Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon Sep 30 11:04:15 2019, Cristina, leak check, Cryo collimator 11-1-18-8, , , , 24.09.2019, DONE, Accepted, 25.09.2019, Customised, 25.09.2019, Accepted, 26.09.2019, L. Bozyk 
 
Entry  Mon Sep 30 11:11:26 2019, Cristina, test with bakeout, Laser chamber -Winters, Beginning 2019, Delayed, , 16.08.2019, DONE, Accepted, 30.08.2019, Customised, 12.02.2020, Accepted, KW10, D.Winters Laser_chamber.jpg

The measurement was stopped because of the wrong heating jackets
Entry  Mon Sep 30 11:15:47 2019, Cristina , test with bakeout, Detector Recoil chamber ESR, , , , 2.09.2019, DONE, Accepted, 9.09.2019, Customised, 29.10.2019, Cond. Accep., 1.11.19, Hillenbrand Recoil_ESR_chamber.jpg
The chamber was brought in the lab without heating jackets, which where shipped on the 17.10.
Conditionally Accepted because the RGA after bakeout does
not fulfil the requirements.
Entry  Mon Sep 30 14:00:51 2019, Cristina, pumping speed, 800 l/s Agilent, , , , 20.09.2019, DONE, Accepted, 1Test:7.10.2019; 2Test: 14.11.2019, Fischer-Mommsen, 1.11.19, Cond. Accep., , Sent back to Agilent 
Pumping Speed measured a bit lower than stated
Entry  Mon Sep 30 14:04:43 2019, Cristina, pumping speed, Combi pump DN40, , , , 09.08.2019, DONE, Accepted, 20.08.2019, Fischer-Mommsen, 20.09.2019, Accepted, , Sent back to Agilent Agilent_combi_DN40.jpg
 
Entry  Mon Sep 30 14:06:07 2019, Cristina, pumping speed, Slim SIP 150, , , , 9.08.2019, DONE, Accepted, 07.02.2020, Fischer-Mommsen, 06.03.2020, Accepted, ,  Comparison.jpg
 
Entry  Wed Oct 9 07:55:47 2019, Phe, leak check, All metal gate valve (Bender), , , , 08.10.2019, DONE, Accepted, 21.10.2019, Customised, 24.10.2019, Accepted, 24.10.2019, M.Bender All_metal_valve.jpg
Leak check required by Markus Bender for a "all metal gate valve".  The gate valve was received on the 08.10.2019.  No deadline.  The gate valve is on Edgar's
desk - so Edgar can check it when he's back from holiday. 23.10.2019 Test DONE
Entry  Wed Oct 9 07:57:44 2019, Phe, test with bakeout, Cryring Detector Tube , , , , 09.10.2019, DONE, Accepted, 10.10.2019, Setup 1, 22.10.2019, Accepted, 24.10.2019, Spillmann 20191008_094940.jpg
Detector tube has been received from Grossmontage (given to Andreas Kraemer).  This Detector tube is for Cryring - measurement request from Dr. Uwe Spillmann.
 The Detector tube needs to have some additional components, which will be assembled by Alexander Borovik (from Giessen University).

Email has been
sent to Alexander Borovik and he might pick the Detector Tube on 09.010.2019.  The Detector Tube is on Phe's desk.

The detector tube has been picked
Entry  Wed Oct 9 08:01:51 2019, Phe, test with bakeout, Macor Samples from Tino Giacomini, , , , 02.10.2019, DONE, Accepted, 10.10.2019, Mobile 2, 6.11.19, Accepted, 8.11.19, Giacomini 
Macor samples have been received from Tino Giacomini on the 02.10.2019.  These Macor samples will be used for IPM chamber.  The test request is a vacuum
acceptance test with bake-out.
Entry  Wed Oct 9 14:19:09 2019, Phe, test with bakeout, Scrapper for ESR (for Markus Steck), , , , 09.10.2019, DONE, Accepted, 14.10.2019, Setup 2, 18.10.2019, Accepted, 24.10.2019, Schwarz ESR-Scraper.jpg
Measurements asked as "urgent" for ESR. This piece was already measured in 2014, and then stored in an unkwon place.
Entry  Mon Oct 14 10:08:14 2019, Cristina, leak check, Dipole chamber SIS100 First charge, , , , 10.10.2019, DONE, Accepted, 11.10.2019, Customised, 29.11.2019, Accepted, , Stored in the TH 
6 dipole received on the KW41. Integral leak check and 1 test without bakeout
After the vacuum test the chambers must be inserted on the magnet: 1 chamber
was not fitting easy into the magnet. It will go today (15.11.19) in the technology lab for mechanical measurements.
Entry  Mon Oct 14 10:09:36 2019, Cristina, leak check, Roughing CWT 3 charge, , , , 10.10.2019, DONE, Accepted, 14.10.2019, Customised, 14.11.19, Accepted, , Stored in Weiterstadt CWT.jpg
Integral leak check to be done for all CWT. 
DONE:
07-51-23-0; 07-51-26-1; 07-51-30-8; 07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6 (Black-orange spots
visible);07-51-36-0; 07-51-37-7; 07-51-32-2; 07-51-14-8;07-51-35-3;07-51-18-6; 07-51-29-2; 07-51-34-6
Entry  Wed Oct 16 08:24:29 2019, Toni, leak check, Kryokollimator , June 2019, Delayed, August, from September 2019, DONE, Not Needed, 02.09.2019, Customised, 09.12.2020, Accepted, ,  criocollimator.jpg
Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01; 11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9; 11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4; 11-1-17-1; 11-1-18-8;
11-1-20-1;11-1-25-6; 11-1-22-5;11-01-24-4;11-1-28-7;11-1-27-0;11-1-29-4;11-1-26-3;11-1-13-3;11-1-21-8;11-1-40-9; 11-1-39-3;11-1-30-0;11-1-19-5 (LEAK!!!);
11-1-33-1;11-1-23-2; 11-1-43-0;11-1-42-3; 11-1-37-9; 11-1-63-8; 11-1-57-7; 11-1-45-4; 11-1-49-2; 11-1-44-7; 11-1-58-4; 11-1-24-9;11-1-36-2; 11-1-31-7;
Entry  Mon Oct 21 10:24:59 2019, Cristina, Other, Tube Heidelberg, , , , 17.10.2019, DONE, Accepted, First Test: 24.10.2019; Second Test:30.01.20 , Horizontal Coating Setup, 29.10.2019: Refused; Second Test: 05.02.2020, Accepted, 11.02.2020, C.Schröter HD_tube.jpg
Tube to be coated for HD. After the first coating: PEELING. STOP and waiting for the nextstep to be decided in HD.
We cleaning the tubes many times, to
try to remove all the film, and then we performes succesfully the second coating.
Entry  Thu Oct 24 14:55:28 2019, Toni, , , , , , , , , , , , , ,  
 
Entry  Thu Oct 24 14:58:25 2019, Toni, , , , , , , , , , , , , ,  
 
Entry  Fri Nov 1 10:41:45 2019, Cristina, test with bakeout, IPM Chamber, , , , 4.09.2019, DONE, Refused, , , , Refused, 1.11.19, Angelo 
Bellows to short
Entry  Fri Nov 8 10:52:43 2019, Cristina, test with bakeout, Macor 2 for IPM, , , , 8.11.19, DONE, Accepted, 11.11.2019, Mobile 2, 18.11.2019, Accepted, 04.12.19, T. Giacomini 
 
Entry  Mon Nov 11 08:06:09 2019, Phe, test without bakeout, Ref. Chamber for Beam Diagnostic Manipulator (Hackhalle), , , , unknown, DONE, Accepted, 11.11.2019; 10:15 am, stopped 12.11.2019, Customised, , Refused, ,  
Broken gauge (cold cathode gauge).  
Entry  Thu Nov 14 14:00:28 2019, Phe, test without bakeout, Ref. Chamber for Beam Diagnostic Manipulator, , , , unknown, DONE, Accepted, 14.11.2019; 10:30 am, Customised, 22.11.2019, Cond. Accep., N/A, N/A 
Wide range gauge is now installed on the chamber.  The previous test with cold cathode gauge failed due to broken gauge.  

Another complete new gauge
is now installed on the chamber.
ELOG V3.1.5-fc6679b