ID |
Date |
Author |
Category |
Subject |
56
|
Thu May 16 16:45:33 2024 |
Ide, Hubbard | Runs | Beam returned to ESR |
beam is back
16:45 |
57
|
Thu May 16 18:28:31 2024 |
Ide, Hubbard | Runs | No beam to ESR |
beam issues between 18:23-18:26
and beam completely lost from 18:27 till 18:32
in the SIS an issue with a dipole occured |
58
|
Thu May 16 18:33:30 2024 |
Ide, Hubbard | Runs | Beam returned to ESR |
Beam is back at 18:32
now in the particle plot the peaks seem to be more isolated than before (see attachment 1)
since 18:36 it looks like before (see attachment 2) |
60
|
Thu May 16 19:10:27 2024 |
Ide, Hubbard, Xinliang, David, Shahab | Runs | New Run setting for Zr Isomer hunt |
19:10 runs from now on run with an optimized setting:
we did a lot of optimization for the hunt of Zr isomer:
1- increased the time as much as possible, but stay within the 1:1 cycle with FRS
2- increased the sampling rate from 6.25 MSPS to 50 MSPS (!) going down to very short recording times --> 300ms only
We are now taking data with this settings for about half an hour. |
61
|
Thu May 16 21:13:18 2024 |
Ide, Hubbard | Runs | Intensity drop |
The intensity dropped at 21:10 from ~ 1.6E9 down to ~ 8E8 |
62
|
Thu May 16 21:26:50 2024 |
Ide, Hubbard | Runs | Intensity back to previous values |
since 21:20 the intensity is back to 1.5E9 |
63
|
Thu May 16 21:40:20 2024 |
Ide, Hubbard | Runs | Intensity drop |
Intensity in particles dropped from 21:33 |
64
|
Thu May 16 21:51:22 2024 |
Ide, Hubbard | Runs | Intensity back to previous values |
since 21:48 particle intensities increased to again to 1.5E9 |
65
|
Thu May 16 23:08:34 2024 |
Ahmed, Zidarova | Runs | Beam dropped |
Beam dropped between 23:00 and 23:05 |
66
|
Fri May 17 00:15:24 2024 |
Ahmed, Zidarova, Kalaidjieva | Runs | Beam gone |
HHT called and said they have problems and need to enter the cave, so they stop the beam for some time
Beam Stop 00:10
Beam back 01:01 |
67
|
Fri May 17 05:48:33 2024 |
Ahmed, Zidarova, Kalaidjieva | Runs | Beam stopped |
HHT have more problems and need to enter the cave, beam is stopped for some time
Beam stop: 05:46
Beam back 6:31 |
71
|
Fri May 17 17:08:24 2024 |
Jelena B, Zsolt P. | Runs | New setting from 5p.m. |
NEW SETTING
All runs from 17:00 are with new setting, due to changing the directory - transfer from old to new one around 200 runs. |
84
|
Sat May 18 00:06:56 2024 |
Shahab | Runs | HHT people out again |
we try to re run the ESR. ESR behaves very strangely. Something not so right. |
86
|
Sat May 18 00:37:21 2024 |
Helmut, Wolfram, Shahab, David, Xinliang | Runs | Trying to get back to Zr setting |
|
87
|
Sat May 18 00:37:52 2024 |
Helmut, Wolfram, Shahab, David, Xinliang | Runs | SIS beam gone |
|
97
|
Sat May 18 16:29:15 2024 |
Filip, Taka, Shahab | Runs | Good operation screen shot |
|
103
|
Sun May 19 15:13:48 2024 |
xing xu, hongfu | Runs | No beam |
beam is down 14:45. Problem with UNILAC. may take an hour. |
104
|
Sun May 19 17:48:15 2024 |
xing xu, hongfu, shahab | Runs | Beam back |
beam is back, first file 17:47 |
111
|
Tue May 21 03:07:58 2024 |
K.Takiura Y.Kikuchi | Runs | No beam |
03:07 Beam is down. |
112
|
Tue May 21 03:27:21 2024 |
K.Takiura Y.Kikuchi | Runs | Beam back |
03:26 Beam is back. |