HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025, Page 3 of 5  Not logged in ELOG logo
Entry  Mon May 12 10:09:21 2025, Christopher, Nils, Accelerator, Intervention TK Chopper - no beam for one hour 
Entry  Mon May 12 14:47:52 2025, Christopher, DAQ, frequency counter BG7TBL_FA-2_Frequency_Counter_Operator_Manual-62519_English_Ed.pdf
Entry  Mon May 12 21:39:49 2025, Zoran, Runs, DR running again with Bi209 
Entry  Mon May 12 22:44:00 2025, Zoran, Runs, 209Bi bunched beam 
Entry  Mon May 12 23:34:39 2025, Carsten, Analysis, Sample DR Spectra DR_209Bi_500mA_newESR_settings.pngDR_209Bi_500mA_newESR_settings_bunched.png
Entry  Tue May 13 00:05:39 2025, Konstantin, Calibration, Cooler HV 
Entry  Tue May 13 00:36:27 2025, Finn, Simon, Konstantin, , DR measurements. Night shift. 
Entry  Tue May 13 00:43:31 2025, Konstantin, General, Connection interrupt 
Entry  Tue May 13 12:59:49 2025, Carsten, Wilfried, Christopher, Nils, General, Setup of ESR for 208Bi 
Entry  Tue May 13 15:34:23 2025, Yuri, Calibration, Particle Identification 
Entry  Tue May 13 17:46:35 2025, Carsten, Runs, Start of DR measurements with 208Bi DR_208Bi_500mA_unbunched(DC).pngDR_208Bi_500mA_unbunched(DC)_true_counts.png
Entry  Tue May 13 21:37:09 2025, Carsten, Runs, DR run with bunched beam / 500 mA /208Bi80+ 
Entry  Wed May 14 00:11:52 2025, Dimitrios, Simon, Runs, Night shift DR Bi-208 Screenshot_2025-05-14_06-33-45.png
Entry  Tue May 13 01:21:16 2025, Konstantin, Simon, Analysis, Longitudinal bunch length Bildschirmfoto_2025-05-13_01-24-40.pngBildschirmfoto_2025-05-13_01-33-06.pngBildschirmfoto_2025-05-13_01-38-19.png
    Reply  Wed May 14 02:19:46 2025, Dimitrios, Simon, Analysis, Longitudinal bunch length Bildschirmfoto_2025-05-14_02-16-42.pngBildschirmfoto_2025-05-14_02-17-58.pngBildschirmfoto_2025-05-14_02-15-05.png
Entry  Wed May 14 06:31:28 2025, Dimitrios, Simon, Runs, DR scans @300mA 
Entry  Wed May 14 08:24:39 2025, Danyal, Nils, Hendrik Day shift, Runs, DR scans @300mA 
Entry  Wed May 14 11:59:39 2025, Nils, Analysis, Current DR spectra 208Bi DR_208Bi_300mA_raw.pngDR_208Bi_300mA_Time_normalized_.png
Entry  Wed May 14 12:43:43 2025, Danyal, Nils, Hendrik Day shift, Runs, DR scans @300mA 
Entry  Wed May 14 19:06:51 2025, Carsten, Runs, Different pattern/ Fixes during the day new runs for 300 mA (increased intensities) DR_208Bi_300mA_optimized_ion_beam.pngDR_208Bi_300mA_optimized_ion_beam_cts.png
Entry  Wed May 14 22:05:54 2025, Rodolfo, Laser, Laser settings 
ELOG V3.1.5-fc6679b