ID |
Date |
Author |
Category |
Subject |
Text |
 |
189
|
Sat Apr 5 11:04:22 2025 |
Hannes, Cagla | General | Beam back | The beam is back as before since 11:02. |
|
191
|
Sat Apr 5 12:03:23 2025 |
Hannes, Cagla | General | Lassie screenshots | |
   |
193
|
Sat Apr 5 12:59:08 2025 |
Hannes, Cagla | General | Lassie screenshots | |
   |
194
|
Sat Apr 5 14:02:54 2025 |
Hannes, Cagla | General | Lassie screenshots | |
   |
197
|
Sat Apr 5 15:01:03 2025 |
Hannes, Cagla | General | Lassie screenshots | |
   |
11
|
Mon Mar 31 20:42:38 2025 |
H. Weick, S. Litvinov | Accelerator | fragment setting, E-SIS | ~ 20:00 changed E-SIS to 524.0 MeV/u to get
194Pb at the Brho of the primary beam before
(=7.2008 Tm).
|
|
20
|
Tue Apr 1 02:37:28 2025 |
H. Weick, S. Litvinov | Accelerator | Isoc-setting +scrapers | First a setting with orbit bump for injection
on central orbit was tried.
- quadrupoles tuned and scrapers optimized
|
   |
160
|
Fri Apr 4 17:04:39 2025 |
H. Weick, S. Litvinov | Accelerator | slits after target, Bio_REM alarm | A Bio-REM detector on the roof of ESR caused
an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we |
|
161
|
Fri Apr 4 17:10:35 2025 |
H. Weick, S. Litvinov | Accelerator | ESR scraper setting | the new scraper setting for good isochronicity
but still acceptable intensity losses is:
Done at ~ 15:00 today.
|
|
3
|
Thu Mar 27 17:20:40 2025 |
Esther, Yue, Carlo, Zac, Shahab | Detectors | Setup Genesys | We set up the Genesys. Channel map:
tr0:
|
|
323
|
Wed Apr 9 06:47:51 2025 |
Esther, Nikos | General | Brief beam interruptions | There was no beam from SIS between about 06:28
and 06:39.
|
 |
10
|
Mon Mar 31 17:46:21 2025 |
Esther | DAQ | NTCAP scaler assignment | The setup contains two NI-6612 I/O cards with
BNC-2121 connector accessories that provide
eight inputs each for TTL scaler signals. |
|
54
|
Tue Apr 1 22:53:59 2025 |
Esther | General | Lassie exports | |
 |
329
|
Wed Apr 9 11:18:27 2025 |
Esther | DAQ | NTCAP off, RSA triggers disconnected | The NTCAP computer and crate are switched
off.
The triggers are disconnected from the RSAs, |
|
166
|
Fri Apr 4 18:38:52 2025 |
Dima, Zac, Sid, Kanika, Ragan, Shahab, Beatriz | DAQ | new file name and settings for 245 MHz | new settings:
1.8 seconds recording on 245 MHz on RSA02
|
 |
210
|
Sat Apr 5 18:24:09 2025 |
Dima, Zac, Shahab | DAQ | RSAs stop again, due to misses | RSAs had to stop because the cycle of 1.8
came too often, both analyzers could not
catch up with the file transfer.
|
 |
60
|
Wed Apr 2 01:46:52 2025 |
Chris, Carlo, Zac | General | Beam loss | HKR just called to say a power supply to the
SIS18 extraction kicker has failed.
The service person has been called and is |
|
64
|
Wed Apr 2 05:48:31 2025 |
Chris, Carlo, Zac | General | Beam returned | Beam was returned to the ESR at 05:11.
HKR said there had been some problem with |
|
61
|
Wed Apr 2 02:51:31 2025 |
Carlo, Zac, Chris | DAQ | Beam is back | 02:44 beam is back |
|
62
|
Wed Apr 2 04:33:57 2025 |
Carlo, Zac, Chris | DAQ | Screenshots Lassie | screenshots of Lassie |
 |
|