HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
E0203_E0018
laser spectroscopy on Be-like Kr, Page 1 of 6
Not logged in
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
Simulations
Accelerator
103 Entries
Goto page 1,
2
,
3
,
4
,
5
,
6
Next
All
Mon Mar 3 12:47:08 2025, Tamina, Rudolfo, Volker, Danyal, Florian, Calibration, Änderung der Ionenenergie
Tue Mar 4 01:05:33 2025, Sebastian, Benedikt, Denise, Runs, whole range scan @2nd ion energy) without shift
Fri Dec 13 13:44:13 2024, Sebastian, Runs, test
Thu Feb 6 11:03:26 2025, Danyal, General, pressures in laser window sections NW and SW
Thu Feb 27 11:19:55 2025, Danyal, Accelerator, pictures of the ion beam from 26.02.2025
Mon Mar 3 15:40:39 2025, Tamina, Danyal, Calibration, necessary tests on 03.03.2025 before 08:00 AM
Tue Feb 11 13:08:32 2025, Danyal, Accelerator, limited access to ESR this week
Tue Feb 11 10:30:21 2025, Danyal, General, laser valves are open
Mon Mar 3 13:15:51 2025, Tamina, Florian, Volker, Danyal, Calibration, frequencies
Mon Mar 3 01:53:18 2025, Sebastian, Denise, Benedikt, Runs, extending the lower wavelength range (no shift)
Sun Mar 2 23:05:16 2025, *Jens, Reinhold, Danyal, DAQ, extended normal scan range (no shift): 257.6750 - 257.8022 nm
Mon Mar 3 16:19:18 2025, Konstantin, DAQ, changed shutter timing - effective from 03.03.2025 @ 16:24 !
Mon Mar 3 16:27:13 2025, Danyal, Accelerator, bunch length @ new ion energy
Tue Feb 11 10:32:01 2025, Danyal, General, access to ESR
Tue Feb 11 10:35:38 2025, Danyal, Detectors, XUV detector
Tue Mar 4 07:07:11 2025, Sebastian, Benedikt, Denise, Detectors, XUV Detektor Laseruntergrund
Tue Mar 4 08:46:43 2025, , General, Wir sagen Daaaankeeeschooooeeeeeeeen
Sat Mar 1 09:49:06 2025, Tamina, Florian, Konstantin, Volker, Calibration, Vorbereitung Messung Verschiebung Laserpulse zum Bunch
Fri Feb 14 16:41:54 2025, Sebastian , General, Verkabelung PD ESR
Fri Feb 28 20:44:04 2025, Konstantin, DAQ, Updated Channel list
Goto page 1,
2
,
3
,
4
,
5
,
6
Next
All
ELOG V3.1.5-fc6679b