HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  nuclear two-photon decay 2024, Page 6 of 6  Not logged in ELOG logo
Entry  Tue May 14 23:46:04 2024, David, Asahi, Shahab, DAQ, Trigger setup 2024-05-14_23-46-56-017.png
GENESYS setup trigger

screen shot
Entry  Tue May 14 23:40:03 2024, Helmut, Sergey, Yury, Accelerator, paper log book IMG_20240514_233830.jpgIMG_20240514_233820.jpg
two pages of log book on paper for teh first setup,
injection into ESR and tuning primary beam 100Mo and fragment 98Mo.
Entry  Tue May 14 23:22:55 2024, Helmut Weick, Accelerator, isochronicity curves isoc_curves_14052024.PNGisoc_curves_14052024.xlsx
Sergey started with a setting with quadrupoles already changed like in 2021.
Ths was used for the first isochronicity curves.
It also gave soem, however, not good peak shapes with scrapers closed.
Entry  Tue May 14 22:13:38 2024, David, Ruijiu, David, Asahi, DAQ, doing some test runs without accelerator trigger 
empty shots for test.
Entry  Tue May 14 21:41:11 2024, Shahab, Runs, Test Screenshot 2024-05-14_21-39-01-112_tcl1048.png
 
Entry  Tue May 14 19:07:27 2024, Shahab, Runs, Broadband measurement / High Sampling rate 
Stable beam after a long time:

Entry  Tue May 14 15:07:23 2024, Ruijiu, David, Shahab, Xinliang, Zhangmin, Runs, Cooler curve measurement 7x


Cooler curve measurement
Entry  Sun May 12 18:34:54 2024, Ruijiu, Analysis, How to use queqiao to transfer tiq data start_OnlineDataAnalysis.jpgqueqiao_rsa.jpg
If the ssh to lxir131 was disconnected, you can connect to lxir131 and restart queqiao program to transfer tiq data from NAS to luster.

1. Open a terminal on any GSI linux computer, like the one in the Measurement Room:
Entry  Thu May 9 15:59:30 2024, Ruijiu Chen, DAQ, Carsten checked the NTCAP system. 
Exactly this was the question. If several devices fail at the same time and you look for the course you might get suspicious.
 
Anyhow,
Entry  Thu May 9 10:01:59 2024, Ruijiu Chen, DAQ, NI crate of NTCAP system can not be started. VID_20240508_113353.mp4dc36252cc5b2262cb6eab099009f16ed.mp4comparision_iq.jpgcomparision_sc.jpgcomparision_sc.png
After moving the NTCAP system from HKR to ESR Messhutte, we tested the system with a signal generator on 16th February and confirmed that it was functioning
correctly.
Entry  Thu May 9 09:12:59 2024, Dounia, Shahab, DAQ, RSA file sync 
RSA file sync with server was up with LXIR131 through to the Lustre.
Entry  Mon May 6 12:16:09 2024, Ruijiu Chen, DAQ, ntcap scaler ScalerSignalMap20240515.pdf
 
Entry  Tue Apr 16 15:35:07 2024, Jan, Collaboration, G-PAC Proposal G-22-00018.pdf
 
ELOG V3.1.5-fc6679b