HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025, Page 6 of 17  Not logged in ELOG logo
Entry  Sun Apr 6 09:51:30 2025, Ragan, Burcu, Gregor, General, Lassie screenshot 2025-04-06_09-49-32-886.png2025-04-06_09-49-24-830.png2025-04-06_09-49-09-640.png2025-04-06_09-48-49-107.png
 
Entry  Sun Apr 6 08:53:29 2025, Ragan, Gregor, General, Lassie screenshots 2025-04-06_08-52-31-077.png2025-04-06_08-52-14-174.png2025-04-06_08-52-58-037.png2025-04-06_08-52-48-749.png
 
Entry  Sun Apr 6 07:54:32 2025, Ragan, Gregor, General, Lassie screenshots 2025-04-06_07-53-19-478.png2025-04-06_07-53-09-846.png2025-04-06_07-52-50-896.png2025-04-06_07-52-33-961.png
 
Entry  Sun Apr 6 06:51:08 2025, Hongfu LI, Xing Xu, Gregor Kosir, General, lassie screen shot 2025-04-06_06-49-37-366.png2025-04-06_06-49-25-693.png2025-04-06_06-48-51-824.png2025-04-06_06-48-27-345.png
 
Entry  Sun Apr 6 06:27:50 2025, Hongfu Li, XIng Xu, General, Lassie screen shot 2025-04-06_06-25-52-591.png2025-04-06_06-26-10-173.png2025-04-06_06-26-26-183.png2025-04-06_06-26-34-814.png
 
Entry  Sun Apr 6 05:34:29 2025, Hongfu Li, Xing Xu, General, Lassie screen shot 2025-04-06_05-32-36-496.png2025-04-06_05-32-55-394.png2025-04-06_05-33-16-769.png2025-04-06_05-33-24-921.png
 
Entry  Sun Apr 6 04:30:13 2025, Hongfu Li, Xing Xu, General, Lassie screen shot 2025-04-06_04-28-35-019.png2025-04-06_04-28-53-232.png2025-04-06_04-29-17-532.png2025-04-06_04-29-35-314.png
 
Entry  Sun Apr 6 03:31:05 2025, Hongfu Li, XIng Xu, General, Lassie screen shot 2025-04-06_03-28-52-981.png2025-04-06_03-29-11-923.png2025-04-06_03-29-37-324.png2025-04-06_03-29-46-959.png
 
Entry  Sun Apr 6 02:58:43 2025, Hongfu Li, XIng Xu, General, SIS no beam for a moment and beam back soon after call main control room 
 
Entry  Sun Apr 6 02:33:53 2025, Hongfu Li, Xing Xu, General, Lassie screen shot 2025-04-06_02-31-58-295.png2025-04-06_02-32-16-577.png2025-04-06_02-32-33-451.png2025-04-06_02-32-43-871.png
 
Entry  Sun Apr 6 01:34:53 2025, Hongfu Li, Xing Xu, General, Lassie screen shot 2025-04-06_01-32-30-778.png2025-04-06_01-32-56-333.png2025-04-06_01-33-15-859.png2025-04-06_01-33-24-377.png
 
Entry  Sun Apr 6 00:34:17 2025, Hongfu Li, Xing Xu, General, Lassie screen shot 2025-04-06_00-32-31-774.png2025-04-06_00-32-52-372.png2025-04-06_00-33-12-786.png2025-04-06_00-33-23-240.png
 
Entry  Sat Apr 5 23:31:54 2025, Hongfu Li, Xing Xu, General, Lassie screen shot  2025-04-05_23-28-53-195.png2025-04-05_23-29-28-092.png2025-04-05_23-29-47-357.png2025-04-05_23-29-58-059.png
 
Entry  Sat Apr 5 22:28:23 2025, Xinliang Yan, Wenwen Ge, General, Lassie screen shot 2025-04-05_22-29-38-652.png2025-04-05_22-29-05-564.png2025-04-05_22-29-53-762.png2025-04-05_22-30-01-198.png
 
Entry  Sat Apr 5 21:16:17 2025, Xinliang Yan, Wenwen Ge, General, Lassie screen shot 2025-04-05_21-14-11-303.png2025-04-05_21-14-02-340.png2025-04-05_21-13-41-748.png2025-04-05_21-13-15-828.png
 
Entry  Sat Apr 5 20:58:37 2025, Shahab, DAQ, removed temporary NPZ files for additional disk space 
Deleted 14 TB of unused spectrum.npz files from APPC, so that there is more disk space.

switched off the production of .tiq_spectrum.npz files to save disk space in the looper script
Entry  Sat Apr 5 20:11:57 2025, Xinliang Yan, Wenwen Ge, General, Lassie Screenshot 2025-04-05_20-11-00-112.png2025-04-05_20-10-53-903.png2025-04-05_20-11-35-564.png2025-04-05_20-11-08-744.png
 
Entry  Sat Apr 5 19:20:32 2025, Team PLEIADES, Detectors, Outside detector moved out again 
19:20 The outside and inside PLEIADES detectors are both moved back into their parking positions. Shifts should continue monitoring the leakage current
on the mesycontrol screens and enter the values every 2h in the Google spreadsheet:
https://elog.gsi.de/esr/Beavertail/34
Entry  Sat Apr 5 18:54:38 2025, Xinliang Yan, Wenwen Ge, General, Lassie screen shot 2025-04-05_18-42-25-968.png2025-04-05_18-42-14-954.png2025-04-05_18-43-33-208.png2025-04-05_18-43-14-059.png
 
Entry  Sat Apr 5 18:24:09 2025, Dima, Zac, Shahab, DAQ, RSAs stop again, due to misses IMG_4991.JPGIMG_4992.JPG
RSAs had to stop because the cycle of 1.8 came too often, both analyzers could not catch up with the file transfer.

ELOG V3.1.5-fc6679b