  masses & isomeres 2025, Page 17 of 17  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Categorydown Subject
  116   Thu Apr 3 09:43:14 2025 AllAcceleratorStop 194Pb, switch to 208Pb82+
The repair of SIS electron cooler power supplies

In the meantime we received a few injections and confirmed that 194Pb setting is still as it was before entering into the ESR

Now we change to 208Pb82+ to do several ESR accelerator tests

Esis = 517 MeV/u
Change the beamline to 208 Pb 82+ and the ESR to 208 b 82+ and NO other changes
  134   Thu Apr 3 23:23:20 2025 Zhang Min, Zhou XuAcceleratorBeam injection change
The SIS operator says that FRS doesn't need beam now, ESR will receive the full SIS beam extraction every 3 secs overnight. All the secondary beams are injected into ESR from now on.
Attachment 1: 2025-04-03_23-21-03-095.png
2025-04-03_23-21-03-095.png
  160   Fri Apr 4 17:04:39 2025 H. Weick, S. LitvinovAcceleratorslits after target, Bio_REM alarm
A Bio-REM detector on the roof of ESR caused an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we avoid it by catching the primary beam at TE4 slits.
The distribution on current grids looks liek in the LISE simulation, we cut at 5mm.
The beam come sin three charge states tehouter ones 82+, 81+ anyway do not make it to ESR, we need to cut also the 80+ at least half.
Then the dose rate on ESR roof is much lower 0.8 uSv/h -> 0.2 uSv/h.
Attachment 1: primary_beam_on_TE4_slits.JPG
primary_beam_on_TE4_slits.JPG
  161   Fri Apr 4 17:10:35 2025 H. Weick, S. LitvinovAcceleratorESR scraper setting
the new scraper setting for good isochronicity but still acceptable intensity losses is:
Done at ~ 15:00 today.
GEEXDS1HA (outside)          =  -8 mm
GEEXDS1HG (ToF-det-aperture) =  20.5 mm
GE01DS3HG                    = -84.2 mm  (fully open is -130 mm)
in addition, a detector pocket is in GE01DD2IG = 1.7 mm
  240   Sun Apr 6 18:36:56 2025 Shahab, Moriguchi, TakaAcceleratorBeam stopped
Beam stopped due to device trouble.
  242   Sun Apr 6 18:48:36 2025 Shahab, Moriguchi, TakaAcceleratorBeam back
Beam is back now.
  243   Sun Apr 6 19:23:09 2025 Shahab, Moriguchi, TakaAcceleratorBeam sharing
Beam sharing with FRS is now 1 to 1.
  245   Sun Apr 6 20:13:03 2025 Taka, MoriguchiAcceleratorBeam sharing
Now we have every injection.
  248   Sun Apr 6 21:29:37 2025 Taka, MoriguchiAcceleratorBeam sharing
again, ESR : FRS = 1 : 1
  262   Mon Apr 7 07:09:01 2025 Jelena, GuyAcceleratorBeam interruption, FRS
Beam is gone since 7:02. Control room is notified. Beam is back since 7:14. FRS started taking spills.