Tue May 14 23:46:04 2024, David, Asahi, Shahab, DAQ, Trigger setup  
 |  
GENESYS setup trigger
 
 
screen shot
 |  
   Tue May 14 23:40:03 2024, Helmut, Sergey, Yury, Accelerator, paper log book   
 |  
two pages of log book on paper for teh first setup,
 
injection into ESR and tuning primary beam 100Mo and fragment 98Mo. |  
   Tue May 14 23:22:55 2024, Helmut Weick, Accelerator, isochronicity curves   
 |  
Sergey started with a setting with quadrupoles already changed like in 2021.
 
Ths was used for the first isochronicity curves.
 
It also gave soem, however, not good peak shapes with scrapers closed.
 |  
   Tue May 14 22:13:38 2024, David, Ruijiu, David, Asahi, DAQ, doing some test runs without accelerator trigger 
 |  
| empty shots for test. |  
   Tue May 14 21:41:11 2024, Shahab, Runs, Test Screenshot  
 |  
|   |  
   Tue May 14 19:07:27 2024, Shahab, Runs, Broadband measurement / High Sampling rate 
 |  
Stable beam after a long time:
 
 
 |  
   Tue May 14 15:07:23 2024, Ruijiu, David, Shahab, Xinliang, Zhangmin, Runs, Cooler curve measurement 7x 
 |  
 
 
Cooler curve measurement
 |  
   Sun May 12 18:34:54 2024, Ruijiu, Analysis, How to use queqiao to transfer tiq data   
 |  
If the ssh to lxir131 was disconnected, you can connect to lxir131 and restart queqiao program to transfer tiq data from NAS to luster.
 
 
1. Open a terminal on any GSI linux computer, like the one in the Measurement Room:
 |  
   Thu May  9 15:59:30 2024, Ruijiu Chen, DAQ, Carsten checked the NTCAP system. 
 |  
Exactly this was the question. If several devices fail at the same time and you look for the course you might get suspicious.
 
 
 
Anyhow,
 |  
   Thu May  9 10:01:59 2024, Ruijiu Chen, DAQ, NI crate of NTCAP system can not be started.      
 |  
After moving the NTCAP system from HKR to ESR Messhutte, we tested the system with a signal generator on 16th February and confirmed that it was functioning 
correctly.
 
 |  
   Thu May  9 09:12:59 2024, Dounia, Shahab, DAQ, RSA file sync 
 |  
| RSA file sync with server was up with LXIR131 through to the Lustre. |  
   Mon May  6 12:16:09 2024, Ruijiu Chen, DAQ, ntcap scaler  
 |  
|   |  
   Tue Apr 16 15:35:07 2024, Jan, Collaboration, G-PAC Proposal  
 |  
|   |  
 
 |