Entry  Thu Jun 26 22:51:04 2025, Hendrik, Finn, Runs, Nightshift data runs 
After the scan at 22:04 teh FCU new was new calibrated. For this MEdusa was stopped and reopened in the laser lab. This stops the Labview server, and as
a consequence the the connection to the MBS was lsot. Then, MBS needs to be restarted and the online data is cleared. Such an intervention should avoided
as good as possible.
Entry  Sun Jun 29 03:03:56 2025, Nadine, Finn, Runs, Night shift runs with laser 
around 22:00 water cooling circuit failure of ESR electron cooler--> ~1h downtime
Wavemeter frequently overexposed around 549,3nm; other wavelengths are fine
Entry  Sun Jun 29 22:06:19 2025, Carsten, Alex, Hendrik, Runs, Night shift 29.06. 
[TABLE border="1"]
Time | Part. Det. Int | SIS-intensity| accumulations in ESR |  cooler-HV PTB K250 |  cooler-HV PTB red | cooler-HV orange | LMD-DAQ1 Files | LMD-DAQ2 Files
| scan range(nm) | number of positions | dwell time (laser shots) | n loops | checked laser position | comments |-
Entry  Mon Jun 16 21:47:23 2025, Carsten, Wilfried, Simon , Detectors, New threshold values for PMTs 
We adjusted the thresholds for the PMTs and increased the voltage of PMT middle to 2.7kV

[TABLE border="1"]
Entry  Thu Jun 12 16:27:45 2025, Carsten, DAQ, NTCAP directory 
On the NTCAP the directory is changed to 
Q:/E0052
Entry  Sat Jun 28 06:29:58 2025, Stefan, Simon, Konstantin, Runs, Morning shift 28.06. 
6:30  Problem with ion source, on-call service is called
7:30 There is a short in the ion source and it needs to be changed. Expected down time about 2h
10:30 Ion source was successfully changed, but while ramping up the source a power supply failed. Next on-call service is on their way to GSI. 
Entry  Sun Jun 29 06:11:49 2025, Stefan, Konstantin, Runs, Morning Shift 29.06. 


[TABLE border="1"]
Entry  Mon Jun 2 16:36:57 2025, Carsten, Detectors, Mesycontrol MSCF16-F-V.pdf
ssh -Y litv-exp@x86l-204
'mesycontrol'
Entry  Fri Jun 6 14:27:10 2025, Rodolfo, Konstantin, Laser, MRC Beam Stabilization Presettings MRC-Settings_2025_06-06.JPGAFG_Settings_Thorium_2025-06-06.jpgMRC-Controller_Settings_Thorium_2025-06-06.jpg
These are the settings for the Beam Stabilization from MRC. 

Laser-beam energy ca. 18 mJ @ 275 nm
Entry  Sat Jun 21 08:48:16 2025, Arya, Julien, Wilfried, Accelerator, Low 229Th particle numbers and 229Th lifetime in ring Bildschirmfoto_timing_full_2025-06-21_09-30-46.pngBildschirmfoto_timing_end_of_manipulation_2025-06-21_09-36-24.pngBildschirmfoto_timing_full_60_2025-06-21_11-25-51.pngBildschirmfoto_PDSouth_lifetimes_2025-06-21_11-26-43.png
With reference to entry 37 Laser timing:

- at last 30 injections accumulation: 10k counts on particle detector (accumulated during manipulation until it saturates, e.g. no more Th in ESR)
Entry  Sun Jun 29 18:04:11 2025, Carsten, Simon, Runs, Late shift 29.06. 
[TABLE border="1"]
Time | Part. Det. Int | SIS-intensity| accumulations in ESR |  cooler-HV PTB K250 |  cooler-HV PTB red | cooler-HV orange | LMD-DAQ1 Files | LMD-DAQ2 Files
| scan range(nm) | number of positions | dwell time (laser shots) | n loops | checked laser position | comments |-
Entry  Thu Jun 26 19:01:46 2025, Carsten, Jan, Simon, Runs, Late shift 26.06. 

[B] Scan parameters:[/B]
[TABLE border="1"]
Entry  Fri Jun 27 06:55:45 2025, Esther. Konstantin, Laser, Laser-ion overlap 2025-06-27_06-52-01-807.png2025-06-27_07-12-27-135.png2025-06-27_07-32-28-599.png2025-06-27_07-51-52-620.png
We cross-checked the laser-ion superposition by using the T-scrapers. We did it only after the scans in order to do not change the duty cycle by much. Attachements
are in the order of the measurements compiled in the table.
Entry  Fri Jun 20 15:58:21 2025, Wilfried, Konstantin, Simon, Laser, Laser stepwidth 
From previous Bi-Beamtimes, we expect the width of the transition to be >50GHz (FWHM). The current step width is 0.002nm which corresponds to 8GHz, so the
laser would be in resonance for 6 steps.
We should aim for at least 5 steps in resonance.
Entry  Sat Jun 21 02:32:24 2025, Alex, Anton, Rodolfo, Hiroshi, Carsten, Laser, Laser scanning setting 
This is the initial scanning range
[LIST]
[*] 3 Loops
Entry  Sat Jun 21 07:28:35 2025, Arya, Julien, Wilfried, Laser, Laser Timing Bildschirmfoto_IonBunch_PDs_2025-06-21.pngBildschirmfoto_rough_timing_2025-06-21_07-22-59.pngBildschirmfoto_timingcorrected_2025-06-21_08-21-53.pngBildschirmfoto_timing_final_2025-06-21_08-46-18.png
We roughly adjusted the timing based on attachment 1, for ions to be in center of electron cooler (east arc), corrected for PMTs being 2.5m closer to the
north on the west arc
then did a new 30 injection accumulation (10.8k counts on particle detector) and readjusted the timing to fine tune this
Entry  Wed Jun 18 11:44:15 2025, Julien, Konstantin, Stefan, Rima, , Jitter CFD 
Pulses on photodiodes in entry 20 

1. seem wide, so we also looked at qswitch signal; also seemes wide.
Entry  Wed Jun 18 14:01:40 2025, Julien, Konstantin, Stefan, Rima, , Ion bunch on PMTs Bildschirmfoto_bunch_on_PMT_2025-06-18_14-11-44.png
Apparentlty did not work yesterday evening (no signal), but looks fine now (see attachment)
Entry  Tue Jun 17 16:33:16 2025, Carsten, Simon, DAQ, Gate Q-swtich 
The gate generator of the Q-switch signal for the Vuprom TDC was set to 10ms.
Entry  Mon Jun 23 10:52:34 2025, Julian, Lukas, Zsolt, Nadine, Konstantin, Laser, Frequency conversion unit 
We exchanged the old BBO of the Cobra's FCU with a new one. The output power of the Cobra was around 120mJ. In the end, we achieved a UV power of about
21mJ. In addition, we optimized the fiber-coupling to the wavemeter. 