HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  nuclear two-photon decay 2024, Page 5 of 6  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  110   Mon May 20 14:02:03 2024 Jelena, Oliver, ShahabDAQRetune 245 MHzMew numbers for 245 MHz plunger is 190 (both)   
  1   Tue Apr 16 15:35:07 2024 JanCollaborationG-PAC Proposal   G-22-00018.pdf 
  93   Sat May 18 13:13:45 2024 Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, Shahab CalibrationShorter shots with 98 Monow making shorter shots with 98-Mo
3 seconds each
50 MSPS
  
  6   Sun May 12 18:34:54 2024 RuijiuAnalysisHow to use queqiao to transfer tiq dataIf the ssh to lxir131 was disconnected, you
can connect to lxir131 and restart queqiao
program to transfer tiq data from NAS to
 start_OnlineDataAnalysis.jpgqueqiao_rsa.jpg 
  24   Wed May 15 11:45:22 2024 DavidAnalysisLustre TroubleSince around 11:30, Lustre is down, therefore
in https://sparc-daq-02.gsi.de/, the spectrograms
are not being updated. Expected time to recovery
  
  38   Wed May 15 23:04:32 2024 XinliangAnalysisElectron cooler dataThe cooler curve measured during May 14 afternoon.  20240515230302.pngdata_2024_-_sergey.xlsxiso.xlsx 
  74   Fri May 17 19:43:03 2024 Jelena B, Zsolt P., Shahab, DavidAnalysis+ Beam issuesImportant - analysis 
-> we are trying to get PID with a new setting
to see if 98Zr decays with 30s half-life
 beam.png 
  11   Tue May 14 23:22:55 2024 Helmut WeickAcceleratorisochronicity curvesSergey started with a setting with quadrupoles
already changed like in 2021.
Ths was used for the first isochronicity
 isoc_curves_14052024.PNGisoc_curves_14052024.xlsx 
  12   Tue May 14 23:40:03 2024 Helmut, Sergey, YuryAcceleratorpaper log booktwo pages of log book on paper for teh first
setup,
injection into ESR and tuning primary beam
 IMG_20240514_233830.jpgIMG_20240514_233820.jpg 
  33   Wed May 15 19:20:32 2024 Helmut WeickAcceleratorscraper settingAfter the orbit correction on the target straight
section the scrapers work better.
One pair of scrapers works best:
 IMG_20240515_193017_HDR.jpgIMG_20240515_192644.jpgIMG_20240515_182802.jpg 
  34   Wed May 15 19:45:44 2024 Helmut WeickAcceleratorCooler curves after beam shiftAfter the Beam position tuning but before
the scraper tuning two more cooler curves
were taken.
 curce_1.PNGcurce_2.PNGisoc_curves_15052024.xlsx 
  35   Wed May 15 20:17:20 2024 JeroenAcceleratorFewer spills from SIS18 then lost beamApparently fewer spills coming from SIS18,
see attached.
 2024-05-15_20-16-49-990_tcl1064.png2024-05-15_20-18-47-422_tcl1064.png 
  48   Thu May 16 11:20:10 2024 SergeyAcceleratorScreenshot of ESR pattern with 140 repetitions (each is 100 ms)Injection Beam Process: 100ms
Bunching Beam Process: 16ms
Intermediate Beam Process: 100 ms, which
 2024-05-16_11-19-01-545.png 
  Draft   Thu May 16 12:48:58 2024 SergeyAcceleratorTune to 98Zr- stop longer measurements
- change quadrupole and sextupole magnets
- rescale SIS-TE-ESR
  
  52   Thu May 16 15:24:30 2024 Ide, HubbardAcceleratornew Plunger settingplunger motors were set

to +/-390 mm for 245 MHz resonator
  
  55   Thu May 16 16:43:29 2024 YuriAcceleratorHHTHHT sees radiation from us. We stop for 10
min for them to see the speed with which
the radiation level decreases.
  
  Draft   Fri May 17 17:03:39 2024 Helmut, YuryAcceleratorapprox. 96Sr settingOnly 96Sr would yield very few line with only
ions from tiem to time.
So we went a bit lower in Brho 7.69 Tm ->
  
  72   Fri May 17 17:09:26 2024 Helmut, YuryAcceleratorapprox. 96Sr setting (98Zr39+)Only 96Sr would yield very few line with only
ions from time to time.
So we went a bit lower in Brho 7.69 Tm ->
 TEline-ESR-100Mo_98Mo39.lpp 
  77   Fri May 17 21:56:58 2024 Jelena B, Zsolt P.AcceleratorOptimizing settingWe are optimizing setting for 96Sr
start time: 21:52
  
  78   Fri May 17 22:06:05 2024 Jelena B, Zsolt P.AcceleratorESRESR is down  ESR_down.png 
ELOG V3.1.5-fc6679b