Thu May 16 14:52:45 2024, Shahab, DAQ, Zr recording 
 | 
| Recording Zr starting from 14:45 again back to short cycle. | 
   Fri May 17 23:30:16 2024, Shahab, General, HHT people inside 
 | 
| no beam since about one hour, also HHT people inside since about 10 min. | 
   Sat May 18 00:06:56 2024, Shahab, Runs, HHT people out again 
 | 
| we try to re run the ESR. ESR behaves very strangely. Something not so right. | 
   Thu May 16 11:20:10 2024, Sergey, Accelerator, Screenshot of ESR pattern with 140 repetitions (each is 100 ms)  
 | 
Injection Beam Process: 100ms
 
Bunching Beam Process: 16ms
 
Intermediate Beam Process: 100 ms, which is repeated 140 times
 | 
   Thu May 16 12:48:58 2024, Sergey, Accelerator, Tune to 98Zr 
 | 
- stop longer measurements
 
- change quadrupole and sextupole magnets
 
- rescale SIS-TE-ESR | 
   Tue May 14 15:07:23 2024, Ruijiu, David, Shahab, Xinliang, Zhangmin, Runs, Cooler curve measurement 7x 
 | 
 
 
Cooler curve measurement
 | 
   Mon May  6 12:16:09 2024, Ruijiu Chen, DAQ, ntcap scaler  
 | 
|   | 
   Thu May  9 10:01:59 2024, Ruijiu Chen, DAQ, NI crate of NTCAP system can not be started.      
 | 
After moving the NTCAP system from HKR to ESR Messhutte, we tested the system with a signal generator on 16th February and confirmed that it was functioning 
correctly.
 
 | 
   Thu May  9 15:59:30 2024, Ruijiu Chen, DAQ, Carsten checked the NTCAP system. 
 | 
Exactly this was the question. If several devices fail at the same time and you look for the course you might get suspicious.
 
 
 
Anyhow,
 | 
   Sun May 12 18:34:54 2024, Ruijiu, Analysis, How to use queqiao to transfer tiq data   
 | 
If the ssh to lxir131 was disconnected, you can connect to lxir131 and restart queqiao program to transfer tiq data from NAS to luster.
 
 
1. Open a terminal on any GSI linux computer, like the one in the Measurement Room:
 | 
   Mon May 20 09:01:51 2024, Oliver, Jelena, General, Shift news 
 | 
Data collection runs smooth so far.
 
 
Yuri Litvinov will start modifying SP magnets now. The resolution will change. | 
   Thu May 16 07:25:33 2024, Mayr, Hannes, Runs, Lassie Screenshot 07:23  
 | 
| Start of regular screenshots of the Lassie monitor every 1-2 hours. | 
   Thu May 16 07:50:39 2024, Mayr, Hannes, Runs, Peaks with very high particle rate  
 | 
| Peaks in the particle diagram going to unusual high 1.4e9 particles. | 
   Thu May 16 08:58:39 2024, Mayr, Hannes, Runs, Fluctuations in particle rate  
 | 
| Particle rates are fluctuating and increasing from a constant 5e8 to something around 1e9. | 
   Thu May 16 09:41:56 2024, Mayr, Hannes, Runs, No beam 
 | 
| No beam from 09:39 to 10:10 due to a setting change. The change aims to increase the measurement time to 10s. | 
   Thu May 16 10:18:14 2024, Mayr, Hannes, Runs, Beam back, DAQ off 
 | 
Beam is back since 10:10, but DAQ is turned off to change the setting there.
 
Measurements starting at 10:18 are only test runs and should not be used for analysis. | 
   Thu May 16 11:08:27 2024, Mayr, Hannes, Runs, DAQ running again 
 | 
"Real" measurement with good data starting from 11:07 until approximately 13:00.
 
Measurement time was changed to 10s with injections every 32s. | 
   Thu May 16 11:13:05 2024, Mayr, Hannes, Runs, Rates  
 | 
| With the new timing, the rates now look like can be seen in the screenshot. | 
   Thu May 16 13:04:02 2024, Mayr, Hannes, Runs, DAQ stopped, change setting to 98Zr 
 | 
| Beam tuning for 98Zr starting at 12:53, following data should be excluded from analysis. DAQ was stopped around 13:13. | 
   Sun May 19 12:04:55 2024, Kanika, Accelerator, Beam back 
 | 
| The beam is back. |