32
|
Sat Mar 28 11:28:11 2020 |
Ragan, RuiJiu, Mei, Yuri, Tino | General | ESR open | ESR is open now |
|
137
|
Fri Apr 3 13:39:58 2020 |
Ragan, Mei, Shahab, Laszlo | Runs | Eight hour measurement (S2: 0/35 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 8 hr
|
|
130
|
Fri Apr 3 04:36:21 2020 |
Ragan, Pierre-Michel, Dima | General | Electron cooler problem which was then solved | 04:09 Electron cooler had some problem when
we were stacking for 2 hours measurement.
04:20 GECEBG2T and GECEBG5T were Reset and |
|
169
|
Mon Apr 6 20:03:50 2020 |
Ragan | General | Experiment finished )) | E121 experiment is finished with the last
10 hours measurement at 19:47 ))
Many thanks to everyone for there significant |
|
20
|
Fri Mar 27 13:04:17 2020 |
Ragan | General | FRS Settings until now | Yuri and Helmut have been extensively involved
in tuning and optimizing of the FRS.
|
|
167
|
Mon Apr 6 14:17:54 2020 |
Yuri, Shahab | Runs | FRS valves | We saw reduction in ESR beam life. It turned
out that FRS has opened valves and venting
caused us reduction of the quality of vacuum |
|
151
|
Sat Apr 4 19:55:37 2020 |
Ragan, Alex, Esther | Runs | Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) | FAILED - measurement was stopped by sudden
loss of the beam
|
|
63
|
Mon Mar 30 00:32:32 2020 |
Ragan | Runs | First measurement with 206Pb81+ beam | beam: 206Pb81+
energy: 400 MeV/u
|
|
64
|
Mon Mar 30 01:01:53 2020 |
Ragan | Runs | First measurement with 206Pb81+ beam | beam: 206Pb81+
energy: 400 MeV/u
|
|
66
|
Mon Mar 30 01:25:57 2020 |
Ragan | Runs | First measurement with 206Pb81+ beam | 01:17 Problem with SIS is solved
01:19 run start 0258.lmd
|
|
68
|
Mon Mar 30 02:00:46 2020 |
Ragan | Runs | First measurement with 206Pb81+ beam |
beam: 206Pb81+
energy: 400 MeV/u
|
|
67
|
Mon Mar 30 01:43:58 2020 |
Ragan | General | First measurement with 206Pb81+ beam pattern details | The following shows the pattern for first
measurement in ESR (gas jet is on for = 60*5
secs = 300 secs as it can be seen on step |
|
114
|
Thu Apr 2 02:38:32 2020 |
Ragan, Yuri, Sergey, Esther, Oliver | Runs | First measurement with zero storage time | beam: 205Tl81+ (with no scraping)
energy: 400 MeV/u
storage time: zero
|
|
59
|
Sun Mar 29 21:34:46 2020 |
Ragan | Runs | First run | beam: 206Pb81+
energy: 400 MeV/u
|
|
145
|
Sat Apr 4 10:32:16 2020 |
Ragan, Shahab | Runs | Five hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 5 hr
|
|
158
|
Sun Apr 5 15:28:35 2020 |
Ragan, Alex, Esther | Runs | Four hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
|
7x |
134
|
Fri Apr 3 11:59:50 2020 |
Ragan, Pierre-Michel, Dima | Runs | Four hour measurement (S2: 0/35 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
|
|
56
|
Sun Mar 29 18:55:19 2020 |
Shahab | Runs | Frequency list for identification | Here are some frequencies for identification
of the fragments.
|
|
5
|
Fri Dec 7 11:39:41 2018 |
Jan Glorius | SlowControl | GUI for remote control of MSCF+MHV4 | We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
|
|
8
|
Tue May 7 15:52:47 2019 |
Chen, Sidhu | SlowControl | GUI for remote control of MSCF+MHV4 [detailed] | We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
|
|