ID Date Author Categorydown Subject
  80   Fri May 17 22:43:11 2024 Jelena B, Zsolt P.AcceleratorESR_e.cooler are back
We have back ESR and we have a fixed issue with a cooler. 

Beam issues! 
  81   Fri May 17 22:48:14 2024 Jelena BAcceleratorBack to old setting
We go back to the Zr-settings to make a deffinite state of ESR and we move again to previous setting (Sr) 
  88   Sat May 18 01:57:44 2024 WeickAccelerator96Sr isoc setting
We fist verified the ESR after a crash with the 98Zr setting, was fine good resolution, 
then we scaled to 96Sr directly at gamma_t not with shift as before.
E_SIS        = 449.21 MeV/u for 100Mo 38+
after target = 373.36 MeV/u for  96Sr 38+ 
in ESR       = 373.60 MeV/u for  96Sr 38+
in the LISE calculation this leads to gamma = 1.40082 as before in the other settings.
yield is very low now, but some lines.
  90   Sat May 18 02:22:30 2024 Helmut WeickAcceleratorpaper log book pages 17.05.2024
until we lost the beam in the night.
  94   Sat May 18 14:43:59 2024 YuriAcceleratorReduce intensity, 98Mo42+
reduce intensity
eexds2ha 7mm --> 9 mm
e02ds3hg -69 mm -- stays

measure for about 30 min

9 mm was too much, change to +8 mm
  98   Sat May 18 16:45:15 2024 Helmut, YuryAcceleratorsetting for 96Sr (98Y)
To have a few more lines the setting actually is not on 96Sr directly, but on 98Y39+.
98Y is also the one set to be isochronous. 
But in addition the SIS-energy is shifted by -0.9 MeV/u to get at least better transmission for 96Sr.
  99   Sun May 19 11:02:49 2024 Xu Zhou, Yuhu Zhang, KanikaAcceleratorthe beam is paused
The beam is paused and HHT team needs to enter the ring.
  100   Sun May 19 12:04:55 2024 KanikaAcceleratorBeam back
The beam is back.
  101   Sun May 19 14:11:29 2024 Yuri, SergeyAcceleratorSextupoles
at 13:00
scrapers in the ESR are moved to block the most outside orbits
E02DS3HG out -> -60 mm
EEXDS2HA out -> -75 mm

at 13:50
E02KS3 changed from +0.01 to -0.1
E01KS4 is unchanged at -0.26

peaks look somewhat narrower (see telegram)
  105   Mon May 20 05:32:17 2024 Gregor, CaglaAcceleratorShort beam interruption
We lost the beam for ~2min at (from ~5:28 till ~5:30). Everything seems to be back at the same state.
  106   Mon May 20 09:01:14 2024 YuriAcceleratorModify SP magnets
In attempt to remove double-peak structure, we will modify the SP magnets
START: 9:02
SP unchanged. Other values lead to a worse peak shapes.

Scrapers: 
EEXDS2HA: -75 mm -> -5 mm (hopefully the left half is scraped)
E02DS3HG: -60 mm - unchanged

STOP: 9:40
  113   Tue May 21 08:50:06 2024 YuriAcceleratorEoB
End of beamtime!
Request is out.
Scrapers are removed, slits in the TE line removed, ESR is ramped down.
  Draft   Fri May 17 22:38:30 2024 Jelena B, Zsolt P. ESR + e.cooler are back
We have back ESR and fixed issue with a cooler. 