HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  nuclear two-photon decay 2024, Page 1 of 4  Not logged in ELOG logo
ID Date Authordown Category Subject Text Attachments
  55   Thu May 16 16:43:29 2024 YuriAcceleratorHHTHHT sees radiation from us. We stop for 10
min for them to see the speed with which
the radiation level decreases.
  
  38   Wed May 15 23:04:32 2024 XinliangAnalysisElectron cooler dataThe cooler curve measured during May 14 afternoon.  20240515230302.pngdata_2024_-_sergey.xlsxiso.xlsx 
  8   Tue May 14 19:07:27 2024 ShahabRunsBroadband measurement / High Sampling rateStable beam after a long time:

  
  9   Tue May 14 21:41:11 2024 ShahabRunsTest Screenshot   2024-05-14_21-39-01-112_tcl1048.png 
  51   Thu May 16 14:52:45 2024 ShahabDAQZr recordingRecording Zr starting from 14:45 again back
to short cycle.
  
  48   Thu May 16 11:20:10 2024 SergeyAcceleratorScreenshot of ESR pattern with 140 repetitions (each is 100 ms)Injection Beam Process: 100ms
Bunching Beam Process: 16ms
Intermediate Beam Process: 100 ms, which
 2024-05-16_11-19-01-545.png 
  Draft   Thu May 16 12:48:58 2024 SergeyAcceleratorTune to 98Zr- stop longer measurements
- change quadrupole and sextupole magnets
- rescale SIS-TE-ESR
  
  7   Tue May 14 15:07:23 2024 Ruijiu, David, Shahab, Xinliang, ZhangminRunsCooler curve measurement

Cooler curve measurement
 7x 
  2   Mon May 6 12:16:09 2024 Ruijiu ChenDAQntcap scaler   ScalerSignalMap20240515.pdf 
  4   Thu May 9 10:01:59 2024 Ruijiu ChenDAQNI crate of NTCAP system can not be started.After moving the NTCAP system from HKR to
ESR Messhutte, we tested the system with
a signal generator on 16th February and confirmed
 VID_20240508_113353.mp4dc36252cc5b2262cb6eab099009f16ed.mp4comparision_iq.jpgcomparision_sc.jpgcomparision_sc.png 
  5   Thu May 9 15:59:30 2024 Ruijiu ChenDAQCarsten checked the NTCAP system.Exactly this was the question. If several
devices fail at the same time and you look
for the course you might get suspicious.
  
  6   Sun May 12 18:34:54 2024 RuijiuAnalysisHow to use queqiao to transfer tiq dataIf the ssh to lxir131 was disconnected, you
can connect to lxir131 and restart queqiao
program to transfer tiq data from NAS to
 start_OnlineDataAnalysis.jpgqueqiao_rsa.jpg 
  41   Thu May 16 07:25:33 2024 Mayr, HannesRunsLassie Screenshot 07:23Start of regular screenshots of the Lassie
monitor every 1-2 hours.
 2024-05-16_07-23-30-208_tcl1064.png 
  42   Thu May 16 07:50:39 2024 Mayr, HannesRunsPeaks with very high particle ratePeaks in the particle diagram going to unusual
high 1.4e9 particles.
 2024-05-16_07-49-53-757_tcl1064.png 
  43   Thu May 16 08:58:39 2024 Mayr, HannesRunsFluctuations in particle rateParticle rates are fluctuating and increasing
from a constant 5e8 to something around 1e9.
 2024-05-16_08-58-00-964_tcl1064.png 
  44   Thu May 16 09:41:56 2024 Mayr, HannesRunsNo beamNo beam from 09:39 to 10:10 due to a setting
change. The change aims to increase the measurement
time to 10s.
  
  45   Thu May 16 10:18:14 2024 Mayr, HannesRunsBeam back, DAQ offBeam is back since 10:10, but DAQ is turned
off to change the setting there.
Measurements starting at 10:18 are only test
  
  46   Thu May 16 11:08:27 2024 Mayr, HannesRunsDAQ running again"Real" measurement with good data starting
from 11:07 until approximately 13:00.
Measurement time was changed to 10s with
  
  47   Thu May 16 11:13:05 2024 Mayr, HannesRunsRatesWith the new timing, the rates now look like
can be seen in the screenshot.
 2024-05-16_11-10-57-933_tcl1064.png 
  50   Thu May 16 13:04:02 2024 Mayr, HannesRunsDAQ stopped, change setting to 98ZrBeam tuning for 98Zr starting at 12:53, following
data should be excluded from analysis. DAQ
was stopped around 13:13.
  
ELOG V3.1.5-fc6679b