HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 15 of 17  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject Text Attachments
  189   Sat Apr 5 11:04:22 2025 Hannes, CaglaGeneralBeam backThe beam is back as before since 11:02.   
  191   Sat Apr 5 12:03:23 2025 Hannes, CaglaGeneralLassie screenshots   2025-04-05_12-02-57-892.png2025-04-05_12-02-51-503.png2025-04-05_12-03-22-319.png2025-04-05_12-03-41-597.png 
  193   Sat Apr 5 12:59:08 2025 Hannes, CaglaGeneralLassie screenshots   2025-04-05_12-59-26-722.png2025-04-05_12-59-07-111.png2025-04-05_13-00-24-333.png2025-04-05_13-00-15-781.png 
  194   Sat Apr 5 14:02:54 2025 Hannes, CaglaGeneralLassie screenshots   2025-04-05_14-03-09-807.png2025-04-05_14-02-50-834.png2025-04-05_14-03-58-456.png2025-04-05_14-03-52-527.png 
  197   Sat Apr 5 15:01:03 2025 Hannes, CaglaGeneralLassie screenshots   2025-04-05_15-01-39-374.png2025-04-05_15-01-22-352.png2025-04-05_15-01-59-451.png2025-04-05_15-02-06-386.png 
  11   Mon Mar 31 20:42:38 2025 H. Weick, S. LitvinovAcceleratorfragment setting, E-SIS~ 20:00 changed E-SIS to 524.0 MeV/u to get
194Pb at the Brho of the primary beam before
(=7.2008 Tm).
  
  20   Tue Apr 1 02:37:28 2025 H. Weick, S. LitvinovAcceleratorIsoc-setting +scrapersFirst a setting with orbit bump for injection
on central orbit was tried.
- quadrupoles tuned and scrapers optimized
 IMG_20250401_013626.jpgIMG_20250401_013636.jpgIMG_20250401_013646.jpgIMG_20250401_023358.jpg 
  160   Fri Apr 4 17:04:39 2025 H. Weick, S. LitvinovAcceleratorslits after target, Bio_REM alarmA Bio-REM detector on the roof of ESR caused
an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we
 primary_beam_on_TE4_slits.JPG 
  161   Fri Apr 4 17:10:35 2025 H. Weick, S. LitvinovAcceleratorESR scraper settingthe new scraper setting for good isochronicity
but still acceptable intensity losses is:
Done at ~ 15:00 today.
  
  3   Thu Mar 27 17:20:40 2025 Esther, Yue, Carlo, Zac, ShahabDetectorsSetup GenesysWe set up the Genesys. Channel map:

tr0:
 2025-03-27_17-19-33-724.png 
  323   Wed Apr 9 06:47:51 2025 Esther, NikosGeneralBrief beam interruptionsThere was no beam from SIS between about 06:28
and 06:39.
 2025-04-09_06-44-13-080_tcl1064.png2025-04-09_06-44-10-755_tcl1064.tdf 
  10   Mon Mar 31 17:46:21 2025 EstherDAQNTCAP scaler assignmentThe setup contains two NI-6612 I/O cards with
BNC-2121 connector accessories that provide
eight inputs each for TTL scaler signals.
  
  54   Tue Apr 1 22:53:59 2025 EstherGeneralLassie exports   2025-04-01_22-53-17-548_tcl1146.png2025-04-01_22-53-21-680_tcl1146.tdf 
  329   Wed Apr 9 11:18:27 2025 EstherDAQNTCAP off, RSA triggers disconnectedThe NTCAP computer and crate are switched
off.
The triggers are disconnected from the RSAs,
  
  166   Fri Apr 4 18:38:52 2025 Dima, Zac, Sid, Kanika, Ragan, Shahab, BeatrizDAQnew file name and settings for 245 MHznew settings:
1.8 seconds recording on 245 MHz on RSA02
 IMG_4981.JPGIMG_4982.JPG 
  210   Sat Apr 5 18:24:09 2025 Dima, Zac, ShahabDAQRSAs stop again, due to missesRSAs had to stop because the cycle of 1.8
came too often, both analyzers could not
catch up with the file transfer.
 IMG_4991.JPGIMG_4992.JPG 
  60   Wed Apr 2 01:46:52 2025 Chris, Carlo, ZacGeneralBeam lossHKR just called to say a power supply to the
SIS18 extraction kicker has failed.
The service person has been called and is
  
  64   Wed Apr 2 05:48:31 2025 Chris, Carlo, ZacGeneralBeam returnedBeam was returned to the ESR at 05:11.

HKR said there had been some problem with
  
  61   Wed Apr 2 02:51:31 2025 Carlo, Zac, ChrisDAQBeam is back02:44 beam is back   
  62   Wed Apr 2 04:33:57 2025 Carlo, Zac, ChrisDAQScreenshots Lassiescreenshots of Lassie  2025-04-02_04-28-59-944_tcl1064.png2025-04-02_03-38-54-877_tcl1064.png 
ELOG V3.1.5-fc6679b