HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 8 of 9  Not logged in ELOG logo
ID Date Author Category Subjectup Text Attachments
  122   Thu Apr 2 21:03:40 2020 Ragan, Yuri, Sergey, NikosRunsZero hour measurement (S2:-10/35 mm)beam: 205Tl81+ (no scraping, Al ~1g/cm2)
energy: 400 MeV/u
storage time: zero hrs
  
  157   Sun Apr 5 13:05:43 2020 Ragan, ShahabRunsZero measurement (S2: 0/35 mm and S6: -20/7 mm)beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
 2020-04-05_13-04-08-686.png22A1BDA0-CAC3-4CB3-951E-F99ACD9CAED6.jpeg2020-04-05_13-58-21-916.pngCC28F701-F809-4100-982D-25E67770CAA7.jpeg 
  110   Tue Mar 31 23:31:41 2020 ShahabRunsalpha_p calibrationVc = 212849.9349
Ic = 0.2
 ap_calibration.jpg 
  171   Thu Apr 9 11:47:28 2020 ruijiu backup data2020.4.8  12:00Started copying 
data。
2020.4.9    11:52 Copied 6.3TB 
 IMG_20200409_113155.jpg 
  172   Fri Apr 17 18:27:34 2020 ruijiuAnalysisbackup data1.connect USB harddisk  to computer lxg1254
and  copy data to sever.
 IMG_20200417_162202.jpg 
  39   Sat Mar 28 15:23:05 2020 Alex, Ragan, Mei Bai Generalbeam lifetime measurementWe see two species in the Schottky spectra
during the beam lifetime measurement without
the target. The one (probably the primiary
 15854053877798703970476301545600.jpg 
  53   Sun Mar 29 14:01:45 2020 ruijiu beam position on DSSDmove the detector 1cm 
outside.from 60mm to 
70mm.
 IMG_20200329_140003.jpg 
  16   Tue Feb 25 15:49:58 2020 ruijiu chenDAQchanging scaling factor.How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
  
  146   Sat Apr 4 13:41:04 2020 ShahabRunscooler downcooler is down. only one device is off GECEBG2T.
updated now it is working.
  
  168   Mon Apr 6 14:57:04 2020 ShahabRunscooler downcooler component GECEBG2T again had to be
reset.
  
  182   Mon Mar 29 16:31:09 2021 Pierre-MichelDAQcross section(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8
= 1.29595
 Pb81onAr.png 
  58   Sun Mar 29 21:02:43 2020 ruijiuAnalysisdecay line of 205Tl beamdecay line of 205Tl beam with Ar gas jet target
on and S6 slit at -8mm
Ar gas density~1e12 atoms/cm2
 main_s6_neg8_202003292059.pngmain_s6_neg8_202003292059.root 
  112   Wed Apr 1 01:05:36 2020 ruijiuDetectorsdetector position fixed at 60 mmThe detector cable was disconnected . We entered
and reconnected the cable.
 VID_20200401_010416.mp4 
  54   Sun Mar 29 14:29:13 2020 ruijiu e121_run_00240.lmds6 positon at 50mm.   
  41   Sat Mar 28 16:12:25 2020 ruijiu, raganDAQenter ESR and turn on the HV crate.    
  176   Mon Nov 2 16:45:55 2020 JanDAQf_user & mbslogAttached is the f_user.c and the mbslog.l
files.
The readout function is for the following
 f_user.cmbslog.l 
  175   Thu Oct 1 22:20:03 2020 JanDAQfinal unpacker configWe identified an issue with randomly missing
adc channels in all lmd-files before run
0273.
 E121.specdet_mapping.hh 
  7   Tue Mar 12 12:54:58 2019 Chen, SidhuDAQhow to start DAQ and plot histogram.[B]1. login litv-exp account[/B]
rchen@lxg1254:/data.local2/2002_238UIMS$
ssh -X litv-exp@lxg0155.gsi.de
 000000000001_edit.png55_PM.pngdrawing-1.png 
  180   Tue Dec 8 15:47:07 2020 JanDetectorsmanual preamp & shaper settings for CsISiPhosattached is a document showing fotos of all
involved amplifiers in the chain to document
the manual settings active during the experiment.
 amp_settings.pdf 
  40   Sat Mar 28 16:09:50 2020 AlexGeneralno beam in the ESRRagan and Ruijiu went in the ESR for short
time to fix something with the slow control
of the silicon detector.
  
ELOG V3.1.5-fc6679b