ID |
Date |
Author |
Category |
Subject |
73
|
Mon May 16 18:01:23 2022 |
mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu | Runs | runs afternoon/night shift 16.05 |
These are the runs after the septum was repaired on 16.05.
Time | ESR-intensity | ESR-intensity after orbit change | cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) | dwell time(s) | n loops | comments
|
ca. 18:00 | ? | ~3.0e7 | 223222 | 504-505 | 8121 | 601.62 - 601.405 | 0.005 | 5s | 4 | DAQ2 late start
|
18:11 | ? | ~3.3e7 | 223222 | 506 | 8122 | 601.62 - 601.405 | 0.005 | 5s | 4 | aborted, ions are rapidly lost after Bahnverlagerung
|
18:33 | 4.5e7 | ~3.7e7 | 223222 | 507-509 | 8123 | 601.62 - 601.405 | 0.005 | 5s | 4 | removed all scrapers, beam life time is better, high intensity, slight instability in bunching, ion intensity at the end: 1.4e7, DC Trafo was in saturation so ampl. was turned down
|
19:32 | ? | 3.7e7 | 223222 | 512 | 8125 | 601.62 - 601.405 | 0.005 | 5s | 4 | rf bunching amplitude decreased from 350V -> 280V
|
20:00 | ? | 3.6e7 | 223223 | 514 | 8127 | 601.745 - 601.32 | 0.01 | 5s | 4 | 43 steps of laser, therefore 1 step offset from loop to loop, laser already of ?
|
20:30 | ? | 2.9e7 | 223223 | 520-522 | 8129 | 601.760 - 601.320 | 0.01 | 5s | 6 | aborted after 3 loops, laserstabi was off, probably during hole measurement
|
21:01 | ? | 3.6e7 | 223223 | 524-528 | 8130 | 601.760 - 601.320 | 0.01 | 5s | 6 |
|
21:30 | ? | 3.4e7 | 223223 | 529-532 | 8131 | 601.760 - 601.320 | 0.01 | 5s | 6 | coasting beam now !!!
|
22:10 | ? | 3.7e7 | 223223 | 534-537 | 8132 | 601.760 - 601.320 | 0.01 | 5s | 6 | Night shift took over.
|
22:40 | 4.4e7 | 3.6e7 | 223223 | 539-542 | 8133 | 601.760 - 601.320 | 0.01 | 5s | 6 |
|
23:52 | 3.8e7 | 3.2e7 | 223223 | 545-548 | 8134 - 8135 | 601.760 - 601.320 | 0.01 | 5s | 6 | Switched off the nitrogen before this run, stopped acq. after 4 loops (laser gone), PMT north saw a lot of noise? (ID:78) -> larger files.
|
00:39 | 4.3e7 | 3.2e7 | 223222 | 552-555 | 8136 | 601.760 - 601.320 | 0.01 | 5s | 6 | The secondary DAC always requires 2-3 restarts until it is working.
|
01:10 | 3.8e7 | 3.0e7 | 223222 | 557-558 | 8137 | 601.760 - 601.320 | 0.01 | 5s | 6 | Laser moved away during the third loop, acq. stopped.
|
01:33 | 4.2e7 | 3.1e7 | 223222 | 561-564 | 8139 | 601.760 - 601.320 | 0.01 | 5s | 6 | The previous laser scan was still running, restarted the acq. once.
|
02:00 | > 4.0e7 | 3.4e7 | 223222 | 566-569 | 8140 | 601.760 - 601.320 | 0.01 | 5s | 6 |
|
02:30 | > 4.0e7 | 3.2e7 | 223222 | 573-576 | 8141 | 601.760 - 601.320 | 0.01 | 5s | 6 |
|
02:58 | 4.2e7 | 3.4e7 | 223222 | 579-582 | 8142 | 601.760 - 601.320 | 0.01 | 5s | 6 |
|
03:45 | 4.2e7 | 3.3e7 | 223222 | 585-589 | 8143 | 601.760 - 601.320 | 0.01 | 5s | 6 | Back to bunched beam mode
|
04:15 | 4.7e7 | 3.4e7 | 223222 | 594-598 | 8144 | 601.760 - 601.320 | 0.01 | 5s | 6 |
|
04:43 | 4.4e7 | 3.4e7 | 223222 | 600-604 | 8145 | 601.960 - 601.520 | 0.01 | 5s | 6 | We changed the scan range
|
05:10 | 4.3e7 | 3.3e7 | 223221 | 606-610 | 8146 | 601.960 - 601.520 | 0.01 | 5s | 6 | It looks like the "overWavel" plots actually work better now, because the laser steps somehow are counted wrongly, leading to shifts between loops.
|
05:37 | 4.2e7 | 3.7e7 | 223221 | 611-615 | 8147 | 601.960 - 601.520 | 0.01 | 5s | 6 |
|
06:27 | ? | ? | 223219 | 616-618 | 8148 | 601.960 - 601.520 | 0.01 | 5s | 6 | Since Go4 was still running during startup we were not able to look into the data during the scan. After reduction of particle number, the dc trafo is no longer capable to measure to number of ions.
|
06:56 | ? | ? | 223219 | 619-620 | 8149 | 601.960 - 601.520 | 0.01 | 5s | 6 |
|
07:25 | ? | ? | 223219 | 621-622 | 8150 | 601.9 - 601.7 | 0.01 | 5s | 6 | Changed the scan range t0 601.9-601.7 and reduced step increment to 0,005nm
|
07:56 | ? | ? | 223219 | 623-624 | 8151 | 601.9 - 601.7 | 0.01 | 5s | 6 |
|
08:20 | ? | ? | 223219 | 625-625 | 8152 | 601.9 - 601.7 | 0.01 | 5s | 6 | Restarted scan without new injection, DAQ2 was not running during this scan
|
08:44 | ? | ? | 223220 | 626-627 | 8153 | 601.9 - 601.7 | 0.01 | 5s | 6 | Reduced Loop number to 4 (aborted after 4 completed scans)
|
09:03 | ? | ? | 223220 | 628 | 8154 | 601.9 - 601.7 | 0.01 | 5s | 6 | Reduced Loop number to 3 (before starting a new scan)
|
09:17 | ? | ? | 223221 | 629 | 8155 | 601.9 - 601.7 | 0.01 | 5s | 6 |
| Since |
16
|
Mon May 9 09:43:08 2022 |
Zoran | Accelerator | ESR Beam |
The main control room started setting up the Bi beam this morning, but quickly stopped in order to solve some problems around the UNILAC. Therefore we
should not plan to receive ions earlier than late in the evening on Monday, or probably Tuesday during the day. |
24
|
Mon May 9 19:56:41 2022 |
Zoran | Accelerator | status Monday evening |
The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport and the devices for the
ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment before tomorrow morning.
=> the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
=> the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.
The ESR cave is closed again. Talk to the main control room if you need access. |
25
|
Tue May 10 09:05:19 2022 |
Zoran | Accelerator | status Monday evening |
> The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport
and the devices for the
> ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment
before tomorrow morning.
>
> => the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
> => the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.
>
> The ESR cave is closed again. Talk to the main control room if you need access.
Status SIS on Monday evening. ESR setting up starting on Tuesday morning. There is some prospect of getting more ions by setting up multi-multiturn
injection, however still uncertain. |
Attachment 1: 22-05-09_200006_20220509_170137_tcl1024_dcct.png
|
|
42
|
Wed May 11 08:01:44 2022 |
Zoran | Runs | Start laser scanning |
Quote: |
Questions:
There are many other masses/isotopes/etc. visible in the Shottky spectrum. Is this wanted?
Are the vacuum gauges turned off?
Laser timing correct? +- 3 bins?
|
No, this is not wanted and yes, the machine is aware of the problem. The decision on Tuesday evening was to leave the ESR in that state in order to start the measurement and continue setting on Wednesday. Otherwise the night shift could not take place.
The additional isotopes are only a few percent and should contribute insignificantly to the background rate. |
47
|
Wed May 11 20:47:54 2022 |
Zoran | Accelerator | beam lost in SIS |
For some reason the beam was lost in the SIS soon after taking the ESR beam this evening, reason unknown. Solved by sending teh full context to the SIS machine and having
operators to manually set the voltage of the SIS extraction kicker. Afterwards a slight readjustment of the transfer beamline was necessary:
In the SIS: GTE5 KY1, MU0, QD21, QD22 as well as in the ESR: GE01MU4I (5 -> 6 mrad)
This brought back around 1E7 particle in the ESR after 5 accumulated SIS injections. |
66
|
Fri May 13 08:32:41 2022 |
Zoran | Accelerator | NO BEAM UNTIL TOMORROW MORNING |
> The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
> Maybe tomorrow in the morning briefing there will be more information about this.
>
> The night shift will not take place!
> The morning shift starts at 9:00 or on further notice!
>
> The PMTs are switched off and the laser also.
Update from the morning briefing: the DCCT (power converter) of the injection septum was demounted and the EPS group is trying to fix it. There is no replacement available, so if they do not succeed this beamtime is over. They promised more information in the midday meeting at 12:45.
In the ESR Messhüte is some cake ("Trostkuchen"). |
79
|
Tue May 17 06:37:28 2022 |
YL, KM | Accelerator | Reduced beam intensity |
The resonance in 209Bi has been seen during the night.
Reducing the intensity by a factor~1000, to simulate 208Bi conditions
Running low intensity since ~6:15-6:20
The present intensity is so low that DCCT does not see the beam.
On Schottky the beam is clearly seen as ~30-40 dB over the background.
The real intensity is to be determined from the NTCap, which is running (checked). |
45
|
Wed May 11 18:00:40 2022 |
Wilfried, Phillip, Max | Detectors | double PD NO peak problem solved |
In entry 36 one finds an additional PD NO peak around bin 100.
This was caused by signal reflection in the cable.
The problem was solved by adjusting the CFD threshold from 10 to 30.
|
46
|
Wed May 11 18:13:04 2022 |
Wilfried, Phillip, Max | DAQ | laser scan/step complete |
The scaler channel laser scan complete and laser step complete is interchanged in go4. Carsten will fix this on the software side.
Additionally the laser scan complete signal was not there in the first place. After checking the signal on multiple points, the signal was suddenly back in the DAQ.
Possibly there is a bad cable/contact somewhere (on the Labjack?). The signal should be checked in go4 from time to time. |
17
|
Mon May 9 11:45:57 2022 |
Wilfried, Jon, Sebastian | General | HV Divider position & DMM calibration |
We performed an autocalibration (attached picture 1) of the Keysight 34465A DMM (TUD Keysight).
The position and the "cabling" to the cooler platform was also adjusted (picture 2,3). |
Attachment 1: DMM_calibration.PNG
|
|
Attachment 2: dividerPosition.PNG
|
|
Attachment 3: dividerPosition1.PNG
|
|
94
|
Mon May 30 21:52:08 2022 |
Wilfried, Danyal, David, Rodolfo | General | Position of T-Scrapers |
We have determined the position of the H-like 208Bi ion beam using the T-Scrapers. The position actually did not change in comparison to the position of H-like 209Bi.
Here we have the values where the beam was "gone"
device | move in dir. | gone (mm) | x0 (mm)
|
GECEDS1VU | up | 0.7 |
|
| | |
|
GECEDS1HA | right | -22 | -4.7
|
| left | -13.0 |
|
| | |
|
GECEDS2VU | up | 0.0 |
|
| | |
|
GECEDS2HA | right | -18.5 | 3.1
|
| left | -9.5 |
|
Below you can see a screenshot with the settings of the beam stabilization system. |
Attachment 1: MRC_208Bi_30-05-2022-10Uhr.png
|
|
23
|
Mon May 9 19:05:17 2022 |
Wilfried | DAQ | Q-Switch signals + 0.5 ms and +1 ms in VUPROM |
We have generated two additional signals which are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
Q-Switch + 1.0 ms --> channel 10
(channel numbering 0-15)
The delays are generated by the two channels of a DGG222 |
14
|
Fri May 6 16:29:03 2022 |
Simon, Patrick | Detectors | PMT preparation |
We changed PMT north and PMT south and tested them at 1500 V.
Both new PMTs are broadband.
PMT north and middle see between 2 and 7 kHz signal rate with a threshold close to the background noise.
PMT south still has the plastic cap on and is intended to be used as a reference for electro-magnetic disruptions. No signal was seen at 1500 V.
We fixed the signal cable of PMT south to the NIM-crate to get rid of background noise picked up by the cable. |
55
|
Thu May 12 10:10:35 2022 |
Simon, Christopher, Wilfried, Sebastian | DAQ | 1ms gated PMT north / middle added to DAQ |
We added on DAQ1 and DAQ2 1ms gated PMT North and PMT Middle signals.
Now we "supress" the signal by a factor of ~30.
DAQ1:
Channel 11 --> 1ms gated PMT North
Channel 12 --> 1ms gated PMT Middle
DAQ2:
Channel 12 --> 1ms gated PMT North
Channel 13 --> 1ms gated PMT Middle
Update: the same gate has been added to the XUV anode and anode delayed signals, but on their original TDC channels not on new ones, in order to not only reduce the background in the XUV signals but also reduce the load on the DAQ. |
58
|
Thu May 12 11:31:11 2022 |
Simon, Christopher, Shahab, Wilfried, Sebastian, Ragan | General | Runs morning shift |
Time | SIS-intensity | ESR-intensity after orbit change | cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) | dwell time(s) | n loops | comments
|
11:30 | - | 8,2e6 | 223219 | 497 - 500 | 8119 - 8119 | 601.62 - 601.405 | 0.005 | 5s | 6 | after this run we had to give the ESR Group the beam
|
|
|
39
|
Wed May 11 06:41:32 2022 |
Simon, Christopher, Shahab | Runs | shifts |
new shift started. |
40
|
Wed May 11 06:47:58 2022 |
Simon, Christopher, Shahab | Runs | restart laser scan |
Time | SIS-intensity | ESR-intensity after orbit change | cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) | dwell time(s) | comments
|
06:37 | 7.8e7 | ? | 223217 | 392-395 | 8080 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
07:10 | 4.8e7 | ? | 223217 | 396-399 | 8081 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
07:48 | 1.3E8 | ? | 223219 | 400-403 | 8082 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
08:25 | 3.9E7 | ? | 223219 | 404- 406 | 8083 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
08:59 | 5.8E7 | ? | 223219 | 407 | 8084 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
09:38 | 7.2E7 | 3.1E6 | 223219 | 408-411 | 8085 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
10:24 | 6.4E7 | 3.1E6 | 223219 | 412-415 | 8086 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
11:05 | 7E7 | 2.2E6 | 223219 | 416-418 | 8087 | 601.95 - 601.735 | 0.005 | 5s | 8 loops
|
11:36 | 6E7 | 2.2E6 | 223219 | 419-420 | 8088 | 601.95 - 601.735 | 0.005 | 5s | number of loops now 4
|
11:56 | 2E8 | 6.9E6 | 223219 | 421-423 | 8089 | 601.62 - 601.405 | 0.005 | 5s | 4 loops, changed scan range
|
12:28 | 1.1E8 | 5E6 | 223219 | 424-426 | 8090 | 601.62 - 601.405 | 0.005 | 5s | 4 loops
|
12:43 | 6.5E7 | 2.6E6 | 223219 | 427-429 | 8091 | 601.62 - 601.405 | 0.005 | 5s | 4 loops
|
13:11 | 1.3E8 | 5.8E6 | 223219 | 430-432 | 8092 | 601.62 - 601.405 | 0.005 | 5s | 4 loops
|
|
41
|
Wed May 11 07:28:39 2022 |
Simon, Christopher, Shahab | General | DAQ Loop for shifters |
Procedure:
- Scanning phase ends (on LabView wait until "Idle Status" blinks. it will show e.g. 8 loops and 44 scans)
- on DAQ2 (Carsten) and DAQ1 type (simultaneously):
sto ac
- on DAQ2 (Carsten) and DAQ1 type:
clo fi
exit
- on DAQ1 computer, stop GO4 and close it
- on DAQ2 (Carsten) and DAQ1 type:
resl
mbs
@startup
- on DAQ1 computer, start GO4
go4&
- request new injection (move the green slider to red, wait for machine to go further, then move it back to green)
ESR_EXP22_03_209Bi83_Laser_06May.C1.9_WAIT_FOR_MANIP_BY_OP
- in Lassie Monitor, remember the value of SIS-Trafo (GS09DT_ML) after injection, and put it later in the elog table
- wait until the ion beam is cooled (look at the Schottky monitor)
- on DAQ2 (Carsten) and DAQ1 type (simultaneously):
sta ac
- on LabView press on button
Start Scan
- Scanning phase starts.
- you can show the status (and also the current filename) by using the command
sh ac
- update elog with SIS Current, Filenames, and time
- restart from top |
27
|
Tue May 10 11:59:45 2022 |
Simon, Christopher, Kristian, Sebastian | Laser | Labview VI checkups |
The lower limit (to position) of the Cobra control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 the "to position" has to be 601.735.
We also checked the displayed HV values in Go4 with the shown values of the HV VI.
Both values in go4 and in the VI show the same value and are changing "simultaneously" (depending on the refresh time of go4 and Labview). |