HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 2 of 9  Not logged in ELOG logo
ID Date Authordown Category Subject Text Attachments
  98   Mon Mar 30 14:24:46 2020 ruijiuDAQstop taking data.1. stop run0272.lmd.
2. stop NTCAP. 
  NTCAp file:
  
  101   Mon Mar 30 16:25:05 2020 ruijiuDetectorsturn down the HVturn down the hv and pull out the detector.
 
  
  102   Mon Mar 30 16:37:53 2020 ruijiuAnalysis     
  106   Tue Mar 31 15:30:43 2020 ruijiuAnalysisThe beam position on DSSD with different conditions on on the dEE spectrumI analyzed the first measurement with 206Pb81+
beam, run 250-267. 
 6x 
  111   Wed Apr 1 01:02:24 2020 ruijiuDetectorsthe detector cable is disconnected.    
  112   Wed Apr 1 01:05:36 2020 ruijiuDetectorsdetector position fixed at 60 mmThe detector cable was disconnected . We entered
and reconnected the cable.
 VID_20200401_010416.mp4 
  120   Thu Apr 2 12:52:25 2020 ruijiuGeneralsetup FRS with 2 g/cm2 degrader.Yuri sets up FRS with 2 g/cm2 degrader (previous
one is 1 g/cm2). The ESR is not changed.
The contamination should be less now.
  
  171   Thu Apr 9 11:47:28 2020 ruijiu backup data2020.4.8  12:00Started copying 
data。
2020.4.9    11:52 Copied 6.3TB 
 IMG_20200409_113155.jpg 
  172   Fri Apr 17 18:27:34 2020 ruijiuAnalysisbackup data1.connect USB harddisk  to computer lxg1254
and  copy data to sever.
 IMG_20200417_162202.jpg 
  167   Mon Apr 6 14:17:54 2020 Yuri, ShahabRunsFRS valvesWe saw reduction in ESR beam life. It turned
out that FRS has opened valves and venting
caused us reduction of the quality of vacuum
 2020-04-06_14-22-20-965.png 
  105   Tue Mar 31 00:47:18 2020 YuriRunsS2 slits 0/+35 mm, target bump +13 mmRun start: 0276.lmd   
  81   Mon Mar 30 07:34:06 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA I_cooler = 20 mA

beam: 206Pb81+
  
  82   Mon Mar 30 08:00:40 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA I_cooler = 20 mA

beam: 206Pb81+
  
  83   Mon Mar 30 08:32:05 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 20 mA I_cooler = 20 mA

beam: 206Pb81+
  
  84   Mon Mar 30 08:56:04 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 10 mA I_cooler = 10 mA

beam: 206Pb81+
  
  85   Mon Mar 30 09:26:37 2020 TinoRunsStopped Second measurement with 206Pb81+ beam at I_cooler = 10 mA Stopped Data recording for Restart of the
measurement
  
  86   Mon Mar 30 09:34:02 2020 TinoRunsRestart of second measurement with 206Pb81+ beam at I_cooler = 10 mA Stopped Data recording for Restart of the
measurement
  
  87   Mon Mar 30 10:01:31 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 10 mA

I_cooler = 10 mA
  
  88   Mon Mar 30 10:32:01 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 10 mA

I_cooler = 10 mA
  
  89   Mon Mar 30 10:57:43 2020 TinoRunsSecond measurement with 206Pb81+ beam at I_cooler = 10 mA

I_cooler = 10 mA
  
ELOG V3.1.5-fc6679b