak check, 2x Cryostats-Kujouharov, 1.02.21, , 11.02.21, 11.02.21, DONE, , 12.02.21, Customised, 02.03.21, Cond. Accep., 09.03.21, Kojouharov 
 
Entry  Wed Feb 24 13:50:25 2021, Cristina, leak check, Cavity for DALINAC, 22.02.21, Delayed, 01.03.21, 09.03.21, DONE, Not Needed, 10.03.21, Customised, 11.03.21, Cond. Accep., 18.03.21, Dmytriiev D. 
The cavity is dirty und must be cleaned
Entry  Wed Feb 24 13:51:01 2021, Cristina, test with bakeout, 3D printed tube per pLinac, 01.03.21, , , 08.03.21, DONE, Accepted, 16.03.21, Setup 1, 18.03.21, Accepted, 18.01.21, Büro Andreas 
 
Entry  Wed Mar 10 12:11:04 2021, Cristina, test with bakeout, Viewports DN100 ESR, , , , 16.02.21, on-going, Not Needed, 16.02.21, Setup 1, 16.03.21, Cond. Accep., 26.03.21, R.Sanchez 
 
Entry  Thu Mar 18 11:40:02 2021, Cristina, test with bakeout, SIS100/HEBT Manipulator C.Dorn, , , , 17.03.21, DONE, Not Needed, 18.03.21, Setup 1, 24.03.21, Accepted, 29.03.21, M.Müller 
 
Entry  Wed Apr 28 10:05:13 2021, Cristina, test without bakeout, SIS100 pumping chambers -after cleaning by the Company, , , , 23.04.21, on-going, Accepted, 26.04., Customised, 21.05.21, Cond. Accep., ,  
5 chambers checked: 07-00052-05-3; 06-00052-06-0; 07-00052-02-2; 07-00052-03-9; 07-00052-04-6
Entry  Wed Apr 28 10:21:27 2021, Cristina, test without bakeout, Cecom after cleaning, , , , 06.04.21, DONE, Not Needed, 06.04.21, Customised, 08.04.21, Accepted, 12.05.21, M.Müller 
 
Entry  Wed Apr 28 10:23:18 2021, Cristina, test without bakeout, 3Dprinting Copper coated sample, , , , 25.03.21, DONE, Not Needed, 25.03.21, , 26.03.21, Cond. Accep., ,  
 