HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 17 of 17  Not logged in ELOG logo
ID Date Author Categorydown Subject Text Attachments
  116   Thu Apr 3 09:43:14 2025 AllAcceleratorStop 194Pb, switch to 208Pb82+The repair of SIS electron cooler power supplies

In the meantime we received a few injections
  
  134   Thu Apr 3 23:23:20 2025 Zhang Min, Zhou XuAcceleratorBeam injection changeThe SIS operator says that FRS doesn't need
beam now, ESR will receive the full SIS beam
extraction every 3 secs overnight. All the
 2025-04-03_23-21-03-095.png 
  160   Fri Apr 4 17:04:39 2025 H. Weick, S. LitvinovAcceleratorslits after target, Bio_REM alarmA Bio-REM detector on the roof of ESR caused
an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we
 primary_beam_on_TE4_slits.JPG 
  161   Fri Apr 4 17:10:35 2025 H. Weick, S. LitvinovAcceleratorESR scraper settingthe new scraper setting for good isochronicity
but still acceptable intensity losses is:
Done at ~ 15:00 today.
  
  240   Sun Apr 6 18:36:56 2025 Shahab, Moriguchi, TakaAcceleratorBeam stoppedBeam stopped due to device trouble.   
  242   Sun Apr 6 18:48:36 2025 Shahab, Moriguchi, TakaAcceleratorBeam backBeam is back now.   
  243   Sun Apr 6 19:23:09 2025 Shahab, Moriguchi, TakaAcceleratorBeam sharingBeam sharing with FRS is now 1 to 1.   
  245   Sun Apr 6 20:13:03 2025 Taka, MoriguchiAcceleratorBeam sharingNow we have every injection.   
  248   Sun Apr 6 21:29:37 2025 Taka, MoriguchiAcceleratorBeam sharingagain, ESR : FRS = 1 : 1   
  262   Mon Apr 7 07:09:01 2025 Jelena, GuyAcceleratorBeam interruption, FRSBeam is gone since 7:02. Control room is notified.
Beam is back since 7:14. FRS started taking
spills.
  
ELOG V3.1.5-fc6679b