HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025, Page 4 of 4  Not logged in ELOG logo
Entry  Sun Jun 22 21:36:48 2025, Carsten, Finn, Zac, Esther, Runs, First laser scans 

[B] Scan parameters:[/B]
[TABLE border="1"]
Entry  Wed Jun 25 05:53:54 2025, Rodolfo, Laser, FCU 
Cobra's FCU was recalibrated. Table saved as FCU_547-554_RS_2024-06-25.fcu.
Entry  Fri Jun 27 06:13:02 2025, Esther, Konstantin, Runs, Early shift - data taking 
[B]Notes:[/B] 
1. TE slits at -10 and +10
2. SIS intensity unstable until about 9:00 after that it became much more stable
Entry  Sat Jun 21 00:23:22 2025, Rodolfo, Laser, Dye Farbstoff_FL27.jpg
I have prepared new (fresh) dye solutions of Fluorescein 27: 2 charges. They are in the Safety Cabinet (Sicherheitsschrank) in the ESR Laser lab
Entry  Wed Jun 11 16:44:39 2025, Carsten, Jan, Detectors, Detector voltages and thresholds for DAQ2 (Mesycontrol) Mesytec_CFD_Settings_2025-06-11_17-17-33.png
Voltages (2650v) for the small band 9423 is ok. Signals are nicely separated from background, thresholds can be easily set.
For the broadband 9422 the voltage is by far too low. Signals and BG are barely separated. 
Increased voltage from 1500V to 1750V (according to datasheet Vmax = 2500V, 1500 V is the min voltage for gain 1e6...).
Entry  Tue Jun 24 22:24:36 2025, Carsten, Finn, Hiroshi, Esther, Rodolfo, Runs, Data taking (night shift 24.06.) 

[B] Scan parameters:[/B]
[TABLE border="1"]
Entry  Wed Jun 11 17:33:04 2025, Carsten, Jan, DAQ, DAQ2 - new computer , new directories (lxg0155 doesn't work reliably) 
LXG0155 (used in form er beamtimes) crashes and hangs and hangs eventually. 

Lgx0155 is shut-down and is replaced by [B]lxg3113[/B].
Entry  Fri Jun 13 18:14:02 2025, Konstantin, Carsten, DAQ, DAQ Folder 
Dryrun of DAQs. Folders of the data are:

Entry  Mon Jun 23 01:01:17 2025, Carsten, Detectors, CAEN PMT Power supply 
Since yesterday, channel 0 of the CAEN PS is dead (no voltage even without cable).
Changed detector south to channel 3.
Entry  Wed Jun 18 03:12:25 2025, Rodolfo, Laser, Beam Stabilization MRC-Settings_2025_06-18.JPG
The laser beam pointing has changed, even thought the MRC settings are the same as given in Entry 5 (this elog). This could be caused by a droping of the
laser output energy which is now 13,8 mJ @275 nm 
Entry  Sun Jun 22 22:29:04 2025, Carsten, Accelerator, Backup copy of present accelerator settings - don't use if you don't know what you are doing 
# Version: 1.3
# Comment: ParamModi Export at 2025-06-22T22:28:05.633712878+02:00[Europe/Berlin]
# Context: ESR_25_12_THORIUM_20June_v3.C1
Entry  Fri Jun 20 11:25:32 2025, Julien, Kristian, Konstantin, Laser, Automated laser scans  
In contrast to entry [URL=https://elog.gsi.de/esr/E0052_2025/12]E12[/URL], the cabling for the automated start of the laser scan is now connected to [B]IO3
of sddsc221[/B].
Entry  Wed Jun 18 20:24:01 2025, Carsten, Shahab, Ragandeep, Danyal et al. (the dayshift) and ESR crew, Accelerator, 229Th89+ identification 245_MHz_Schottky_229Th89.jpg
We believe to have identified the 237U92+ and the 229Th89+ peaks. 

Using the Schottky resonator at about 244 MHz and taking the 123rd harmonic: 
ELOG V3.1.5-fc6679b