  13   Tue May 14 23:46:04 2024 David, Asahi, ShahabDAQTrigger setupGENESYS setup trigger

screen shot
 2024-05-14_23-46-56-017.png 
  12   Tue May 14 23:40:03 2024 Helmut, Sergey, YuryAcceleratorpaper log booktwo pages of log book on paper for teh first
setup,
injection into ESR and tuning primary beam
 IMG_20240514_233830.jpgIMG_20240514_233820.jpg 
  11   Tue May 14 23:22:55 2024 Helmut WeickAcceleratorisochronicity curvesSergey started with a setting with quadrupoles
already changed like in 2021.
Ths was used for the first isochronicity
 isoc_curves_14052024.PNGisoc_curves_14052024.xlsx 
  10   Tue May 14 22:13:38 2024 David, Ruijiu, David, AsahiDAQdoing some test runs without accelerator triggerempty shots for test.   
  9   Tue May 14 21:41:11 2024 ShahabRunsTest Screenshot   2024-05-14_21-39-01-112_tcl1048.png 
  8   Tue May 14 19:07:27 2024 ShahabRunsBroadband measurement / High Sampling rateStable beam after a long time:

  
  7   Tue May 14 15:07:23 2024 Ruijiu, David, Shahab, Xinliang, ZhangminRunsCooler curve measurement

Cooler curve measurement
 7x 
  6   Sun May 12 18:34:54 2024 RuijiuAnalysisHow to use queqiao to transfer tiq dataIf the ssh to lxir131 was disconnected, you
can connect to lxir131 and restart queqiao
program to transfer tiq data from NAS to
 start_OnlineDataAnalysis.jpgqueqiao_rsa.jpg 
  5   Thu May 9 15:59:30 2024 Ruijiu ChenDAQCarsten checked the NTCAP system.Exactly this was the question. If several
devices fail at the same time and you look
for the course you might get suspicious.
  
  4   Thu May 9 10:01:59 2024 Ruijiu ChenDAQNI crate of NTCAP system can not be started.After moving the NTCAP system from HKR to
ESR Messhutte, we tested the system with
a signal generator on 16th February and confirmed
 VID_20240508_113353.mp4dc36252cc5b2262cb6eab099009f16ed.mp4comparision_iq.jpgcomparision_sc.jpgcomparision_sc.png 
  3   Thu May 9 09:12:59 2024 Dounia, ShahabDAQRSA file syncRSA file sync with server was up with LXIR131
through to the Lustre.
  
  2   Mon May 6 12:16:09 2024 Ruijiu ChenDAQntcap scaler   ScalerSignalMap20240515.pdf 
  1   Tue Apr 16 15:35:07 2024 JanCollaborationG-PAC Proposal   G-22-00018.pdf 