Entry  Sat Jun 21 01:40:31 2025, Carsten, Alex, Anton, Rodolfo, Hiroshi, Accelerator, beam parameters 
The revolution frequency for the measurement condition is: 1.542728 MHz.
The electron cooler voltage is: 104411 V.
Entry  Sat Jun 21 00:52:07 2025, Carsten, Accelerator, Summary of the last days (bunches wiht several isotopes still in ) / frequency of the  
Initially, we has very low SIS beam intensities in the 1e8 region. Setting up ESR wiht Stacking etc. turned out to be extremly tedious for the ESR crew.
Yet, they managed to get stochastic ooling working early on.
Entry  Sat Jun 21 00:23:22 2025, Rodolfo, Laser, Dye Farbstoff_FL27.jpg
I have prepared new (fresh) dye solutions of Fluorescein 27: 2 charges. They are in the Safety Cabinet (Sicherheitsschrank) in the ESR Laser lab
Entry  Fri Jun 20 15:58:21 2025, Wilfried, Konstantin, Simon, Laser, Laser stepwidth 
From previous Bi-Beamtimes, we expect the width of the transition to be >50GHz (FWHM). The current step width is 0.002nm which corresponds to 8GHz, so the
laser would be in resonance for 6 steps.
We should aim for at least 5 steps in resonance.
Entry  Fri Jun 20 11:25:32 2025, Julien, Kristian, Konstantin, Laser, Automated laser scans  
In contrast to entry [URL=https://elog.gsi.de/esr/E0052_2025/12]E12[/URL], the cabling for the automated start of the laser scan is now connected to [B]IO3
of sddsc221[/B].
Entry  Fri Jun 20 06:37:51 2025, Konstantin, Accelerator, Position of contaminants 
I checked the positions of the contaminants. Therefore, I drove the scrapers and observed the signal at the Schottky detector

While the vertical positions are identical for all scrapers, the horizontal positions deviate due to the dispersion in the cooler section
Entry  Wed Jun 18 20:24:01 2025, Carsten, Shahab, Ragandeep, Danyal et al. (the dayshift) and ESR crew, Accelerator, 229Th89+ identification 245_MHz_Schottky_229Th89.jpg
We believe to have identified the 237U92+ and the 229Th89+ peaks. 

Using the Schottky resonator at about 244 MHz and taking the 123rd harmonic: 
Entry  Wed Jun 18 19:05:28 2025, Carlo, Zac, Shahab, Ragan, Analysis, PID with rionid Schermata_2025-06-18_alle_19.03.04.pngE142_TEline-ESR_229Th.lppRSA01-2025.06.18.18.06.02.162.tiq_spectrum.npzSchermata_2025-06-18_alle_19.32.53.png
For PID with rionid we used: 
- LISE file from last year (attached.
- .npz file from 410 RSA (attached).
Entry  Wed Jun 18 14:01:40 2025, Julien, Konstantin, Stefan, Rima, , Ion bunch on PMTs Bildschirmfoto_bunch_on_PMT_2025-06-18_14-11-44.png
Apparentlty did not work yesterday evening (no signal), but looks fine now (see attachment)
Entry  Wed Jun 18 11:44:15 2025, Julien, Konstantin, Stefan, Rima, , Jitter CFD 
Pulses on photodiodes in entry 20 

1. seem wide, so we also looked at qswitch signal; also seemes wide.
Entry  Wed Jun 18 08:07:17 2025, Julien, Konstantin, Laser, new FCU Calibration 2025_06_18_FCU_Cal_Table.JPG2025_06_18_FCU_Cal_Plot.JPG
UV power was not stable but dropping from ~18 mW to 13 mW after opening COBRA shutters.
New calibration of frequency conversion unit:
Entry  Wed Jun 18 07:59:00 2025, Julien, Konstantin, Laser, Phase-offset IMG_3889.jpgIMG_3888.jpgIMG_3891.jpgIMG_3892.jpg
We recognized that the output power of the pump laser was instable when externally triggered with 200kHz (stand-bye frequency of ESR). Therefore, we changed
the coarse timing offset of the pockels cell trigger compared to the flash lamp pulse from 215µs to 219.9µs. 
Thereby, the output power increased from ~600mJ to 620mJ, and the PTP stability improved from 15% to 10%. The RMS stability improved from 2% to 1.2 %.
Entry  Wed Jun 18 03:12:25 2025, Rodolfo, Laser, Beam Stabilization MRC-Settings_2025_06-18.JPG
The laser beam pointing has changed, even thought the MRC settings are the same as given in Entry 5 (this elog). This could be caused by a droping of the
laser output energy which is now 13,8 mJ @275 nm 
Entry  Wed Jun 18 01:58:02 2025, Esther, Alexis, Anton, Rodolfo, Carsten, Accelerator, No Bunched Beam Bildschirmfoto_PD_PMTSouth_2025-06-18_1.png
The Bunching is not set properly. We do not see the ion bunch with the Photomultiplier.
Entry  Wed Jun 18 00:56:28 2025, Carsten, Rodolfo, Anton, Alexis, Esther, , beam overlap with t-scrapers 
When testing the overlap between laser and ion beam we observed the following positions:

[TABLE border="1"]
Entry  Wed Jun 18 00:33:56 2025, Esther, Alexis, Anton, Rodolfo, Carsten, DAQ, R4l-41 
We have some issues with the RIO computer R4l-41 (DAQ1). We had to switch off completely twice. Only then it reacted properly. Maybe a problem with the
network at about 00:00 o'clock? 
Entry  Tue Jun 17 19:25:30 2025, Rodolfo, Accelerator, T-Scrapers in E-Cooler Scrapereinstellung_am_E-Kühler.pdf
Here are the instructions to drive the T-Scrapers inside the ESR Electron Cooler

[LIST]
Entry  Tue Jun 17 16:33:16 2025, Carsten, Simon, DAQ, Gate Q-swtich 
The gate generator of the Q-switch signal for the Vuprom TDC was set to 10ms.
Entry  Mon Jun 16 22:27:01 2025, Carsten, Simon, DAQ, Thresholds  
We also adjusted the thresholds for the mesytic.
Doing that, we noticed that one of the trafos is broken (5th row, middle).
Entry  Mon Jun 16 21:47:23 2025, Carsten, Wilfried, Simon , Detectors, New threshold values for PMTs 
We adjusted the thresholds for the PMTs and increased the voltage of PMT middle to 2.7kV

[TABLE border="1"]