HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025, Page 4 of 4  Not logged in ELOG logo
ID Date Authordown Category Subject Text Attachments
  32   Sat Jun 21 00:52:07 2025 CarstenAcceleratorSummary of the last days (bunches wiht several isotopes still in ) / frequency of the Initially, we has very low SIS beam intensities
in the 1e8 region. Setting up ESR wiht Stacking
etc. turned out to be extremly tedious for
  
  47   Sun Jun 22 22:29:04 2025 CarstenAcceleratorBackup copy of present accelerator settings - don't use if you don't know what you are doing# Version: 1.3
# Comment: ParamModi Export at 2025-06-22T22:28:05.633712878+02:00[Europe/Berlin]
# Context: ESR_25_12_THORIUM_20June_v3.C1
  
  Draft   Sun Jun 22 23:48:35 2025 CarstenAcceleratorSummary of todays settings and tests Scraping, beam intesnity optimizations and
nuching were set up and optimized during
the day.
  
  50   Mon Jun 23 01:01:17 2025 CarstenDetectorsCAEN PMT Power supplySince yesterday, channel 0 of the CAEN PS
is dead (no voltage even without cable).
Changed detector south to channel 3.
  
  55   Tue Jun 24 12:25:34 2025 CarstenDetectorsPMT behaviour - noise / PMT voltages / CFD Threshholds / CAEN Power supply (broken channel resetted)In position North there is still the "old"
9423B PMT that draws quite some current.
On this detector threre is also some quite
  
  26   Wed Jun 18 19:05:28 2025 Carlo, Zac, Shahab, RaganAnalysisPID with rionidFor PID with rionid we used: 
- LISE file from last year (attached.
- .npz file from 410 RSA (attached).
 Schermata_2025-06-18_alle_19.03.04.pngE142_TEline-ESR_229Th.lppRSA01-2025.06.18.18.06.02.162.tiq_spectrum.npzSchermata_2025-06-18_alle_19.32.53.png 
  37   Sat Jun 21 07:28:35 2025 Arya, Julien, WilfriedLaserLaser TimingWe roughly adjusted the timing based on attachment
1, for ions to be in center of electron cooler
(east arc), corrected for PMTs being 2.5m
 Bildschirmfoto_IonBunch_PDs_2025-06-21.pngBildschirmfoto_rough_timing_2025-06-21_07-22-59.pngBildschirmfoto_timingcorrected_2025-06-21_08-21-53.pngBildschirmfoto_timing_final_2025-06-21_08-46-18.png 
  38   Sat Jun 21 08:48:16 2025 Arya, Julien, WilfriedAcceleratorLow 229Th particle numbers and 229Th lifetime in ringWith reference to entry 37 Laser timing:

- at last 30 injections accumulation: 10k
 Bildschirmfoto_timing_full_2025-06-21_09-30-46.pngBildschirmfoto_timing_end_of_manipulation_2025-06-21_09-36-24.pngBildschirmfoto_timing_full_60_2025-06-21_11-25-51.pngBildschirmfoto_PDSouth_lifetimes_2025-06-21_11-26-43.png 
  39   Sat Jun 21 11:42:50 2025 Arya, Julien, WilfriedGeneralTest laser scanTest scan to see whether laser spot is moving
while scanning
  
  44   Sun Jun 22 11:31:59 2025 Arya, Carsten, Julien, KonstantinGeneralSummary morning shift1. UNILAC running again, so we resumed the
beam tuning wherre we stopped yesterday at
14:00
  
  69   Fri Jun 27 22:14:35 2025 Anton, Finn, CarstenRunsRuns night shift 27.06. 28.0622:10  SIS Trafo GS09DT scale was changed
to 4e8 (not just the lassie monitor)
23:50 Ausfall ESR: GE01 KP01 bis KP05 und
  
  34   Sat Jun 21 02:32:24 2025 Alex, Anton, Rodolfo, Hiroshi, CarstenLaserLaser scanning settingThis is the initial scanning range
[LIST]
[*] 3 Loops
  
  36   Sat Jun 21 03:13:02 2025 Alex, Anton, Rodolfo, HiroshiDetectorsPart Det SouthBunch signal on Particle Detector South. On
the 
 Bildschirmfoto_PartDetSouth_2025-06-21.png 
ELOG V3.1.5-fc6679b